FDOT letting results, December 4, 2024

13 contracts let by Florida DOT on December 4, 2024, $78,920,558 in low bids, a median of 3 bidders per contract.

Owner
Florida DOT
Contracts
13
Low bids, total
$78,920,558
Data through
28 OCT 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
T3931SR 8 (I-10) FROM E OF SHOAL RIVER BRIDGE TO W OF SR 285District 32C.W. Roberts Contracting, Inc.$15,783,066$16,241,099+3.0%FDOT
T2A07SR 26 (NEWBERRY RD) FROM W OF CR 241 S TO W OF SR 93 (I-75)District 24Preferred Materials Inc.$11,498,947$12,894,027+12%FDOT
T2A08SR 24 (NE WALDO RD) FROM S OF SR 26 TO N OF SR 222District 24Preferred Materials Inc.$7,959,842$8,129,080+2.0%FDOT
T4675SR 5 (US 1) FROM N OF SE FISCHER ST TO N OF SE DECKER AVEDistrict 44Timothy Rose Contracting, Inc.$7,514,766$7,646,194+2.0%FDOT
T5840SR 25 (US 27) FROM CR 33 TO MIDDLESEX RDDistrict 54C.W. Roberts Contracting, Inc.$6,691,438$6,773,001+1.0%FDOT
T2A10SR 228 (POST ST) FROM CASSAT AVE TO OLD ROOSEVELT BLVDDistrict 24Watson Civil Construction, Inc.$6,439,145$7,349,636+14%FDOT
T3907SR 292 (GULF BEACH HWY) FROM CR 292A TO MANCHESTER STDistrict 33Roads, Inc. of NWF$6,190,327$7,234,576+17%FDOT
T5841SR 401 FROM SR 528 TO CAPE CANAVERAL SPACE FORCE STATIONDistrict 53Masci General Contractors, Inc$5,577,919$6,001,008+8.0%FDOT
T2A09SR 13 FROM SR 16 TO RAFTER TAIL LNDistrict 24Hubbard Construction Company$4,685,902$4,908,062+5.0%FDOT
T5842SR 600/15 (US 17-92 / S VOLUSIA AVE) AT ENTERPRISE RDDistrict 53Carr Construction, LLC$1,964,413$2,120,682+8.0%FDOT
T9046SR 93 (I-75) AT PUNTA GORDA NB AND SB WEIGH STATIONSStateWide1E. B. Morris General Contractors, Inc.$1,772,936FDOT
T6605SR A1A (HARDING AVE) AT 87TH ST, AT 89TH ST AND AT 90TH STDistrict 62Florida Signal & Lighting Contractors, Inc.$1,755,688$1,809,903+3.0%FDOT
T6590SR 932 (NE 103 ST) FROM E OF NE 2 AVE TO W OF NE 6TH AVEDistrict 63National Traffic Solution, Inc$1,086,169$1,457,844+34%FDOT
FDOT contracts let on December 4, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy