FDOT letting results, November 13, 2024
12 contracts let by Florida DOT on November 13, 2024, $75,882,290 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 12
- Low bids, total
- $75,882,290
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T3916 | SR 366 (STADIUM DR) FROM PENSACOLA ST TO GAINES ST | District 3 | 3 | C.W. Roberts Contracting, Inc. | $11,025,063 | $11,732,666 | +6.0% | FDOT |
| T7541 | SR 586 (CURLEW RD) FROM E OF LANDMARK DR TO SR 584 (TAMPA RD | District 7 | 4 | Burgess Civil, LLC | $10,810,202 | $12,607,901 | +17% | FDOT |
| T3918 | SR 10 (US 90) FROM W OF 4 LN TO DUVAL ST | District 3 | 4 | C.W. Roberts Contracting, Inc. | $9,993,770 | $10,493,983 | +5.0% | FDOT |
| T2A04 | SR 134 (103RD ST) FROM SAMARITAN WAY TO SHINDLER DR | District 2 | 5 | Duval Asphalt Products, Inc. | $8,797,466 | $8,980,830 | +2.0% | FDOT |
| T2A02 | SR 200 (US 301) FROM MARION CO LINE TO N OF 203RD ST | District 2 | 4 | Anderson Columbia Co., Inc. | $7,419,960 | $7,652,683 | +3.0% | FDOT |
| T1898 | SR 80 AND SR 82 FROM VERONICA SHOWMAKER BLVD TO KINGSTON... | District 1 | 2 | Wright Construction Group, Inc. | $7,155,811 | $7,607,495 | +6.0% | FDOT |
| T2A06 | SR 19 FROM CROSS FLORIDA BARGE CANAL BRIDGETO S OF NICOLE DR | District 2 | 3 | Halifax Paving, Inc. | $6,571,980 | $9,010,939 | +37% | FDOT |
| T7536 | SR 54 FROM MARATHON RD TO E OF GUNN HWY | District 7 | 4 | Ajax Paving Industries of Florida LLC | $5,776,172 | $6,434,169 | +11% | FDOT |
| T3905 | SR 30 (US 98) FROM APALACHICOLA RIVER BRIDGE TO FRANKLIN ST | District 3 | 3 | Roberts and Roberts, Inc. | $4,631,224 | $4,721,787 | +2.0% | FDOT |
| T2A27 | SR A1A (AVENIDA MENENDEZ) FROM KING ST TO CASTILLO DR | District 2 | 2 | Hinson, James D., Electrical Contracting Company, Inc. | $1,746,198 | $1,798,025 | +3.0% | FDOT |
| T3936 | SR 20, SR 73, SR 30 (US 98), SR 30A, SR 73 AND SR 69 AT VAR | District 3 | 3 | TRP Construction Group, LLC | $993,728 | $1,156,645 | +16% | FDOT |
| T3911 | SR 10 (US 90) AT NORTH/SOUTH AIRPORT RD | District 3 | 1 | Ingram Signalization, Inc. | $960,717 | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.