FDOT letting results, October 30, 2024
16 contracts let by Florida DOT on October 30, 2024, $159,488,969 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 16
- Low bids, total
- $159,488,969
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5834 | SR 9 (I-95) FROM S OF SR 514 (MALBAR RD) TO N OF SR 519 (... | District 5 | 5 | P & S Paving, Inc. | $63,268,311 | $67,446,907 | +7.0% | FDOT |
| T3910 | SR 79 FROM S OF MILLERS FERRY RD TO S OF MALLORY RD | District 3 | 3 | Anderson Columbia Co., Inc. | $17,420,147 | $18,830,000 | +8.0% | FDOT |
| T5832 | SR 430 (MASON AVE) FROM CLYDE MORRIS BLVD TO E OF BEACH ST | District 5 | 3 | Chinchor Electric Inc. | $11,980,091 | $14,062,551 | +17% | FDOT |
| T2999 | SR 20 (US 27) FROM THE LAFAYETTE CO LINE TO THE COLUMBIA CO | District 2 | 1 | Anderson Columbia Co., Inc. | $9,621,507 | FDOT | ||
| T6604 | SR 860 (MIAMI GARDENS DR) FROM W OF NW 27 AVE TO W OF NW 2ND | District 6 | 4 | General Asphalt Company, LLC | $9,471,458 | $10,426,811 | +10% | FDOT |
| T2A01 | SR26 FROM NE/SE 1ST ST TO W OF THE ALACHUA CO LINE | District 2 | 3 | Anderson Columbia Co., Inc. | $8,804,081 | $9,660,124 | +10% | FDOT |
| T1890 | SR 64, FROM PEAR ST TO S BARLOW RD | District 1 | 3 | Superior Asphalt, Inc. | $6,929,206 | $7,183,435 | +4.0% | FDOT |
| T7517 | SR 400 WB (I-4) FROM 50TH ST TO W OF MLK JR BLVD | District 7 | 3 | C.W. Roberts Contracting, Inc. | $5,836,819 | $6,270,442 | +7.0% | FDOT |
| T7524 | SR 54 FROM W OF VIRGINIA CITY DR TO OLD MILL POND DR | District 7 | 5 | Preferred Materials Inc. | $5,431,188 | $5,757,576 | +6.0% | FDOT |
| T6607 | SR 953 (LEJEUNE RD/SW 42ND AVE) FROM N OF SW 8TH ST TO S OF | District 6 | 2 | Bacallao Construction & Engineering Development, LLC D/B/A B | $3,986,113 | $3,991,110 | 0.0% | FDOT |
| T2A13 | SR 228 (NORMANDY BLVD) FROM E OF LANE AVE TO CASSAT AVE | District 2 | 4 | Hubbard Construction Company | $3,440,497 | $3,485,606 | +1.0% | FDOT |
| T3903 | SR 166 (CAVERNS RD) FROM CHIPOLA RIVER BRIDGE TO SR 71 | District 3 | 3 | Anderson Columbia Co., Inc. | $3,355,890 | $3,898,120 | +16% | FDOT |
| T5835 | SR 44 (SOUTH ST) FROM W MAIN ST TO N OF TAFFY LN | District 5 | 3 | C.W. Roberts Contracting, Inc. | $3,081,418 | $3,136,001 | +2.0% | FDOT |
| T3896 | SR 20 FROM E OF CR 1641 (DEMPSEY BARRON RD) TO E OF SR 65 | District 3 | 2 | Roberts and Roberts, Inc. | $2,986,323 | $3,187,210 | +7.0% | FDOT |
| T4695 | DAVIE BLVD EXT (PETERS RD) FROM SW 51ST AVE TO SR 7 (US 441) | District 4 | 5 | Weekley Asphalt Paving, Inc. | $2,565,294 | $2,779,796 | +8.0% | FDOT |
| T4690 | SR 804 (E OCEAN AVE) FROM SR 5 (US 1) TO SR A1A | District 4 | 4 | Weekley Asphalt Paving, Inc. | $1,310,626 | $1,446,048 | +10% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.