FDOT letting results, September 25, 2024
15 contracts let by Florida DOT on September 25, 2024, $349,090,597 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 15
- Low bids, total
- $349,090,597
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T2987 | SR 23 (FIRST COAST XWAY) FROM E OF CR 2209 TO E OF CR 16A | District 2 | 4 | De Moya Asphalt Joint Venture | $242,641,067 | $248,798,362 | +3.0% | FDOT |
| T4681 | SR A1A FROM SHERMAN ST TO SR 822 (SHERIDAN ST), FROM ... | District 4 | 1 | Mastec Civil LLC | $34,279,000 | FDOT | ||
| T4700 | SR 70 (OKEECHOBEE RD)FROM IDEAL HOLDING RD TO W OF KINGS HWY | District 4 | 5 | Halley Engineering Contractors, Inc. | $16,890,973 | $18,181,800 | +8.0% | FDOT |
| T1902 | SR 25 (US 27) FROM S OF HORN RD TO S OF SHORELINE DR | District 1 | 3 | Ohla USA Inc | $14,858,608 | $17,787,509 | +20% | FDOT |
| T4714 | SR 5 (US 1) OVER EARMAN RIVER (C-17) BRIDGE NO 930003 | District 4 | 5 | Ferreira Construction Co., Inc. | $13,692,603 | $13,944,467 | +2.0% | FDOT |
| T3883 | SR 296 (BRENT LN / BAYOU BLVD) FROM SR 291 (DAVIS HWY) TO... | District 3 | 3 | C.W. Roberts Contracting, Inc. | $5,259,487 | $5,736,485 | +9.0% | FDOT |
| T3923 | SR 99 (BEULAH RD) FROM SR 10A (US 90) (MOBILE HWY) TO ISAACS | District 3 | 3 | Roads, Inc. of NWF | $4,380,007 | $5,628,128 | +28% | FDOT |
| T2A12 | SR A1A (SR 200) FROM O'NEIL SCOTT RD TO AMELIA RIVER | District 2 | 4 | Preferred Materials Inc. | $4,071,019 | $4,601,756 | +13% | FDOT |
| T4701 | SR 7 (US 441) AT ROYAL PALM BLVD / COPANS RD | District 4 | 6 | Weekley Asphalt Paving, Inc. | $3,974,099 | $4,391,913 | +11% | FDOT |
| T6598 | SR 959 (RED RD) (SW-NW 57TH AVE) FROM N OF SW 8TH ST TO N OF | District 6 | 4 | Bacallao Construction & Engineering Development, LLC D/B/A B | $2,627,713 | $2,908,476 | +11% | FDOT |
| T2997 | SR 24 (ARCHER RD) AT SW 143RD ST AND SW 111TH TERR | District 2 | 4 | C.W. Roberts Contracting, Inc. | $2,499,454 | $2,839,796 | +14% | FDOT |
| T5833 | SR 5 (S RIDGEWOOD AVE) AT SPRUCE CREEK BRIDGES AND FROM ... | District 5 | 3 | P & S Paving, Inc. | $2,100,000 | $2,193,774 | +4.0% | FDOT |
| T1895 | LEE JACKSON HIGHWAY (12TH ST) FROM STUART AVE TO BAKER AVE | District 1 | 6 | Environmental Land Development | $1,414,901 | $1,839,736 | +30% | FDOT |
| T9041 | SR 5 (US 17) AT YULEE WEIGH STATION | StateWide | 1 | Acme Barricades LC | $211,688 | FDOT | ||
| T9043 | SR 10 (US 90) AT PENSACOLA WEIGH STATION | StateWide | 2 | Acme Barricades LC | $189,979 | $319,377 | +68% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way