Acme Barricades LC: FDOT bid record
Acme Barricades LC submitted 24 bids on Florida DOT contracts in the data, from 29 APR 2020 to 28 OCT 2026, and was the low bidder on 10 of them (42%). When it was not low, its total sat a median +54% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $5,631,805
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 3 | 100% |
| 2021 | 2 | 2 | 100% |
| 2022 | 4 | 2 | 50% |
| 2023 | 7 | 0 | 0% |
| 2024 | 5 | 2 | 40% |
| 2025 | 2 | 0 | 0% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 11 | 5 | 45% |
| District 2 | 5 | 2 | 40% |
| StateWide | 3 | 3 | 100% |
| District 5 | 3 | 0 | 0% |
| District 1 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 16 | 10 (63%) | $0.17 | $0.13 |
| Work zone sign | 0102-60 | ED | 20 | 7 (35%) | $1.00 | $0.25 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 13 | 4 (31%) | $5.00 | $5.00 |
| Single post sign, F&I ground mount, UP to 12 SF | 0700-1-11 | AS | 7 | 4 (57%) | $375.00 | $406.23 |
| Single post sign, remove | 0700-1-60 | AS | 7 | 4 (57%) | $40.00 | $31.94 |
| Single post sign, F&I ground mount, 12-20 SF | 0700-1-12 | AS | 6 | 4 (67%) | $857.50 | $1,338.75 |
| Sign beacon, F&I ground mount- solar powered, one beacon | 0700-12-21 | AS | 6 | 4 (67%) | $6,475.00 | $7,210.00 |
| Single post sign, relocate | 0700-1-50 | AS | 5 | 4 (80%) | $125.00 | $250.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 12 | 3 (25%) | $12.50 | $5.90 |
| Portable changeable message sign, temporary | 0102-99 | ED | 9 | 3 (33%) | $20.00 | $12.00 |
| Thermoplastic, remove existing thermoplastic pavement markings- surface to remain | 0711-17-1 | SF | 9 | 3 (33%) | $2.00 | $4.50 |
| Traffic control officer | 0102-14 | HR | 7 | 3 (43%) | $90.00 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Emerald Coast Striping, LLC. | 16 | 10 of 16 |
| TRP Construction Group, LLC | 12 | 12 of 12 |
| Oglesby Construction, Inc. | 8 | 8 of 8 |
| Akca, LLC | 7 | 5 of 7 |
| McShea Contracting, LLC | 3 | 1 of 3 |
| Alexander Design + Build, LLC | 2 | 2 of 2 |
| Chinchor Electric Inc. | 1 | 0 of 1 |
| Hinson, James D., Electrical Contracting Company, Inc. | 1 | 0 of 1 |
| Powercore, Inc. | 1 | 0 of 1 |
| Rogar Management & Consulting of Florida LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T3A06 | District 3 | SR 95 (US 29 / N CENTURY BLVD) FROM POND ST TO ALABAMA STATE LINE | 1 of 2 | $312,146 | Low, 2.0% under the second |
| 27 AUG 2025 | T3986 | District 3 | SR 10 (US 90) FROM W OF BYRD RD TO OPPORTUNITY LN | 3 of 3 | $230,660 | +117% |
| 29 JAN 2025 | T3974 | District 3 | SR 30 (US 98), SR 10 (US 90), SR 12, SR 61 (US 319), SR 369 | 3 of 4 | $788,671 | +19% |
| 13 NOV 2024 | T3936 | District 3 | SR 20, SR 73, SR 30 (US 98), SR 30A, SR 73 AND SR 69 AT VAR | 3 of 3 | $1,247,045 | +25% |
| 25 SEP 2024 | T9041 | StateWide | SR 5 (US 17) AT YULEE WEIGH STATION | 1 of 1 | $211,688 | Low |
| 25 SEP 2024 | T9043 | StateWide | SR 10 (US 90) AT PENSACOLA WEIGH STATION | 1 of 2 | $189,979 | Low, 68% under the second |
| 22 MAY 2024 | T5827 | District 5 | DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN... | 4 of 4 | $1,053,823 | +25% |
| 24 APR 2024 | T2982 | District 2 | DISTRICT WIDE RUMBLE STRIPS AT VARIOUS LOCATIONS AS SHOWN... | 4 of 4 | $4,390,870 | +44% |
| 06 DEC 2023 | T5820 | District 5 | SR A1A, SR 5, SR 44, SR 11, SR 415 AND SR 5A | 6 of 6 | $1,193,109 | +96% |
| 06 DEC 2023 | T5821 | District 5 | SR 35, SR 25, SR 45, SR 500, SR 19 AND SR 200 | 6 of 6 | $1,353,361 | +60% |
| 25 OCT 2023 | T2980 | District 2 | SR 20, SR 21, SR 26, SR 100, SR A1A, SR 312, SR 207, SR 16, | 4 of 5 | $1,939,494 | +63% |
| 25 OCT 2023 | T3889 | District 3 | VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 4 of 4 | $2,365,068 | +51% |
| 27 SEP 2023 | T1871 | District 1 | 45224115201 | 5 of 5 | $6,008,626 | +62% |
| 13 SEP 2023 | T3886 | District 3 | DISTRICT WIDE AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 4 of 4 | $2,287,458 | +58% |
| 24 MAY 2023 | T3860 | District 3 | DISTRICT WIDE RURAL CURVE INITIATIVE | 2 of 2 | $2,697,614 | +13% |
| 27 APR 2022 | T2852 | District 2 | DISTRICTWIDE SAFETY PUSH BUTTON, ON SYSTEM (2ND) | 3 of 5 | $833,085 | +71% |
| 30 MAR 2022 | T2861 | District 2 | SR 228, SR A1A AND SR 5 | 1 of 1 | $439,832 | Low |
| 23 FEB 2022 | T1803 | District 1 | DISTRICT-WIDE | 5 of 5 | $4,634,688 | +16% |
| 26 JAN 2022 | T3811 | District 3 | DISTRICT 3 SCHOOL ZONE IMPLEMENTATION PLAN | 1 of 2 | $1,327,870 | Low, 65% under the second |
| 27 OCT 2021 | T9027 | StateWide | SR 8 (I-10) | 1 of 3 | $564,819 | Low, 15% under the second |
| 17 FEB 2021 | T3770 | District 3 | GADSDEN CO SAFE ROUTES TO SCHOOL | 1 of 2 | $224,915 | Low, 39% under the second |
| 20 MAY 2020 | T3737 | District 3 | SR 30 (US 98) | 1 of 1 | $163,087 | Low |
| 29 APR 2020 | T2762 | District 2 | DISTRICT WIDE SCHOOL ZONE IMPROVEMENTS | 1 of 5 | $1,596,635 | Low, 9.0% under the second |
| 29 APR 2020 | T3748 | District 3 | SAFETY PROJECT | 1 of 2 | $600,835 | Low, 51% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.