Oglesby Construction, Inc.: FDOT bid record

Oglesby Construction, Inc. submitted 14 bids on Florida DOT contracts in the data, from 29 AUG 2018 to 22 MAY 2024, and was the low bidder on 1 of them (7%). When it was not low, its total sat a median +16% above the low bid.

Owner
Florida DOT
Low bid volume
$1,180,815
Latest bid
22 MAY 2024
Data through
28 OCT 2026
14Bids
1Low bids
7Win rate, percent
+16%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
2018100%
2022100%
2023600%
20246117%
Oglesby Construction, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 56117%
District 2300%
District 3200%
District 1200%
District 4100%
Oglesby Construction, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Ground-in rumble strips, 8" sinusoidal0546-72-3GM135 (38%)$2,300.00$2,367.50
Traffic control officer0102-14HR84 (50%)$20.00$80.00
Arrow board / advance warning arrow panel0102-76ED113 (27%)$20.00$5.90
Raised pavement marker, type B0706-1-3EACH112 (18%)$8.50$5.00
Painted pavement markings, standard, yellow, skip, 6"0710-11231GM72 (29%)$450.00$582.89
Thermoplastic, refurbishment, yellow, skip, 6"0711-12231GM111 (9%)$1,350.00$1,375.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED71 (14%)$0.30$0.13
Painted pavement markings, standard, white, solid, 6"0710-11101GM71 (14%)$1,000.00$1,350.00
Painted pavement markings, standard, yellow, solid, 6"0710-11201GM71 (14%)$1,000.00$1,350.00
Oglesby Construction, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
TRP Construction Group, LLC139 of 13
Akca, LLC104 of 10
Acme Barricades LC80 of 8
Emerald Coast Striping, LLC.72 of 7
McShea Contracting, LLC54 of 5
Alexander Design + Build, LLC31 of 3
Oglesby Construction, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
22 MAY 2024T5826District 5DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN...1 of 3$1,180,815Low, 15% under the second
22 MAY 2024T5827District 5DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN...3 of 4$867,676+3.0%
22 MAY 2024T5828District 5DISTRICTWIDE RUMBLE STRIPES AT VARIOUS LOCATIONS AS SHOWN...2 of 3$494,848+3.0%
31 JAN 2024T1886District 1DISTRICTWIDE RUMBLE STRIPS, AT VARIOUS LOCATIONS AS SHOWN3 of 4$3,857,879+16%
31 JAN 2024T2981District 2SR 222/26, SR 20/25, SR 45, SR 20, SR 200, SR 26/24/20 ...2 of 4$3,202,380+10%
31 JAN 2024T4678District 4DISTRICTWIDE RUMBLE STRIPS AT VARIOUS LOCATIONS AS SHOWN ...4 of 4$834,502+28%
06 DEC 2023T5820District 5SR A1A, SR 5, SR 44, SR 11, SR 415 AND SR 5A2 of 6$628,263+3.0%
06 DEC 2023T5821District 5SR 35, SR 25, SR 45, SR 500, SR 19 AND SR 2002 of 6$864,253+2.0%
25 OCT 2023T2980District 2SR 20, SR 21, SR 26, SR 100, SR A1A, SR 312, SR 207, SR 16,2 of 5$1,632,858+37%
25 OCT 2023T3889District 3VARIOUS LOCATIONS AS SHOWN IN THE PLANS3 of 4$1,861,252+19%
27 SEP 2023T1871District 1452241152013 of 5$4,135,054+12%
13 SEP 2023T3886District 3DISTRICT WIDE AT VARIOUS LOCATIONS AS SHOWN IN THE PLANS2 of 4$1,789,407+24%
27 APR 2022T2852District 2DISTRICTWIDE SAFETY PUSH BUTTON, ON SYSTEM (2ND)2 of 5$642,890+32%
29 AUG 2018T5627District 5SR 5 (US 1)3 of 3$177,187+27%
Oglesby Construction, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy