FDOT letting results, October 25, 2023
19 contracts let by Florida DOT on October 25, 2023, $354,790,903 in low bids, a median of 3 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 19
- Low bids, total
- $354,790,903
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T3685 | SR 8 (I-10) AT SR 95 (US 29) INTERCHANGE | District 3 | 2 | Webber, LLC | $236,284,147 | $274,104,070 | +16% | FDOT |
| T6596 | SR 90 (US 41 / SW 8 ST), OVER SR 90 (US 41 / SW 8 ST) AND .. | District 6 | 3 | De Moya Highway Infrastructure LLC | $37,718,871 | $37,998,394 | +1.0% | FDOT |
| T5811 | SR 19 FROM SR 50 TO W OLEANDER AVE AND FROM S ... see plans | District 5 | 3 | C.W. Roberts Contracting, Inc. | $15,324,226 | $16,676,446 | +9.0% | FDOT |
| T3807 | SR 390 OVER MILL BAYOU, BRIDGE NO. 460020 | District 3 | 2 | Murphree Bridge Corporation | $9,896,610 | $10,249,797 | +4.0% | FDOT |
| T4651 | VARIOUS LOCATIONS AS SHOWN IN THE PLANS | District 4 | 4 | Ohla USA Inc | $7,152,200 | $7,174,540 | 0.0% | FDOT |
| T5799 | SR 15 (US 17) FROM SR 15A TO S OF SPRING ST | District 5 | 3 | Southland Construction, Inc. | $7,000,000 | $8,281,377 | +18% | FDOT |
| T3865 | SR 95 (US 29) FROM SR 97 (ATMORE HWY) TO N OF CHAMPION DR | District 3 | 3 | C.W. Roberts Contracting, Inc. | $6,205,064 | $6,418,095 | +3.0% | FDOT |
| T2948 | SR 152 (BAYMEADOWS RD) FROM BAYBERRY RD TO SR 115 | District 2 | 4 | Duval Asphalt Products, Inc. | $5,794,236 | $5,976,461 | +3.0% | FDOT |
| T9030 | SR 9 (I-95) AT FLAGLER WEIGH STATION | StateWide | 5 | Chinchor Electric Inc. | $5,555,556 | $5,922,297 | +7.0% | FDOT |
| T5814 | SR 527 (ORANGE AVE) FROM CLAY AVE TO S ORLANDO AVE | District 5 | 4 | Atlantic Civil Constructors Corp | $3,714,443 | $3,725,527 | 0.0% | FDOT |
| T2947 | SR 51 (US 129) FROM THE SUWANNEE COUNTY LINE TO I-75 | District 2 | 1 | Anderson Columbia Co., Inc. | $3,629,114 | FDOT | ||
| T3880 | SR 71 FROM S OF BRITT AVE TO THE CALHOUN COUNTY LINE | District 3 | 3 | Roberts and Roberts, Inc. | $3,380,216 | $3,697,072 | +9.0% | FDOT |
| T6574 | SR 916 (OPA-LOCKA BLVD) (NW 135 ST) (NW 136 ST) FROM W OF... | District 6 | 9 | Bacallao Construction & Engineering Development, LLC D/B/A B | $3,338,573 | $3,434,426 | +3.0% | FDOT |
| T5815 | SR 400 (I-4) FROM WORLD DR TO ORANGE COUNTY LINE | District 5 | 3 | Hubbard Construction Company | $2,720,932 | $3,305,620 | +21% | FDOT |
| T7523 | SR 694 (GANDY BLVD) EB EXIT RAMP AND FRONTAGE RD AT 94TH... | District 7 | 5 | Preferred Materials Inc. | $2,049,777 | $2,224,523 | +9.0% | FDOT |
| T3889 | VARIOUS LOCATIONS AS SHOWN IN THE PLANS | District 3 | 4 | Emerald Coast Striping, LLC. | $1,570,117 | $1,727,463 | +10% | FDOT |
| T3870 | SR 30 (US 98) (GULF BREEZE PKWY) AT SOUNDSIDE DR INTERSEC... | District 3 | 3 | C.W. Roberts Contracting, Inc. | $1,240,715 | $1,774,800 | +43% | FDOT |
| T2980 | SR 20, SR 21, SR 26, SR 100, SR A1A, SR 312, SR 207, SR 16, | District 2 | 5 | TRP Construction Group, LLC | $1,193,458 | $1,632,858 | +37% | FDOT |
| T1879 | SR 35 (US 98) FROM W OF 2ND ST TO W OF 5TH ST | District 1 | 1 | Highway Safety Devices, Inc. | $1,022,648 | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.