Southland Construction, Inc.: FDOT bid record
Southland Construction, Inc. submitted 35 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 30 SEP 2026, and was the low bidder on 9 of them (26%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $134,636,872
- Latest bid
- 30 SEP 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 0 | 0% |
| 2019 | 5 | 3 | 60% |
| 2020 | 3 | 1 | 33% |
| 2021 | 5 | 3 | 60% |
| 2023 | 2 | 1 | 50% |
| 2024 | 5 | 1 | 20% |
| 2025 | 4 | 0 | 0% |
| 2026 | 6 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 5 | 32 | 8 | 25% |
| District 1 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sediment barrier | 0104-10-3 | LF | 32 | 22 (69%) | $0.94 | $2.60 |
| Performance turf, sod | 0570-1-2 | SY | 33 | 20 (61%) | $3.15 | $5.00 |
| Litter removal | 0107-1 | ACRE | 31 | 16 (52%) | $26.00 | $52.98 |
| Removal of existing concrete | 0110-4-10 | SY | 30 | 14 (47%) | $17.05 | $33.96 |
| Regular excavation | 0120-1 | CY | 34 | 13 (38%) | $8.93 | $25.47 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 52 | 12 (23%) | $27.00 | $30.82 |
| Embankment | 0120-6 | CY | 32 | 11 (34%) | $16.83 | $30.04 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 27 | 11 (41%) | $72.80 | $86.00 |
| Concrete traffic separator, special- variable width | 0520-70 | SY | 14 | 11 (79%) | $69.20 | $121.76 |
| Traffic separator concrete- type I, 4' wide | 0520-5-11 | LF | 11 | 11 (100%) | $30.43 | $69.38 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 10 | 10 (100%) | $4,350.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 10 | 10 (100%) | $5,750.00 | $4,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Masci General Contractors, Inc | 23 | 15 of 23 |
| Hubbard Construction Company | 16 | 4 of 16 |
| Watson Civil Construction, Inc. | 15 | 3 of 15 |
| Sema Construction, Inc. | 12 | 3 of 12 |
| Ranger Construction Industries, Inc. | 12 | 2 of 12 |
| P & S Paving, Inc. | 10 | 4 of 10 |
| Atlantic Civil Constructors Corp | 9 | 4 of 9 |
| C.W. Roberts Contracting, Inc. | 7 | 6 of 7 |
| Superior Construction Company Southeast, LLC | 6 | 2 of 6 |
| Halifax Paving, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 SEP 2026 | T5893 | District 5 | SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600 | 8 of 8 | $8,777,778 | +56% |
| 29 JUL 2026 | T5883 | District 5 | SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544 | 5 of 9 | $21,260,000 | +7.0% |
| 15 JUN 2026 | T5885 | District 5 | SR 400 (I-4) FROM MP 21.540 TO MP 22.558 | 3 of 4 | $45,277,778 | +7.0% |
| 10 JUN 2026 | T5884 | District 5 | SR 400 FROM MP 22.660 TO MP 23.475 | 4 of 6 | $40,060,000 | +5.0% |
| 20 MAY 2026 | T5863 | District 5 | SR 434 FROM RANGELINE RD TO W OF SR 15/600 (US 17-92) | 5 of 6 | $7,555,556 | +26% |
| 28 JAN 2026 | T5875 | District 5 | SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 730077 | 6 of 6 | $15,944,444 | +27% |
| 11 JUN 2025 | T5851 | District 5 | SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS | 3 of 5 | $38,777,778 | +10% |
| 30 APR 2025 | T5793 | District 5 | SR 9 (I-95) FROM MP 18.355 TO MP 19.552 | 2 of 7 | $64,977,778 | +8.0% |
| 26 MAR 2025 | T5836 | District 5 | SR 60 FROM BLANKET BAY SLOUGH TO PEAVINE TR | 2 of 7 | $19,500,000 | +6.0% |
| 29 JAN 2025 | T5838 | District 5 | SR 500 (US 441) FROM WADSWORTH RD TO LAKE CO LINE | 3 of 7 | $8,044,444 | +4.0% |
| 28 AUG 2024 | T5830 | District 5 | SR 5 NB (US 1) OVER TURNBULL CREEK, BRIDGE NO 790255 | 3 of 8 | $7,100,000 | +27% |
| 22 MAY 2024 | T5813 | District 5 | SR 19 FROM N OF STEVENS AVE TO CR 452 | 1 of 4 | $12,355,556 | Low, 3.0% under the second |
| 24 APR 2024 | T1850 | District 1 | CR 664 (COUNTYLINE RD) OVER PEACE RIVER, BRIDGE NO 160101 | 6 of 8 | $7,596,600 | +44% |
| 24 APR 2024 | T5824 | District 5 | SR 46 (W 1ST ST) FROM E OF I-4 TO SR 15 (US 17/92) | 3 of 7 | $19,114,444 | +14% |
| 28 FEB 2024 | T5822 | District 5 | SR 44 (E NEW YORK AVE) AT KEPLER RD, FROM KEPLER RD TO... | 3 of 4 | $10,322,222 | +22% |
| 15 NOV 2023 | T5798 | District 5 | SR 50 (W COLONIAL DR) FROM PINE HILLS RD TO TAMPA AVE | 3 of 4 | $18,777,778 | +12% |
| 25 OCT 2023 | T5799 | District 5 | SR 15 (US 17) FROM SR 15A TO S OF SPRING ST | 1 of 3 | $7,000,000 | Low, 18% under the second |
| 25 AUG 2021 | T5720 | District 5 | SR 419 | 1 of 5 | $4,594,000 | Low, 3.0% under the second |
| 25 AUG 2021 | T5728 | District 5 | SR 400 (I-4) | 1 of 3 | $34,500,000 | Low, 9.0% under the second |
| 26 MAY 2021 | T5736 | District 5 | SR 426/CR 419 | 2 of 6 | $21,135,532 | +6.0% |
| 28 APR 2021 | T5718 | District 5 | SR 551 (GOLDENROD RD) | 1 of 4 | $11,250,000 | Low, 1.0% under the second |
| 27 JAN 2021 | T5715 | District 5 | CR 532 | 2 of 6 | $9,307,778 | +4.0% |
| 18 NOV 2020 | T1035 | District 1 | SR 400 (I-4) | 4 of 6 | $31,877,778 | +22% |
| 20 MAY 2020 | T5686 | District 5 | SR 15/SR 600 (US 17/92) | 2 of 5 | $10,449,449 | 0.0% |
| 11 MAR 2020 | T5650 | District 5 | SR 500 (US 441) | 1 of 4 | $44,960,000 | Low, 7.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.