FDOT contract T5838 bid tabulation

SR 500 (US 441) FROM WADSWORTH RD TO LAKE CO LINE. Let by Florida DOT on January 29, 2025, Orange, District 5. 7 bids received; low bid $7,714,913 by Masci General Contractors, Inc.

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
156
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Masci General Contractors, Inc$7,714,913Low
2C.W. Roberts Contracting, Inc.$7,817,335+1.0%
3Southland Construction, Inc.$8,044,444+4.0%
4Ranger Construction Industries, Inc.$8,170,868+6.0%
5Atlantic Civil Constructors Corp$8,460,472+10%
6Hubbard Construction Company$9,509,326+23%
7Watson Civil Construction, Inc.$9,922,250+29%
FDOT contract T5838: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Masci General Contractors, Inc2. C.W. Roberts Contracting, Inc.3. Southland Construction, Inc.4. Ranger Construction Industries, Inc.5. Atlantic Civil Constructors Corp6. Hubbard Construction Company
0005Mobilization (0101-1)LS1$731,489$792,000$763,300$808,000$857,315$950,000
0010Maintenance of traffic (0102-1)DA1$232,000$688,185$292,270$605,250$377,744$925,000
0015Special detour- temporary pavement (0102-2200)SY1$95,400$113,000$100,000$117,700$184,422$299,000
0020Special detour- temporary earthwork/base (0102-2300)CY1$128,158$220,000$138,000$216,455$271,646$60,000
0025Traffic control officer (0102-14)HR3,620$95.00$106.00$95.00$0.01$85.00$85.00
0030Work zone sign (0102-60)ED22,186$0.24$0.25$0.27$0.25$0.21$0.24
0035Temporary barrier, F&I, low profile, concrete (0102-71-13)LF884$45.00$47.00$40.00$40.25$35.00$35.00
0040Temporary barrier, F&I, anchored (0102-71-15)LF1,836$48.00$44.00$33.00$0.01$33.00$38.70
0045Temporary barrier, relocate, low profile concrete (0102-71-23)LF216$17.00$17.25$21.50$21.85$19.00$14.00
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED63,330$0.12$0.15$0.12$0.10$0.09$0.11
0055Temporary separator, F&I remove (0102-75-1)LF338$21.00$22.00$30.00$21.85$19.00$84.00
0060Arrow board / advance warning arrow panel (0102-76)ED1,348$7.00$5.75$5.00$5.75$5.00$4.50
0065Temporary crash cushion, redirective option (0102-89-1)LO5$1,300.00$1,262.00$1,230.00$0.01$3,101.44$1,090.00
0070Portable changeable message sign, temporary (0102-99)ED912$12.00$10.30$12.00$10.35$9.00$10.50
0075Temporary signalization and maintenance, intersection (0102-104)ED290$40.13$37.75$49.00$41.55$12.60$28.00
0080Temporary traffic detection and maintenance, intersection (0102-107-1)ED290$40.13$23.98$1.00$41.55$12.60$30.00
0085Type III barricade (0102-115)ED964$0.39$0.34$0.28$0.35$0.30$0.25
0090Portable regulatory, sign (0102-150-1)ED1,160$5.00$4.60$4.80$4.60$4.00$4.25
0095Radar speed display unit (0102-150-2)ED1,160$5.00$4.60$4.80$4.60$4.00$4.25
0100Sediment barrier (0104-10-3)LF4,915$2.00$1.41$1.10$2.55$2.13$2.29
0105Soil tracking prevention device (0104-15)EACH1$3,500.00$2,500.00$3,500.00$2,000.00$3,439.19$9,494.78
0110Inlet protection system (0104-18)EACH20$125.00$171.00$190.00$160.90$186.24$187.98
0115Litter removal (0107-1)ACRE223.17$63.00$74.00$19.00$46.00$134.88$30.00
0120Mowing (0107-2)ACRE200.24$110.00$142.00$85.00$114.90$158.11$103.74
0125Clearing & grubbing (0110-1-1)ACRE1$210,000$293,000$224,000$485,000$456,337$592,000
0130Removal of existing concrete (0110-4-10)SY2,857$31.00$28.50$20.30$28.15$23.79$43.41
0135Mailbox, F&I single (0110-7-1)EACH6$300.00$300.00$190.00$247.40$393.36$150.00
0140Regular excavation (0120-1)CY11,635$21.35$22.15$13.00$22.90$28.58$19.55
0145Embankment (0120-6)CY4,035$17.59$25.76$17.00$12.90$39.04$39.43
0150Type B stabilization (0160-4)SY15,284$19.72$16.00$17.00$15.80$23.52$17.22
0155Optional base, base group 01 (0285-701)SY914$34.27$40.83$35.20$25.20$35.59$16.61
0160Optional base, base group 02 (0285-702)SY1,174$43.40$54.35$80.00$70.00$58.72$84.25
0165Optional base, base group 09 (0285-709)SY2,626$48.78$26.55$28.00$25.35$33.71$24.23
0170Optional base, base group 11 (0285-711)SY2,629$49.91$46.04$32.50$27.50$32.90$27.84
0175Optional base, base group 12 (0285-712)SY5,979$55.27$64.30$88.80$51.00$80.06$96.75
0180Turnout construction- asphalt/driveway base- asphalt material (0286-2)TN236.80$419.30$385.00$100.00$223.00$294.36$282.55
0185Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY4,551$2.70$6.02$6.80$6.80$10.00$7.25
0190Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY7,566$3.25$5.55$6.60$7.75$10.00$7.85
0195Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY1,974$2.83$5.19$5.10$2.85$10.00$21.60
0200Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY29,648$4.83$3.99$5.60$6.15$5.00$11.70
0205Superpave asphaltic conc, traffic C (0334-1-13)TN9,109.10$151.20$115.60$165.00$176.00$142.00$171.70
0210Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN1,862.80$215.76$225.00$307.00$264.00$235.00$296.30
0215Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN450.60$179.05$205.00$290.00$208.00$175.00$238.20
0220Miscellaneous asphalt (0339-1)TN12.50$331.00$739.00$850.00$637.00$439.99$407.10
0225Inlets, curb, type P-1, <10' (0425-1311)EACH5$14,890$8,475.00$11,510$8,980.00$9,968.38$6,998.41
0230Inlets, DT bot, type C,<10' (0425-1521)EACH3$7,390.00$4,320.00$8,125.00$5,680.00$6,036.06$5,403.76
0235Inlets, DT bot, type D, <10' (0425-1541)EACH3$8,120.00$6,030.00$8,700.00$5,760.00$6,952.58$6,040.54
0240Inlets, DT bot, type E, <10' (0425-1551)EACH8$7,940.00$5,120.00$9,900.00$6,890.00$7,200.70$7,498.50
0245Inlets, gutter, type S, <10' (0425-1701)EACH3$7,390.00$5,836.00$8,160.00$6,760.00$7,124.48$4,904.22
0250Manholes, P-8, <10' (0425-2-61)EACH1$10,135$5,333.00$7,700.00$6,270.00$7,470.69$4,437.56
0255Pipe culvert, optional material, round, 18"SD (0430-174118)LF223$158.34$100.00$211.00$105.70$121.93$135.91
0260Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218)LF76$186.30$138.00$202.00$167.60$125.34$150.60
0265Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF1,458$158.34$131.10$261.00$114.40$122.84$138.68
0270Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF544$186.30$163.50$237.00$163.90$140.12$172.08
0275Pipe culvert,optional material,other-elip/arch, (0430-175218)LF395$186.30$137.60$188.00$139.10$144.21$160.32
0280Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224)LF202$226.59$206.00$260.00$191.60$184.01$209.80
0285Straight concrete endwalls, single, 0 degrees, round (0430-518100)EACH1$5,873.00$4,398.00$5,030.00$4,770.00$5,176.61$2,338.43
0290Straight concrete endwalls, single, 0 degrees, round (0430-524100)EACH1$7,210.00$4,642.00$5,700.00$5,460.00$5,867.79$3,539.23
0295Mitered end section, optional round, 24" CD (0430-982129)EACH1$3,100.00$3,445.00$3,280.00$3,690.00$2,435.91$2,892.71
0300Mitered end section, optional round, 18" SD (0430-984125)EACH9$2,700.00$2,638.00$2,290.00$2,450.00$2,175.24$2,144.83
0305Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625)EACH2$3,497.00$2,693.00$2,220.00$2,570.00$2,279.08$2,695.09
0310Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629)EACH1$4,429.00$3,445.00$5,820.00$2,810.00$2,492.08$5,128.69
0315Concrete curb & gutter, type E (0520-1-7)LF4,666$43.12$38.00$30.00$41.30$60.22$33.79
0320Concrete curb & gutter, type F (0520-1-10)LF859$50.90$68.75$41.00$65.00$47.71$33.24
0325Shoulder gutter- concrete (0520-6)LF415$69.30$41.25$37.00$75.00$53.96$36.97
0330Concrete sidewalk and driveways, 6" thick (0522-2)SY1,271$99.50$79.15$79.00$96.20$77.73$78.96
0335Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY812$115.79$85.75$61.40$243.50$65.01$98.68
0340Detectable warnings (0527-2)SF124$35.42$32.00$28.20$35.45$29.22$30.54
0345Guardrail -roadway, general (0536-1-1)LF324$25.29$25.20$29.20$25.45$22.00$22.16
0350Guardrail end treatment- trailing anchorage (0536-85-20)EACH1$2,353.00$1,765.00$1,860.00$1,790.00$1,650.00$1,553.22
0355Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$4,215.00$4,217.00$3,500.00$4,270.00$3,150.00$3,710.84
0360Raised rumble strip set- permanent (0546-71-1)EACH1$650.00$568.00$560.00$574.50$1,582.23$500.00
0365Performance turf, sod (0570-1-2)SY24,318$3.75$3.71$3.50$4.55$6.94$3.90
0370Performance turf, sod and shoulder treatment index (0570-1-3)SY903$5.95$3.71$12.60$4.85$15.10$25.76
0375Conduit, furnish & install, open trench (0630-2-11)LF12$21.10$23.65$60.70$21.20$31.30$11.00
0380Conduit, furnish & install, directional bore (0630-2-12)LF78$33.58$55.95$51.20$32.70$42.70$29.00
0385Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$2,332.00$2,156.60$1,470.00$2,340.00$1,234.40$1,050.00
0390Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH4$2,750.00$2,953.40$2,670.00$2,720.00$1,883.90$1,799.00
0395Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH4$2,750.00$2,528.35$2,070.00$2,760.00$2,608.50$987.00
0400Traffic monitoring site cabinet, furnish & install, type 3, pedestal mount (0695-7132)EACH1$11,000$10,422$7,200.00$11,300$7,311.40$7,116.00
0405Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$1,240.00$1,771.00$4,080.00$1,150.00$806.50$686.00
0410Raised pavement marker, type B (0706-1-3)EACH3,972$5.00$4.50$4.50$4.60$4.00$4.00
0415Painted pavement markings, standard, white, solid, 6" (0710-11101)GM6.32$1,650.00$1,499.30$1,490.00$1,520.00$1,320.00$1,319.37
0420Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.77$2,750.00$1,641.35$1,635.00$1,660.00$1,450.00$1,444.37
0425Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF478$1.95$0.56$0.60$0.55$0.50$0.50
0430Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF858$2.95$0.84$0.85$0.85$0.75$0.75
0435Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF599$3.95$1.15$1.15$1.15$1.00$1.00
0440Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM2.07$605.00$840.45$845.00$858.50$750.00$750.36
0445Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.10$1,210.00$1,557.00$1,600.00$1,570.00$1,425.00$1,370.19
0450Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.92$765.00$846.00$845.00$855.50$750.00$752.45
0455Painted pavement markings, standard, white, message or symbol (0710-11160)EACH24$85.00$57.00$56.00$57.50$50.00$50.00
0460Painted pavement markings, standard, white, arrows (0710-11170)EACH103$50.00$40.00$39.00$40.25$35.00$35.00
0465Painted pavement markings, standard, white, yield line (0710-11180)LF52$15.00$4.50$4.50$4.60$4.00$4.00
0470Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM4.28$1,650.00$1,484.26$1,488.00$1,520.00$1,320.00$1,318.77
0475Painted pavement markings, standard, yellow, solid for interchange and urban island, (0710-11202)GM0.04$2,650.00$1,554.29$1,634.00$1,590.00$750.00$1,380.95
0480Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF491$2.95$2.81$2.80$2.60$2.50$2.50
0485Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.39$765.00$824.60$845.00$842.00$750.00$751.93
0490Initial contingency amount, DO not bid (0999-25)LS1$89,000$89,000$89,000$89,000$89,000$89,000
0495Raised rumble strip set- permanent (0546-71-1)EACH4$650.00$568.00$565.00$574.50$500.00$500.00
0500Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM2.10$7,100.00$7,397.00$5,270.00$2,980.00$7,944.38$4,374.58
0505Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH40$550.00$453.00$450.00$458.50$399.00$399.00
0510Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$2,300.00$1,981.00$1,970.00$2,000.00$1,744.00$1,744.00
0515Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH1$2,500.00$2,194.00$2,180.00$2,220.00$1,931.00$1,931.00
0520Single column ground sign assembly, relocate (0700-1500)EACH11$450.00$378.40$375.00$383.00$333.00$333.00
0525Single column ground sign assembly, remove (0700-1600)EACH24$65.00$45.00$46.00$46.00$40.00$40.00
0530Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH2$13,200$7,719.00$7,650.00$7,810.00$6,793.00$6,793.00
0535Multi-column ground sign assembly, relocate (0700-2500)EACH1$8,000.00$4,621.00$4,600.00$4,670.00$4,067.00$4,067.00
0540Sign panel, relocate, UP to 12 SF (0700-3501)EACH2$165.00$113.00$113.00$115.00$100.00$100.00
0545Enhanced hwy sign assembly, solar powered, F&I ground mount, W/highlighted sign <12 12-20 SF of static panels (0700-142142)EACH1$12,500$10,201$10,000$10,300$8,977.00$8,977.00
0550Tubular marker, 36" yellow (0704-1-4)EACH10$295.00$256.00$255.00$258.60$225.00$225.00
0555Object marker, type 1 (0705-10-1)EACH3$330.00$228.00$226.00$229.90$200.00$200.00
0560Delineator, flexible tubular (0705-11-1)EACH10$120.00$123.80$124.00$126.40$110.00$110.00
0565Raised pavement marker, type B (0706-1-3)EACH1,686$5.00$4.50$4.50$4.60$4.00$4.00
0570Painted pavement markings, surface (0710-90)LS1$48,000$16,790$16,600$17,000$14,775$14,775
0575Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.31$9,500.00$11,885$11,900$12,100$10,560$10,560
0580Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF478$5.00$4.00$3.95$4.00$3.50$3.50
0585Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF858$7.00$5.06$5.05$5.15$4.50$4.50
0590Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF155$9.00$6.19$6.20$6.30$5.50$5.50
0595Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.85$2,650.00$1,473.38$1,488.00$1,500.00$1,320.00$1,324.68
0600Thermoplastic, standard, message or symbol (0711-11160)EACH6$220.00$284.00$282.00$287.40$250.00$250.00
0605Thermoplastic, standard, arrow (0711-11170)EACH62$107.00$85.25$84.60$86.20$75.00$75.00
0610Thermoplastic, standard, yield line (0711-11180)LF27$24.00$14.00$13.50$13.80$12.00$12.00
0615Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF491$7.00$5.06$5.00$5.15$4.50$4.50
0620Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.36$2,750.00$1,473.36$14,883$1,500.00$1,320.00$1,309.09
0625Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF394$19.90$16.00$15.80$16.10$14.00$14.00
0630Thermoplastic, preformed, white, message (0711-14160)EACH14$250.00$323.00$321.00$327.50$285.00$285.00
0635Thermoplastic, preformed, white, arrow (0711-14170)EACH14$150.00$142.00$141.00$143.70$125.00$125.00
0640Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM2.75$6,700.00$7,414.72$7,440.00$7,570.00$6,600.00$6,612.02
0645Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.24$11,500$11,534$11,900$11,800$10,560$10,694
0650Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM2.07$1,800.00$1,848.99$1,860.00$1,890.00$1,650.00$1,650.80
0655Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM1.83$6,700.00$7,403.84$7,440.00$7,560.00$6,600.00$6,614.46
0660Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.40$7,200.00$5,913.03$5,950.00$6,040.00$5,280.00$5,253.73
0665Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.52$7,200.00$5,931.19$5,950.00$6,060.00$5,280.00$5,269.87
0670Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH1$1,500.00$1,062.99$368.00$1,440.00$806.00$874.00
0675Light pole complete, remove pole and foundation (0715-69000)EACH5$2,250.00$1,373.22$2,239.94$2,300.00$1,245.50$2,200.00
0680Itsfm location documentation- intersection (0611-2-1)EACH1$4,110.00$3,836.00$2,010.00$3,880.00$3,600.00$2,750.00
0685Conduit, furnish & install, open trench (0630-2-11)LF297$22.40$24.04$41.20$22.55$31.30$20.00
0690Conduit, furnish & install, directional bore (0630-2-12)LF246$38.19$74.08$62.40$39.30$42.70$35.00
0695Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$18,435$11,642$20,390$18,900$12,543$9,968.00
0700Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH18$2,239.00$2,150.00$1,480.00$2,340.00$1,234.40$1,050.00
0705Fiber optic splice vault, & install, 54"W X 54"L X 48"D (0635-4-11)EACH1$16,165$14,528$22,100$16,600$11,572$23,968
0710Electrical service wire, & install (0639-2-1)LF19$9.00$9.50$11.20$7.55$9.20$4.00
0715Aluminum signals pole, (0646-1-11)EACH6$3,927.00$4,029.00$3,495.00$4,120.00$2,369.80$3,526.00
0720Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH8$950.00$565.55$757.00$989.00$612.30$575.00
0725Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$1,599.00$1,213.00$1,116.00$1,530.00$975.20$587.00
0730Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$24,283$32,070$25,000$24,600$21,769$19,744
0735Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH3$12,377$10,686$9,870.00$13,300$8,262.10$8,002.00
0740Pedestrian detector, furnish & install, standard (0665-1-11)EACH6$450.00$424.60$372.00$449.00$395.80$384.00
0745Traffic controller assembly, F&I, NEMA (0670-5110)AS1$53,699$56,191$60,100$57,100$53,961$55,008
0750Traffic controller assembly, remove controller with (0670-5600)AS1$3,980.00$3,099.00$1,150.00$3,740.00$965.70$1,373.00
0755Managed field ethernet switch, furnish & install (0684-1-1)EACH1$5,944.50$6,545.00$4,830.00$6,130.00$4,393.90$4,691.00
0760Wireless communication device, furnish & install ethernet subscriber unit (0684-6-12)EACH1$19,494$15,063$17,200$20,100$12,666$15,394
0765Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$17,432$14,850$14,600$18,200$21,966$8,401.00
0770Remote power management rpmu, furnish and install (0685-2-1)EACH1$2,475.00$885.00$2,111.00$2,270.00$2,587.20$1,415.00
0775Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH3$9,640.00$8,768.00$10,170$9,930.00$8,161.20$6,928.00
0780Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH2$7,988.50$9,233.00$5,700.00$8,030.00$7,984.00$10,686
FDOT contract T5838: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy