Ranger Construction Industries, Inc.: FDOT bid record

Ranger Construction Industries, Inc. submitted 250 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 23 of them (9%). When it was not low, its total sat a median +17% above the low bid.

Owner
Florida DOT
Low bid volume
$138,200,055
Latest bid
28 OCT 2026
Data through
28 OCT 2026
250Bids
23Low bids
9Win rate, percent
+17%Median gap to the low bid when not low, 227 bids

By year

YearBidsLow bidsWin rate
20182115%
201929621%
20202514%
20214537%
202235411%
202326312%
20242100%
202529414%
20261915%
Ranger Construction Industries, Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 4118108%
District 577810%
District 63000%
District 118422%
District 75120%
District 2200%
Ranger Construction Industries, Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED24063 (26%)$0.10$0.13
Embankment0120-6CY18962 (33%)$23.85$30.04
Removal of existing concrete0110-4-10SY21058 (28%)$23.86$33.96
Work zone sign0102-60ED24148 (20%)$0.24$0.25
Regular excavation0120-1CY17846 (26%)$20.75$25.47
Channelizing device- pedestrian LCD (longitudinal channelizing device)0102-74-8FD13444 (33%)$0.05$0.07
Disputes review board, meeting- DO not bid0999-20-1DA4141 (100%)$3,900.00$3,900.00
Disputes review board, hearing- DO not bid0999-20-2EACH4141 (100%)$4,500.00$4,500.00
Type B stabilization0160-4SY17040 (24%)$15.88$15.00
Conduit, furnish & install, open trench0630-2-11LF32933 (10%)$17.40$16.54
Sediment barrier0104-10-3LF19133 (17%)$2.17$2.60
Conduit, furnish & install, directional bore0630-2-12LF40932 (8%)$32.29$30.82
Ranger Construction Industries, Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ranger Construction Industries, Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T4765District 4SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE6 of 6$9,546,901+26%
30 SEP 2026T6593District 6SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY5 of 5$4,953,312+66%
26 AUG 2026T4757District 4SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27)12 of 12$8,526,888+40%
26 AUG 2026T4764District 4SR 512 FROM E OF I-95 TO W OF 106TH AVE3 of 9$2,467,235+7.0%
26 AUG 2026T5890District 5SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE3 of 6$6,247,187+14%
29 JUL 2026T4745District 4SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY)3 of 6$5,788,888+9.0%
29 JUL 2026T5883District 5SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.5443 of 9$21,106,328+6.0%
29 JUL 2026T6595District 6SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST12 of 12$5,479,889+25%
10 JUN 2026T1930District 1SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE4 of 5$5,025,888+5.0%
10 JUN 2026T4766District 4SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1)6 of 8$1,595,655+26%
10 JUN 2026T5886District 5SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD2 of 9$2,745,775+9.0%
10 JUN 2026T5888District 5SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE6 of 8$31,394,556+17%
20 MAY 2026T4666District 4SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD)4 of 8$64,463,862+18%
20 MAY 2026T5882District 5ELLIS RD FROM J RODES BLVD TO WICKHAM RD4 of 10$40,575,770+27%
29 APR 2026T4738District 4SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE..7 of 7$21,399,648+34%
25 MAR 2026T4740District 4SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD)8 of 9$7,244,769+14%
25 MAR 2026T5876District 5SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST5 of 6$27,997,755+5.0%
25 FEB 2026T4739District 4SR 9 (I-95) FROM N OF GLADES TO N OF SR 91 (FLORIDA TPK)1 of 5$5,138,833Low, 17% under the second
28 JAN 2026T5874District 5SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ...4 of 5$11,387,371+20%
29 OCT 2025T4727District 4SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 (3 of 13$6,216,489+27%
27 AUG 2025T4702District 4SR 7 (US 441) AT LAKE WORTH RD6 of 8$3,579,817+5.0%
27 AUG 2025T4715District 4SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 849 of 9$9,118,924+33%
27 AUG 2025T5872District 5SR 438 (SILVER STAR RD) FROM COAST LINE DR TO DARDANELLE DR4 of 4$3,778,528+43%
30 JUL 2025T4674District 4SR 80 (SOUTHERN BLVD RAMPS) AT SR 7 (US 441)3 of 4$9,741,875+18%
30 JUL 2025T4716District 4SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD2 of 8$6,023,042+1.0%
Ranger Construction Industries, Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy