Ranger Construction Industries, Inc.: FDOT bid record
Ranger Construction Industries, Inc. submitted 250 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 23 of them (9%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $138,200,055
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 21 | 1 | 5% |
| 2019 | 29 | 6 | 21% |
| 2020 | 25 | 1 | 4% |
| 2021 | 45 | 3 | 7% |
| 2022 | 35 | 4 | 11% |
| 2023 | 26 | 3 | 12% |
| 2024 | 21 | 0 | 0% |
| 2025 | 29 | 4 | 14% |
| 2026 | 19 | 1 | 5% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 118 | 10 | 8% |
| District 5 | 77 | 8 | 10% |
| District 6 | 30 | 0 | 0% |
| District 1 | 18 | 4 | 22% |
| District 7 | 5 | 1 | 20% |
| District 2 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 240 | 63 (26%) | $0.10 | $0.13 |
| Embankment | 0120-6 | CY | 189 | 62 (33%) | $23.85 | $30.04 |
| Removal of existing concrete | 0110-4-10 | SY | 210 | 58 (28%) | $23.86 | $33.96 |
| Work zone sign | 0102-60 | ED | 241 | 48 (20%) | $0.24 | $0.25 |
| Regular excavation | 0120-1 | CY | 178 | 46 (26%) | $20.75 | $25.47 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 134 | 44 (33%) | $0.05 | $0.07 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 41 | 41 (100%) | $3,900.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 41 | 41 (100%) | $4,500.00 | $4,500.00 |
| Type B stabilization | 0160-4 | SY | 170 | 40 (24%) | $15.88 | $15.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 329 | 33 (10%) | $17.40 | $16.54 |
| Sediment barrier | 0104-10-3 | LF | 191 | 33 (17%) | $2.17 | $2.60 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 409 | 32 (8%) | $32.29 | $30.82 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 93 | 76 of 93 |
| Halley Engineering Contractors, Inc. | 76 | 39 of 76 |
| Ohla USA Inc | 74 | 54 of 74 |
| C.W. Roberts Contracting, Inc. | 73 | 42 of 73 |
| Weekley Asphalt Paving, Inc. | 64 | 49 of 64 |
| Hubbard Construction Company | 44 | 15 of 44 |
| Asphalt Group, Inc. | 43 | 24 of 43 |
| The Stout Group LLC | 41 | 27 of 41 |
| Horizon Contractors, Inc. | 40 | 23 of 40 |
| Roadway Construction, LLC | 39 | 29 of 39 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T4765 | District 4 | SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE | 6 of 6 | $9,546,901 | +26% |
| 30 SEP 2026 | T6593 | District 6 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | 5 of 5 | $4,953,312 | +66% |
| 26 AUG 2026 | T4757 | District 4 | SR 93 (I-75) FROM SR 869 (I-595) TO SR 25 (US 27) | 12 of 12 | $8,526,888 | +40% |
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 3 of 9 | $2,467,235 | +7.0% |
| 26 AUG 2026 | T5890 | District 5 | SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE | 3 of 6 | $6,247,187 | +14% |
| 29 JUL 2026 | T4745 | District 4 | SR 882 FOREST HILL BLVD) FROM E OF LAKE CLARKE DR TO US1 (DIXIE HWY) | 3 of 6 | $5,788,888 | +9.0% |
| 29 JUL 2026 | T5883 | District 5 | SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.544 | 3 of 9 | $21,106,328 | +6.0% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 12 of 12 | $5,479,889 | +25% |
| 10 JUN 2026 | T1930 | District 1 | SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE | 4 of 5 | $5,025,888 | +5.0% |
| 10 JUN 2026 | T4766 | District 4 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | 6 of 8 | $1,595,655 | +26% |
| 10 JUN 2026 | T5886 | District 5 | SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD | 2 of 9 | $2,745,775 | +9.0% |
| 10 JUN 2026 | T5888 | District 5 | SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE | 6 of 8 | $31,394,556 | +17% |
| 20 MAY 2026 | T4666 | District 4 | SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD) | 4 of 8 | $64,463,862 | +18% |
| 20 MAY 2026 | T5882 | District 5 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | 4 of 10 | $40,575,770 | +27% |
| 29 APR 2026 | T4738 | District 4 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | 7 of 7 | $21,399,648 | +34% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 8 of 9 | $7,244,769 | +14% |
| 25 MAR 2026 | T5876 | District 5 | SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST | 5 of 6 | $27,997,755 | +5.0% |
| 25 FEB 2026 | T4739 | District 4 | SR 9 (I-95) FROM N OF GLADES TO N OF SR 91 (FLORIDA TPK) | 1 of 5 | $5,138,833 | Low, 17% under the second |
| 28 JAN 2026 | T5874 | District 5 | SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ... | 4 of 5 | $11,387,371 | +20% |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 3 of 13 | $6,216,489 | +27% |
| 27 AUG 2025 | T4702 | District 4 | SR 7 (US 441) AT LAKE WORTH RD | 6 of 8 | $3,579,817 | +5.0% |
| 27 AUG 2025 | T4715 | District 4 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | 9 of 9 | $9,118,924 | +33% |
| 27 AUG 2025 | T5872 | District 5 | SR 438 (SILVER STAR RD) FROM COAST LINE DR TO DARDANELLE DR | 4 of 4 | $3,778,528 | +43% |
| 30 JUL 2025 | T4674 | District 4 | SR 80 (SOUTHERN BLVD RAMPS) AT SR 7 (US 441) | 3 of 4 | $9,741,875 | +18% |
| 30 JUL 2025 | T4716 | District 4 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | 2 of 8 | $6,023,042 | +1.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.