FDOT contract T5876 bid tabulation

SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST. Let by Florida DOT on March 25, 2026, Brevard, District 5. 6 bids received; low bid $26,645,998 by Timothy Rose Contracting, Inc..

Owner
Florida DOT
Letting
25 MAR 2026
Pay items
144
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Timothy Rose Contracting, Inc.$26,645,998Low
2Preferred Materials Inc.$26,917,659+1.0%
3C.W. Roberts Contracting, Inc.$27,692,661+4.0%
4Ohla USA Inc$27,996,699+5.0%
5Ranger Construction Industries, Inc.$27,997,755+5.0%
6Masci General Contractors, Inc$47,241,229+77%
FDOT contract T5876: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Timothy Rose Contracting, Inc.2. Preferred Materials Inc.3. C.W. Roberts Contracting, Inc.4. Ohla USA Inc5. Ranger Construction Industries, Inc.6. Masci General Contractors, Inc
0005Mobilization (0101-1)LS1$2,189,195$1,492,206$800,000$2,790,000$1,740,243$4,288,888
0010Maintenance of traffic (0102-1)DA1$369,000$1,160,788$500,000$1,000,000$828,015$2,988,752
0015Traffic control officer (0102-14)HR3,340$82.70$105.00$74.00$85.00$85.00$110.00
0020Work zone sign (0102-60)ED61,812$0.01$0.21$0.23$0.25$0.25$0.45
0025Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED82,914$0.01$0.10$0.12$0.10$0.10$0.21
0030Arrow board / advance warning arrow panel (0102-76)ED368$0.01$4.50$6.00$5.65$5.00$9.00
0035Portable changeable message sign, temporary (0102-99)ED1,472$9.30$10.00$12.00$11.30$11.10$22.00
0040Existing ITS maintenance (0102-112)DA500$155.97$150.00$175.00$156.50$172.95$332.00
0045Type III barricade (0102-115)ED108$0.01$0.30$0.50$0.35$0.35$0.55
0050Portable regulatory, sign (0102-150-1)ED972$5.17$4.50$6.00$5.65$5.00$11.00
0055Radar speed display unit (0102-150-2)ED972$5.17$4.50$6.00$5.65$5.00$11.00
0060Sediment barrier (0104-10-3)LF62,307$2.00$0.98$0.50$0.01$0.01$1.98
0065Inlet protection system (0104-18)EACH238$103.37$100.00$165.00$200.00$227.05$224.00
0070Litter removal (0107-1)ACRE6,793.80$25.84$25.00$14.50$22.35$27.70$75.00
0075Mowing (0107-2)ACRE3,800.52$43.42$42.00$54.00$42.85$46.55$211.00
0080Clearing & grubbing (0110-1-1)ACRE1$319,454$203,856$50,000$53,980$10,510$577,328
0085Regular excavation (0120-1)CY2.70$492.94$379.79$5.00$100.00$500.00$228.00
0090Embankment (0120-6)CY128.90$89.34$110.73$170.00$100.00$85.35$112.00
0095Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY15,434$3.00$3.47$5.40$2.00$1.85$4.82
0100Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY288,082$1.58$1.23$2.10$2.75$0.95$4.24
0105Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY221,904$1.72$1.71$3.50$2.00$1.55$4.44
0110Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11)SY179,900$1.96$1.45$3.30$2.00$1.40$4.41
0115Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15)SY84,649$2.38$1.98$4.15$2.00$1.75$4.50
0120Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17)SY24,524$4.26$2.30$5.20$2.00$2.05$4.89
0125Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20)SY5,765$6.71$2.54$5.70$2.00$2.35$5.15
0130Milling existing asphalt pavement, 8" avg depth (0327-70-34)SY5,851$24.06$9.19$18.40$7.50$5.05$9.84
0135Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52)TN23,766.80$138.41$137.81$129.00$139.00$145.60$209.00
0140Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN53,491.90$137.98$127.99$124.00$135.60$140.00$212.00
0145Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN22,296.80$176.32$222.02$215.00$182.50$190.30$298.00
0150Miscellaneous asphalt (0339-1)TN232.90$389.76$494.90$490.00$500.00$350.50$841.00
0155Guardrail -roadway, general (0536-1-1)LF2,015$21.11$25.62$21.20$20.35$22.10$27.35
0160Guardrail- roadway, double (0536-1-3)LF365$26.37$42.40$26.50$25.45$27.65$31.11
0165Rub rail for guardrail, single sided rub rail (0536-5-1)LF258$15.50$13.98$16.00$15.15$16.45$19.55
0170Special guardrail post- post for shallow mount (0536-7-3)EACH5$131.82$121.98$135.00$128.80$139.95$198.25
0175Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113)EACH5$1,294.99$897.61$1,321.00$1,265.50$1,370.00$1,555.27
0180Guardrail removal (0536-73)LF1,440$1.04$1.09$2.00$1.00$1.10$1.50
0185Guardrail end treatment- trailing anchorage (0536-85-20)EACH11$1,320.21$1,354.64$1,347.00$1,290.50$1,400.00$1,557.37
0190Guardrail end treatment- parallel approach terminal (0536-85-24)EACH10$3,024.89$2,961.80$3,086.00$2,956.50$3,210.00$3,588.88
0195Guardrail end treatment- double face approach terminal (0536-85-27)EACH4$9,334.54$10,586$9,524.00$9,123.00$9,910.00$9,988.57
0200Guardrail end treatment- double face trailing (0536-85-29)EACH2$1,671.55$1,828.12$1,705.00$1,633.50$1,770.00$1,999.98
0205Guardrail reset (0538-1)LF1,771$14.09$9.12$14.40$13.80$14.95$17.88
0210Performance turf, sod (0570-1-2)SY57,436$2.94$3.79$4.70$7.20$6.30$4.95
0215Performance turf, sod and shoulder treatment index (0570-1-3)SY1,145$5.21$8.01$5.20$8.35$7.40$11.58
0220Conduit, furnish & install, open trench (0630-2-11)LF146$9.88$9.50$20.50$9.90$20.80$14.92
0225Conduit, furnish & install, directional bore (0630-2-12)LF165$25.99$25.00$35.00$26.10$35.45$32.54
0230Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH3$1,304.01$1,550.00$1,872.00$834.60$1,900.00$1,788.00
0235Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH1$9,418.28$9,058.00$5,302.00$9,450.00$5,390.00$14,452
0240Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1)EACH13$2,516.25$2,420.00$3,452.00$2,525.00$3,490.00$2,771.00
0245Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12)EACH13$2,178.33$2,095.00$2,062.00$2,185.50$2,100.00$2,557.00
0250Traffic monitoring site cabinet, remove existing cabinet (0695-7600)EACH1$962.83$926.00$914.00$966.10$931.15$2,700.00
0255Raised pavement marker, type B (0706-1-3)EACH7,742$4.13$5.00$6.70$5.65$4.45$7.10
0260Painted pavement markings, standard, white, solid, 6" (0710-11101)GM25.58$1,418.28$2,000.00$1,563.00$1,307.50$1,520.00$2,998.00
0265Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.98$1,418.28$3,118.90$1,979.00$1,655.50$1,510.00$2,821.24
0270Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF903$1.03$2.50$2.20$1.70$1.10$3.84
0275Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM52.18$366.98$570.82$871.00$728.30$393.50$998.00
0280Painted pavement markings, standard, white, message or symbol (0710-11160)EACH1$46.52$130.00$84.00$70.05$49.90$99.28
0285Painted pavement markings, standard, white, arrows (0710-11170)EACH2$20.67$65.00$54.00$44.80$22.15$59.38
0290Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM25.10$1,418.28$2,000.40$1,563.00$1,307.00$1,520.00$29,987
0295Superpave asphaltic concrete, thick lift, traffic level E (0922-334-3)TN1,689.40$142.99$141.28$141.00$200.60$140.00$242.00
0300Disputes review board, meeting- DO not bid (0999-20-1)DA11$4,800.00$4,800.00$4,800.00$4,800.00$4,800.00$4,800.00
0305Disputes review board, hearing- DO not bid (0999-20-2)EACH2$5,750.00$5,750.00$5,750.00$5,750.00$5,750.00$5,750.00
0310Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000$150,000$150,000$150,000
0315Ground-in rumble strips, 16" (0546-72-1)GM47.14$1,109.08$1,669.27$2,660.00$1,641.50$1,690.00$1,572.00
0320Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH34$511.70$505.00$544.00$515.30$548.75$595.00
0325Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$1,964.10$1,900.00$2,044.00$1,939.00$2,110.00$3,524.00
0330Single column ground sign assembly, remove (0700-1600)EACH28$25.84$55.00$59.00$56.10$27.70$38.00
0335Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH4$9,303.62$7,380.00$7,942.00$7,530.50$9,980.00$9,111.00
0340Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH12$284.28$305.00$329.00$311.20$304.85$499.00
0345Sign panel, furnish & install ground mount, 12-20 SF (0700-3102)EACH2$361.81$680.00$732.00$693.90$388.00$812.00
0350Sign panel, furnish & install ground mount, 31-50 SF (0700-3104)EACH4$413.49$1,345.00$1,448.00$1,372.50$443.40$2,114.00
0355Sign panel, remove, UP to 12 SF (0700-3601)EACH12$10.34$70.00$76.00$71.45$11.10$39.00
0360Sign panel, remove, 12-20 SF (0700-3602)EACH2$10.34$185.00$200.00$188.80$11.10$69.00
0365Sign panel, remove, 31-50 SF (0700-3604)EACH4$10.34$280.00$302.00$285.70$11.10$271.00
0370Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH8$135.17$130.00$106.00$135.60$83.15$137.00
0375Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140)EACH8$5,851.85$5,628.00$7,387.00$5,871.50$7,470.00$11,145
0380Tubular marker, 36" white post (0704-1-3)EACH58$72.36$150.00$194.00$183.70$77.60$251.00
0385Raised pavement marker, type B (0706-1-3)EACH7,670$4.65$5.00$6.70$5.65$5.00$7.11
0390Painted pavement markings, surface (0710-90)LS1$92,938$165,000$256,144$214,200$99,700$199,982
0395Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF903$3.10$5.00$4.50$3.75$3.35$7.24
0400Thermoplastic, standard, arrow (0711-11170)EACH1$93.04$175.00$84.00$70.05$99.75$278.00
0405Thermoplastic, preformed, white, message (0711-14160)EACH2$134.39$1,400.00$257.00$214.80$144.10$555.00
0410Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM25.03$6,409.16$4,501.98$6,865.00$5,740.50$6,870.00$7,782.00
0415Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102)GM0.98$6,719.28$5,734.76$7,395.00$6,184.50$7,180.00$9,887.00
0420Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM51.47$2,480.96$1,400.35$3,238.00$2,707.50$2,660.00$1,992.00
0425Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM25.10$6,409.16$4,499.10$6,866.00$5,741.50$6,870.00$7,841.00
0430Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.36$25,947$46,484$35,338$29,552$27,500$39,998
0435Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.37$25,947$46,356$35,241$29,471$27,400$39,998
0440Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.73$6,822.65$17,047$13,803$11,704$7,240.00$35,998
0445Preformed/permanent tape, remove (0713-107)SF2,250$1.60$5.00$2.10$1.75$1.70$2.11
0450Conduit, furnish & install, open trench (0630-2-11)LF51,550$4.89$4.70$5.80$4.90$6.00$12.89
0455Conduit, furnish & install, directional bore (0630-2-12)LF6,308$22.88$22.00$34.00$22.95$35.45$32.33
0460Conduit, furnish & install, mount (0630-2-15)LF54$47.31$45.50$42.00$47.45$42.40$74.00
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH341$1,296.51$1,550.00$1,534.00$834.60$1,560.00$1,555.00
0470Junction box, furnish & install, mounted (0635-3-12)EACH4$571.88$550.00$972.00$573.80$985.50$1,228.00
0475Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112)AS3$1,611.65$1,550.00$5,533.00$1,617.00$5,600.00$9,912.00
0480Electrical service disconnect, F&I, pole mount (0639-3-11)EACH3$1,840.40$1,770.00$3,382.00$1,846.50$3,420.00$5,112.00
0485Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130)LS1$10,000$10,000$10,000$10,000$10,000$10,000
0490Prestressed concrete pole, type P-II service pole (0641-2-12)EACH3$1,440.09$1,385.00$3,356.00$1,445.00$3,390.00$7,112.00
0495Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF198,864$4.26$4.10$4.60$4.30$4.65$7.10
0500Lighting conductors, F&I, no.1/0 3/0 (0 to 000) (0715-1-15)LF4,239$8.89$8.55$9.20$8.90$9.30$15.11
0505Load center, F&I, secondary voltage (0715-7-11)EACH3$25,168$24,205$34,000$25,253$34,400$24,476
0510Luminaire, F&I, under deck, wall mount (0715-11125)EACH4$2,292.70$2,205.00$2,336.00$2,300.50$2,360.00$3,255.00
0515Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH62$821.42$790.00$1,491.00$824.20$1,510.00$1,889.00
0520Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213)EACH12$2,885.37$2,775.00$2,218.00$2,895.00$2,240.00$2,988.00
0525Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH102$8,062.54$8,300.00$11,281$7,616.00$11,420$12,224
0530Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442)EACH142$8,374.47$8,600.00$11,791$7,929.00$11,935$12,554
0535Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH247$701.85$675.00$1,140.00$704.20$1,155.00$1,269.00
0540Pole cable distribution system, wall mount (0715-500-3)EACH4$514.69$495.00$814.00$516.40$823.65$1,199.00
0545Light pole complete- special design, F&I, double arm mount, aluminum, 45' (0715-512145)EACH3$11,421$11,530$15,850$10,986$16,000$15,447
0550Itsfm subsurface documentation- project length (0611-1-1)MI12.54$3,743.19$3,599.14$3,587.00$3,755.00$3,700.00$4,111.00
0555Itsfm location documentation- ITS site (0611-2-2)EACH3$2,183.53$2,100.00$2,093.00$2,191.00$2,160.00$1,577.00
0560Conduit, furnish & install, open trench (0630-2-11)LF439$10.45$10.05$22.00$10.50$22.15$12.98
0565Conduit, furnish & install, directional bore (0630-2-12)LF2,132$23.91$23.00$34.60$24.00$35.45$32.51
0570Conduit, furnish & install, aboveground (0630-2-14)LF201$47.31$45.50$71.90$47.45$73.15$79.00
0575Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF1,927$4.42$4.25$4.30$4.45$4.45$7.10
0580Fiber optic cable, relocate, underground (0633-1420)LF230$3.38$3.25$3.30$3.40$3.35$7.00
0585Fiber optic connection, install, splice (0633-2-31)EACH6$57.19$55.00$48.00$57.40$49.90$89.00
0590Fiber optic connection, install, termination (0633-2-32)EACH48$88.38$85.00$81.00$88.70$83.15$132.00
0595Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH1$57.19$55.00$53.50$57.40$55.45$99.00
0600Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH5$98.78$95.00$92.00$99.10$94.25$141.00
0605Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH2$1,299.72$1,250.00$1,251.00$1,304.00$1,290.00$1,754.00
0610Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH2$467.90$450.00$456.00$469.50$471.15$777.00
0615Fiber optic connection hardware, relocate patch preterminated (0633-3-45)EACH1$868.21$835.00$854.00$871.20$881.30$1,211.00
0620Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51)EACH1$868.21$835.00$854.00$871.20$881.30$1,211.00
0625Fiber optic cable locator (0633-6)DA500$218.35$210.00$76.00$219.10$77.60$211.00
0630Multi-conductor cable, furnish & install, cat 6 (0633-8-11)LF190$5.98$5.75$6.00$6.00$5.90$9.20
0635Multi-conductor cable, furnish & install, composite (0633-8-12)LF768$5.98$5.75$6.00$6.00$5.90$9.20
0640Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH19$1,304.01$1,550.00$2,098.00$834.60$2,130.00$1,754.00
0645Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH5$2,187.81$2,400.00$3,514.00$1,721.50$3,560.00$3,354.00
0650Electrical service wire, & install (0639-2-1)LF1,938$16.27$15.65$16.00$16.35$16.35$19.25
0655Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$982.59$945.00$3,617.00$985.90$3,660.00$4,233.00
0660Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121)EACH2$3,436.46$3,305.00$4,622.00$3,448.00$4,670.00$5,124.00
0665Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$1,440.09$1,385.00$3,849.00$1,445.00$3,890.00$1,785.00
0670Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21)EACH1$61,139$58,800$59,793$61,346$60,400$51,111
0675Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22)EACH1$65,506$63,000$59,793$65,728$60,400$51,111
0680ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122)EACH2$12,171$11,705$12,222$12,212$12,300$9,211.00
0685ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143)EACH1$14,177$13,635$17,661$14,225$17,800$14,920
0690ITS cabinet- remove (0676-2600)EACH1$961.79$925.00$609.00$965.10$620.80$911.00
0695Managed field ethernet switch, relocate (0684-1-4)EACH1$311.93$300.00$300.00$313.00$304.85$455.00
0700Device server, furnish & install (0684-2-1)EACH1$1,086.56$1,045.00$1,068.00$1,090.50$1,100.00$1,544.00
0705Device server, relocate (0684-2-4)EACH1$207.95$200.00$188.00$208.70$194.00$331.00
0710Managed hub ethernet switch, furnish & install (0684-7-1)EACH2$7,382.40$7,100.00$7,172.00$7,407.50$7,410.00$9,999.00
0715Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12)EACH3$5,557.60$5,345.00$6,146.00$5,576.50$6,210.00$7,070.00
0720Remote power management rpmu, furnish and install (0685-2-1)EACH3$733.04$705.00$1,177.00$735.50$1,190.00$1,212.00
FDOT contract T5876: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way