FDOT contract T5876 bid tabulation
SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST. Let by Florida DOT on March 25, 2026, Brevard, District 5. 6 bids received; low bid $26,645,998 by Timothy Rose Contracting, Inc..
- Owner
- Florida DOT
- Letting
- 25 MAR 2026
- Pay items
- 144
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Timothy Rose Contracting, Inc. | $26,645,998 | Low |
| 2 | Preferred Materials Inc. | $26,917,659 | +1.0% |
| 3 | C.W. Roberts Contracting, Inc. | $27,692,661 | +4.0% |
| 4 | Ohla USA Inc | $27,996,699 | +5.0% |
| 5 | Ranger Construction Industries, Inc. | $27,997,755 | +5.0% |
| 6 | Masci General Contractors, Inc | $47,241,229 | +77% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Timothy Rose Contracting, Inc. | 2. Preferred Materials Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Ohla USA Inc | 5. Ranger Construction Industries, Inc. | 6. Masci General Contractors, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $2,189,195 | $1,492,206 | $800,000 | $2,790,000 | $1,740,243 | $4,288,888 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $369,000 | $1,160,788 | $500,000 | $1,000,000 | $828,015 | $2,988,752 |
| 0015 | Traffic control officer (0102-14) | HR | 3,340 | $82.70 | $105.00 | $74.00 | $85.00 | $85.00 | $110.00 |
| 0020 | Work zone sign (0102-60) | ED | 61,812 | $0.01 | $0.21 | $0.23 | $0.25 | $0.25 | $0.45 |
| 0025 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 82,914 | $0.01 | $0.10 | $0.12 | $0.10 | $0.10 | $0.21 |
| 0030 | Arrow board / advance warning arrow panel (0102-76) | ED | 368 | $0.01 | $4.50 | $6.00 | $5.65 | $5.00 | $9.00 |
| 0035 | Portable changeable message sign, temporary (0102-99) | ED | 1,472 | $9.30 | $10.00 | $12.00 | $11.30 | $11.10 | $22.00 |
| 0040 | Existing ITS maintenance (0102-112) | DA | 500 | $155.97 | $150.00 | $175.00 | $156.50 | $172.95 | $332.00 |
| 0045 | Type III barricade (0102-115) | ED | 108 | $0.01 | $0.30 | $0.50 | $0.35 | $0.35 | $0.55 |
| 0050 | Portable regulatory, sign (0102-150-1) | ED | 972 | $5.17 | $4.50 | $6.00 | $5.65 | $5.00 | $11.00 |
| 0055 | Radar speed display unit (0102-150-2) | ED | 972 | $5.17 | $4.50 | $6.00 | $5.65 | $5.00 | $11.00 |
| 0060 | Sediment barrier (0104-10-3) | LF | 62,307 | $2.00 | $0.98 | $0.50 | $0.01 | $0.01 | $1.98 |
| 0065 | Inlet protection system (0104-18) | EACH | 238 | $103.37 | $100.00 | $165.00 | $200.00 | $227.05 | $224.00 |
| 0070 | Litter removal (0107-1) | ACRE | 6,793.80 | $25.84 | $25.00 | $14.50 | $22.35 | $27.70 | $75.00 |
| 0075 | Mowing (0107-2) | ACRE | 3,800.52 | $43.42 | $42.00 | $54.00 | $42.85 | $46.55 | $211.00 |
| 0080 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $319,454 | $203,856 | $50,000 | $53,980 | $10,510 | $577,328 |
| 0085 | Regular excavation (0120-1) | CY | 2.70 | $492.94 | $379.79 | $5.00 | $100.00 | $500.00 | $228.00 |
| 0090 | Embankment (0120-6) | CY | 128.90 | $89.34 | $110.73 | $170.00 | $100.00 | $85.35 | $112.00 |
| 0095 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 15,434 | $3.00 | $3.47 | $5.40 | $2.00 | $1.85 | $4.82 |
| 0100 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 288,082 | $1.58 | $1.23 | $2.10 | $2.75 | $0.95 | $4.24 |
| 0105 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 221,904 | $1.72 | $1.71 | $3.50 | $2.00 | $1.55 | $4.44 |
| 0110 | Milling existing asphalt pavement, 2 1/4" avg depth (0327-70-11) | SY | 179,900 | $1.96 | $1.45 | $3.30 | $2.00 | $1.40 | $4.41 |
| 0115 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 84,649 | $2.38 | $1.98 | $4.15 | $2.00 | $1.75 | $4.50 |
| 0120 | Milling existing asphalt pavement, 3 1/4" avg depth (0327-70-17) | SY | 24,524 | $4.26 | $2.30 | $5.20 | $2.00 | $2.05 | $4.89 |
| 0125 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 5,765 | $6.71 | $2.54 | $5.70 | $2.00 | $2.35 | $5.15 |
| 0130 | Milling existing asphalt pavement, 8" avg depth (0327-70-34) | SY | 5,851 | $24.06 | $9.19 | $18.40 | $7.50 | $5.05 | $9.84 |
| 0135 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 23,766.80 | $138.41 | $137.81 | $129.00 | $139.00 | $145.60 | $209.00 |
| 0140 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 53,491.90 | $137.98 | $127.99 | $124.00 | $135.60 | $140.00 | $212.00 |
| 0145 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 22,296.80 | $176.32 | $222.02 | $215.00 | $182.50 | $190.30 | $298.00 |
| 0150 | Miscellaneous asphalt (0339-1) | TN | 232.90 | $389.76 | $494.90 | $490.00 | $500.00 | $350.50 | $841.00 |
| 0155 | Guardrail -roadway, general (0536-1-1) | LF | 2,015 | $21.11 | $25.62 | $21.20 | $20.35 | $22.10 | $27.35 |
| 0160 | Guardrail- roadway, double (0536-1-3) | LF | 365 | $26.37 | $42.40 | $26.50 | $25.45 | $27.65 | $31.11 |
| 0165 | Rub rail for guardrail, single sided rub rail (0536-5-1) | LF | 258 | $15.50 | $13.98 | $16.00 | $15.15 | $16.45 | $19.55 |
| 0170 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 5 | $131.82 | $121.98 | $135.00 | $128.80 | $139.95 | $198.25 |
| 0175 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 5 | $1,294.99 | $897.61 | $1,321.00 | $1,265.50 | $1,370.00 | $1,555.27 |
| 0180 | Guardrail removal (0536-73) | LF | 1,440 | $1.04 | $1.09 | $2.00 | $1.00 | $1.10 | $1.50 |
| 0185 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 11 | $1,320.21 | $1,354.64 | $1,347.00 | $1,290.50 | $1,400.00 | $1,557.37 |
| 0190 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 10 | $3,024.89 | $2,961.80 | $3,086.00 | $2,956.50 | $3,210.00 | $3,588.88 |
| 0195 | Guardrail end treatment- double face approach terminal (0536-85-27) | EACH | 4 | $9,334.54 | $10,586 | $9,524.00 | $9,123.00 | $9,910.00 | $9,988.57 |
| 0200 | Guardrail end treatment- double face trailing (0536-85-29) | EACH | 2 | $1,671.55 | $1,828.12 | $1,705.00 | $1,633.50 | $1,770.00 | $1,999.98 |
| 0205 | Guardrail reset (0538-1) | LF | 1,771 | $14.09 | $9.12 | $14.40 | $13.80 | $14.95 | $17.88 |
| 0210 | Performance turf, sod (0570-1-2) | SY | 57,436 | $2.94 | $3.79 | $4.70 | $7.20 | $6.30 | $4.95 |
| 0215 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 1,145 | $5.21 | $8.01 | $5.20 | $8.35 | $7.40 | $11.58 |
| 0220 | Conduit, furnish & install, open trench (0630-2-11) | LF | 146 | $9.88 | $9.50 | $20.50 | $9.90 | $20.80 | $14.92 |
| 0225 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 165 | $25.99 | $25.00 | $35.00 | $26.10 | $35.45 | $32.54 |
| 0230 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,304.01 | $1,550.00 | $1,872.00 | $834.60 | $1,900.00 | $1,788.00 |
| 0235 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 1 | $9,418.28 | $9,058.00 | $5,302.00 | $9,450.00 | $5,390.00 | $14,452 |
| 0240 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 13 | $2,516.25 | $2,420.00 | $3,452.00 | $2,525.00 | $3,490.00 | $2,771.00 |
| 0245 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 13 | $2,178.33 | $2,095.00 | $2,062.00 | $2,185.50 | $2,100.00 | $2,557.00 |
| 0250 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $962.83 | $926.00 | $914.00 | $966.10 | $931.15 | $2,700.00 |
| 0255 | Raised pavement marker, type B (0706-1-3) | EACH | 7,742 | $4.13 | $5.00 | $6.70 | $5.65 | $4.45 | $7.10 |
| 0260 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 25.58 | $1,418.28 | $2,000.00 | $1,563.00 | $1,307.50 | $1,520.00 | $2,998.00 |
| 0265 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.98 | $1,418.28 | $3,118.90 | $1,979.00 | $1,655.50 | $1,510.00 | $2,821.24 |
| 0270 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 903 | $1.03 | $2.50 | $2.20 | $1.70 | $1.10 | $3.84 |
| 0275 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 52.18 | $366.98 | $570.82 | $871.00 | $728.30 | $393.50 | $998.00 |
| 0280 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 1 | $46.52 | $130.00 | $84.00 | $70.05 | $49.90 | $99.28 |
| 0285 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 2 | $20.67 | $65.00 | $54.00 | $44.80 | $22.15 | $59.38 |
| 0290 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 25.10 | $1,418.28 | $2,000.40 | $1,563.00 | $1,307.00 | $1,520.00 | $29,987 |
| 0295 | Superpave asphaltic concrete, thick lift, traffic level E (0922-334-3) | TN | 1,689.40 | $142.99 | $141.28 | $141.00 | $200.60 | $140.00 | $242.00 |
| 0300 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 11 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0305 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0310 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0315 | Ground-in rumble strips, 16" (0546-72-1) | GM | 47.14 | $1,109.08 | $1,669.27 | $2,660.00 | $1,641.50 | $1,690.00 | $1,572.00 |
| 0320 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 34 | $511.70 | $505.00 | $544.00 | $515.30 | $548.75 | $595.00 |
| 0325 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 1 | $1,964.10 | $1,900.00 | $2,044.00 | $1,939.00 | $2,110.00 | $3,524.00 |
| 0330 | Single column ground sign assembly, remove (0700-1600) | EACH | 28 | $25.84 | $55.00 | $59.00 | $56.10 | $27.70 | $38.00 |
| 0335 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 4 | $9,303.62 | $7,380.00 | $7,942.00 | $7,530.50 | $9,980.00 | $9,111.00 |
| 0340 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 12 | $284.28 | $305.00 | $329.00 | $311.20 | $304.85 | $499.00 |
| 0345 | Sign panel, furnish & install ground mount, 12-20 SF (0700-3102) | EACH | 2 | $361.81 | $680.00 | $732.00 | $693.90 | $388.00 | $812.00 |
| 0350 | Sign panel, furnish & install ground mount, 31-50 SF (0700-3104) | EACH | 4 | $413.49 | $1,345.00 | $1,448.00 | $1,372.50 | $443.40 | $2,114.00 |
| 0355 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 12 | $10.34 | $70.00 | $76.00 | $71.45 | $11.10 | $39.00 |
| 0360 | Sign panel, remove, 12-20 SF (0700-3602) | EACH | 2 | $10.34 | $185.00 | $200.00 | $188.80 | $11.10 | $69.00 |
| 0365 | Sign panel, remove, 31-50 SF (0700-3604) | EACH | 4 | $10.34 | $280.00 | $302.00 | $285.70 | $11.10 | $271.00 |
| 0370 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 8 | $135.17 | $130.00 | $106.00 | $135.60 | $83.15 | $137.00 |
| 0375 | Enhanced highway sign AC powered, F&I ground mount, highlighted sign <12 SF (0700-141140) | EACH | 8 | $5,851.85 | $5,628.00 | $7,387.00 | $5,871.50 | $7,470.00 | $11,145 |
| 0380 | Tubular marker, 36" white post (0704-1-3) | EACH | 58 | $72.36 | $150.00 | $194.00 | $183.70 | $77.60 | $251.00 |
| 0385 | Raised pavement marker, type B (0706-1-3) | EACH | 7,670 | $4.65 | $5.00 | $6.70 | $5.65 | $5.00 | $7.11 |
| 0390 | Painted pavement markings, surface (0710-90) | LS | 1 | $92,938 | $165,000 | $256,144 | $214,200 | $99,700 | $199,982 |
| 0395 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 903 | $3.10 | $5.00 | $4.50 | $3.75 | $3.35 | $7.24 |
| 0400 | Thermoplastic, standard, arrow (0711-11170) | EACH | 1 | $93.04 | $175.00 | $84.00 | $70.05 | $99.75 | $278.00 |
| 0405 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 2 | $134.39 | $1,400.00 | $257.00 | $214.80 | $144.10 | $555.00 |
| 0410 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 25.03 | $6,409.16 | $4,501.98 | $6,865.00 | $5,740.50 | $6,870.00 | $7,782.00 |
| 0415 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.98 | $6,719.28 | $5,734.76 | $7,395.00 | $6,184.50 | $7,180.00 | $9,887.00 |
| 0420 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 51.47 | $2,480.96 | $1,400.35 | $3,238.00 | $2,707.50 | $2,660.00 | $1,992.00 |
| 0425 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 25.10 | $6,409.16 | $4,499.10 | $6,866.00 | $5,741.50 | $6,870.00 | $7,841.00 |
| 0430 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.36 | $25,947 | $46,484 | $35,338 | $29,552 | $27,500 | $39,998 |
| 0435 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.37 | $25,947 | $46,356 | $35,241 | $29,471 | $27,400 | $39,998 |
| 0440 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.73 | $6,822.65 | $17,047 | $13,803 | $11,704 | $7,240.00 | $35,998 |
| 0445 | Preformed/permanent tape, remove (0713-107) | SF | 2,250 | $1.60 | $5.00 | $2.10 | $1.75 | $1.70 | $2.11 |
| 0450 | Conduit, furnish & install, open trench (0630-2-11) | LF | 51,550 | $4.89 | $4.70 | $5.80 | $4.90 | $6.00 | $12.89 |
| 0455 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 6,308 | $22.88 | $22.00 | $34.00 | $22.95 | $35.45 | $32.33 |
| 0460 | Conduit, furnish & install, mount (0630-2-15) | LF | 54 | $47.31 | $45.50 | $42.00 | $47.45 | $42.40 | $74.00 |
| 0465 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 341 | $1,296.51 | $1,550.00 | $1,534.00 | $834.60 | $1,560.00 | $1,555.00 |
| 0470 | Junction box, furnish & install, mounted (0635-3-12) | EACH | 4 | $571.88 | $550.00 | $972.00 | $573.80 | $985.50 | $1,228.00 |
| 0475 | Electrical power service, F&I, overhead meter purchased by contractor from power company (0639-1112) | AS | 3 | $1,611.65 | $1,550.00 | $5,533.00 | $1,617.00 | $5,600.00 | $9,912.00 |
| 0480 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 3 | $1,840.40 | $1,770.00 | $3,382.00 | $1,846.50 | $3,420.00 | $5,112.00 |
| 0485 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 0490 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 3 | $1,440.09 | $1,385.00 | $3,356.00 | $1,445.00 | $3,390.00 | $7,112.00 |
| 0495 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 198,864 | $4.26 | $4.10 | $4.60 | $4.30 | $4.65 | $7.10 |
| 0500 | Lighting conductors, F&I, no.1/0 3/0 (0 to 000) (0715-1-15) | LF | 4,239 | $8.89 | $8.55 | $9.20 | $8.90 | $9.30 | $15.11 |
| 0505 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 3 | $25,168 | $24,205 | $34,000 | $25,253 | $34,400 | $24,476 |
| 0510 | Luminaire, F&I, under deck, wall mount (0715-11125) | EACH | 4 | $2,292.70 | $2,205.00 | $2,336.00 | $2,300.50 | $2,360.00 | $3,255.00 |
| 0515 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 62 | $821.42 | $790.00 | $1,491.00 | $824.20 | $1,510.00 | $1,889.00 |
| 0520 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213) | EACH | 12 | $2,885.37 | $2,775.00 | $2,218.00 | $2,895.00 | $2,240.00 | $2,988.00 |
| 0525 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342) | EACH | 102 | $8,062.54 | $8,300.00 | $11,281 | $7,616.00 | $11,420 | $12,224 |
| 0530 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 142 | $8,374.47 | $8,600.00 | $11,791 | $7,929.00 | $11,935 | $12,554 |
| 0535 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 247 | $701.85 | $675.00 | $1,140.00 | $704.20 | $1,155.00 | $1,269.00 |
| 0540 | Pole cable distribution system, wall mount (0715-500-3) | EACH | 4 | $514.69 | $495.00 | $814.00 | $516.40 | $823.65 | $1,199.00 |
| 0545 | Light pole complete- special design, F&I, double arm mount, aluminum, 45' (0715-512145) | EACH | 3 | $11,421 | $11,530 | $15,850 | $10,986 | $16,000 | $15,447 |
| 0550 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 12.54 | $3,743.19 | $3,599.14 | $3,587.00 | $3,755.00 | $3,700.00 | $4,111.00 |
| 0555 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 3 | $2,183.53 | $2,100.00 | $2,093.00 | $2,191.00 | $2,160.00 | $1,577.00 |
| 0560 | Conduit, furnish & install, open trench (0630-2-11) | LF | 439 | $10.45 | $10.05 | $22.00 | $10.50 | $22.15 | $12.98 |
| 0565 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,132 | $23.91 | $23.00 | $34.60 | $24.00 | $35.45 | $32.51 |
| 0570 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 201 | $47.31 | $45.50 | $71.90 | $47.45 | $73.15 | $79.00 |
| 0575 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,927 | $4.42 | $4.25 | $4.30 | $4.45 | $4.45 | $7.10 |
| 0580 | Fiber optic cable, relocate, underground (0633-1420) | LF | 230 | $3.38 | $3.25 | $3.30 | $3.40 | $3.35 | $7.00 |
| 0585 | Fiber optic connection, install, splice (0633-2-31) | EACH | 6 | $57.19 | $55.00 | $48.00 | $57.40 | $49.90 | $89.00 |
| 0590 | Fiber optic connection, install, termination (0633-2-32) | EACH | 48 | $88.38 | $85.00 | $81.00 | $88.70 | $83.15 | $132.00 |
| 0595 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 1 | $57.19 | $55.00 | $53.50 | $57.40 | $55.45 | $99.00 |
| 0600 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 5 | $98.78 | $95.00 | $92.00 | $99.10 | $94.25 | $141.00 |
| 0605 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 2 | $1,299.72 | $1,250.00 | $1,251.00 | $1,304.00 | $1,290.00 | $1,754.00 |
| 0610 | Fiber optic connection hardware, F&I, connector panel (0633-3-17) | EACH | 2 | $467.90 | $450.00 | $456.00 | $469.50 | $471.15 | $777.00 |
| 0615 | Fiber optic connection hardware, relocate patch preterminated (0633-3-45) | EACH | 1 | $868.21 | $835.00 | $854.00 | $871.20 | $881.30 | $1,211.00 |
| 0620 | Fiber optic connection hardware, adjust/modify splice enclosure (0633-3-51) | EACH | 1 | $868.21 | $835.00 | $854.00 | $871.20 | $881.30 | $1,211.00 |
| 0625 | Fiber optic cable locator (0633-6) | DA | 500 | $218.35 | $210.00 | $76.00 | $219.10 | $77.60 | $211.00 |
| 0630 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 190 | $5.98 | $5.75 | $6.00 | $6.00 | $5.90 | $9.20 |
| 0635 | Multi-conductor cable, furnish & install, composite (0633-8-12) | LF | 768 | $5.98 | $5.75 | $6.00 | $6.00 | $5.90 | $9.20 |
| 0640 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 19 | $1,304.01 | $1,550.00 | $2,098.00 | $834.60 | $2,130.00 | $1,754.00 |
| 0645 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 5 | $2,187.81 | $2,400.00 | $3,514.00 | $1,721.50 | $3,560.00 | $3,354.00 |
| 0650 | Electrical service wire, & install (0639-2-1) | LF | 1,938 | $16.27 | $15.65 | $16.00 | $16.35 | $16.35 | $19.25 |
| 0655 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 2 | $982.59 | $945.00 | $3,617.00 | $985.90 | $3,660.00 | $4,233.00 |
| 0660 | Electrical power service- transformer, F&I, 5-10 kva, phase, copper windings (0639-6121) | EACH | 2 | $3,436.46 | $3,305.00 | $4,622.00 | $3,448.00 | $4,670.00 | $5,124.00 |
| 0665 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $1,440.09 | $1,385.00 | $3,849.00 | $1,445.00 | $3,890.00 | $1,785.00 |
| 0670 | Vehicle detection system- wrong way for exit ramp, 1 or 2 lanes, AC powered (0660-7-21) | EACH | 1 | $61,139 | $58,800 | $59,793 | $61,346 | $60,400 | $51,111 |
| 0675 | Vehicle detection system- wrong way for exit ramp, 3 or more lanes, AC powered (0660-7-22) | EACH | 1 | $65,506 | $63,000 | $59,793 | $65,728 | $60,400 | $51,111 |
| 0680 | ITS cabinet, furnish & install, pole mount with sunshield, 24" W X 46" H X 22" D (0676-2122) | EACH | 2 | $12,171 | $11,705 | $12,222 | $12,212 | $12,300 | $9,211.00 |
| 0685 | ITS cabinet, furnish & install, base mount, 334, 24" W X 66" H X 30" D (0676-2143) | EACH | 1 | $14,177 | $13,635 | $17,661 | $14,225 | $17,800 | $14,920 |
| 0690 | ITS cabinet- remove (0676-2600) | EACH | 1 | $961.79 | $925.00 | $609.00 | $965.10 | $620.80 | $911.00 |
| 0695 | Managed field ethernet switch, relocate (0684-1-4) | EACH | 1 | $311.93 | $300.00 | $300.00 | $313.00 | $304.85 | $455.00 |
| 0700 | Device server, furnish & install (0684-2-1) | EACH | 1 | $1,086.56 | $1,045.00 | $1,068.00 | $1,090.50 | $1,100.00 | $1,544.00 |
| 0705 | Device server, relocate (0684-2-4) | EACH | 1 | $207.95 | $200.00 | $188.00 | $208.70 | $194.00 | $331.00 |
| 0710 | Managed hub ethernet switch, furnish & install (0684-7-1) | EACH | 2 | $7,382.40 | $7,100.00 | $7,172.00 | $7,407.50 | $7,410.00 | $9,999.00 |
| 0715 | Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12) | EACH | 3 | $5,557.60 | $5,345.00 | $6,146.00 | $5,576.50 | $6,210.00 | $7,070.00 |
| 0720 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 3 | $733.04 | $705.00 | $1,177.00 | $735.50 | $1,190.00 | $1,212.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 25, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.