Ohla USA Inc: FDOT bid record
Ohla USA Inc submitted 152 bids on Florida DOT contracts in the data, from 29 SEP 2021 to 28 OCT 2026, and was the low bidder on 37 of them (24%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $487,004,857
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 9 | 3 | 33% |
| 2022 | 29 | 8 | 28% |
| 2023 | 28 | 4 | 14% |
| 2024 | 29 | 8 | 28% |
| 2025 | 34 | 5 | 15% |
| 2026 | 23 | 9 | 39% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 66 | 19 | 29% |
| District 6 | 38 | 7 | 18% |
| District 1 | 31 | 8 | 26% |
| District 5 | 17 | 3 | 18% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 295 | 86 (29%) | $36.77 | $30.82 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 294 | 76 (26%) | $1,481.00 | $1,150.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 250 | 74 (30%) | $4.06 | $5.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 203 | 71 (35%) | $20.00 | $16.54 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 152 | 66 (43%) | $0.10 | $0.13 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 114 | 60 (53%) | $0.05 | $0.07 |
| Portable changeable message sign, temporary | 0102-99 | ED | 146 | 58 (40%) | $10.00 | $12.00 |
| Work zone sign | 0102-60 | ED | 147 | 57 (39%) | $0.21 | $0.25 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 134 | 54 (40%) | $5.20 | $5.90 |
| Type III barricade | 0102-115 | ED | 127 | 53 (42%) | $0.27 | $0.34 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 141 | 49 (35%) | $71.01 | $80.00 |
| Thermoplastic, standard-other surfaces, yellow, solid, 6" | 0711-16201 | GM | 132 | 49 (37%) | $5,090.93 | $5,200.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ranger Construction Industries, Inc. | 74 | 20 of 74 |
| General Asphalt Company, LLC | 74 | 49 of 74 |
| Weekley Asphalt Paving, Inc. | 38 | 22 of 38 |
| Asphalt Group, Inc. | 35 | 6 of 35 |
| Halley Engineering Contractors, Inc. | 34 | 11 of 34 |
| C.W. Roberts Contracting, Inc. | 32 | 12 of 32 |
| Ajax Paving Industries of Florida LLC | 31 | 18 of 31 |
| Florida Engineering & Development Corp | 31 | 18 of 31 |
| Preferred Materials Inc. | 30 | 15 of 30 |
| The Stout Group LLC | 28 | 13 of 28 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T1949 | District 1 | SR 93 (I-75) FROM N OF ALICO RD TO S OF DANIELS PKWY | 1 of 3 | $6,602,020 | Low, 2.0% under the second |
| 28 OCT 2026 | T4765 | District 4 | SR 816 (OAKLAND PARK BLVD) FROM ROCK ISLAND RD TO E OF NW 31 AVE | 2 of 6 | $7,801,449 | +3.0% |
| 30 SEP 2026 | T6398 | District 6 | SR 907 (ALTON RD) FROM MICHIGAN AVE TO S OF 43 ST (ED SULLIVAN DR) | 1 of 4 | $75,760,761 | Low, 13% under the second |
| 30 SEP 2026 | T6593 | District 6 | SR 5 (US 1 / OVERSEAS HWY) FROM W OF VENETIAN BLVD TO EXECUTIVE BAY | 1 of 5 | $2,978,999 | Low, 15% under the second |
| 30 SEP 2026 | T6613 | District 6 | SR 860 (MIAMI GARDENS DR) AT NW 37TH AVE AND FROM NE 6TH AVE TO W | 8 of 9 | $2,158,467 | +28% |
| 26 AUG 2026 | T1940 | District 1 | SR 25 (US 27) FROM SANTA MARIA WAY TO LAKE ISIS AVE | 4 of 4 | $19,068,000 | +10% |
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 1 of 9 | $2,295,224 | Low, 7.0% under the second |
| 29 JUL 2026 | T1939 | District 1 | SR 25 (US 27) FROM S OF WAYMAN RD TO N OF FISH EATING CREEK | 1 of 4 | $18,244,000 | Low, 1.0% under the second |
| 29 JUL 2026 | T5889 | District 5 | SR 9 (I-95) FROM SR 46 TO SB MIMS REST AREA | 5 of 5 | $4,079,090 | +37% |
| 29 JUL 2026 | T5891 | District 5 | SR 9 (I-95) FROM CITRUS BLVD TO ADDISON CANAL | 4 of 4 | $17,277,772 | +16% |
| 29 JUL 2026 | T6595 | District 6 | SR 985 (SW 107 AVE) FROM SR 94 (SW 88 ST) TO N OF SW 56 ST | 6 of 12 | $4,640,446 | +6.0% |
| 10 JUN 2026 | T1930 | District 1 | SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE | 5 of 5 | $5,167,340 | +8.0% |
| 20 MAY 2026 | T1933 | District 1 | SR 25 (US 27) FROM MP 4.478 TO MP 4.856 | 1 of 6 | $5,395,000 | Low, 17% under the second |
| 20 MAY 2026 | T4666 | District 4 | SR 9 (I-95) AT CR 809A (NORTHLAKE BLVD) | 1 of 8 | $54,604,406 | Low, 6.0% under the second |
| 20 MAY 2026 | T5882 | District 5 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | 6 of 10 | $41,403,304 | +30% |
| 29 APR 2026 | T4738 | District 4 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | 1 of 7 | $15,994,701 | Low, 16% under the second |
| 25 MAR 2026 | T1915 | District 1 | SR 78 FROM W OF SANTA BARBARA BLVD TO E OF DEL PRADO BLVD | 3 of 4 | $7,298,000 | +6.0% |
| 25 MAR 2026 | T1919 | District 1 | SR 35 (US 17) FROM S OF PINEGROVE CR TO N OF WASHINGTON LOOP | 2 of 4 | $7,593,939 | +2.0% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 5 of 9 | $6,979,980 | +10% |
| 25 MAR 2026 | T5876 | District 5 | SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST | 4 of 6 | $27,996,699 | +5.0% |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 4 of 7 | $6,680,531 | +6.0% |
| 25 FEB 2026 | T4739 | District 4 | SR 9 (I-95) FROM N OF GLADES TO N OF SR 91 (FLORIDA TPK) | 4 of 5 | $6,426,860 | +25% |
| 25 FEB 2026 | T4751 | District 4 | SR 704 (OKEECHOBEE BLVD) FROM E OF SR 809 (MILITARY TR) TO.. | 1 of 4 | $2,346,009 | Low, 0.0% under the second |
| 03 DEC 2025 | T6615 | District 6 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | 5 of 8 | $7,304,730 | +17% |
| 29 OCT 2025 | T1917 | District 1 | SR 17 FROM S OF CR 17 (KENILWORTH BLVD) TO E OF SR 25 (US 98 | 1 of 4 | $10,727,844 | Low, 3.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.