FDOT letting results, April 29, 2026
12 contracts let by Florida DOT on April 29, 2026, $103,146,091 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 12
- Low bids, total
- $103,146,091
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T7562 | SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)... | District 7 | 7 | Watson Civil Construction, Inc. | $27,734,147 | $32,022,000 | +15% | FDOT |
| T4738 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | District 4 | 7 | Ohla USA Inc | $15,994,701 | $18,517,415 | +16% | FDOT |
| T3995 | SR 8 (I-10) FROM WASHINGTON CO LINE TO E OF SR 276 | District 3 | 2 | Anderson Columbia Co., Inc. | $14,169,437 | $17,101,879 | +21% | FDOT |
| T7611 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | District 7 | 9 | Preferred Materials Inc. | $10,292,804 | $10,736,421 | +4.0% | FDOT |
| T5880 | SR 5A (NOVA RD) FROM FLOMICH ST TO US 1 | District 5 | 3 | Halifax Paving, Inc. | $10,094,241 | $10,393,428 | +3.0% | FDOT |
| T5881 | SR 5 (US 1) FROM SR 400 (BEVILLE RD) TO N OF FAIRVIEW AVE | District 5 | 2 | Masci General Contractors, Inc | $9,229,481 | $9,470,529 | +3.0% | FDOT |
| T2809 | CAMP GRADE RD AND SR 51 OVER STEINHATCHEE RIVER BRIDGE AND.. | District 2 | 3 | Anderson Columbia Co., Inc. | $8,355,509 | $13,183,867 | +58% | FDOT |
| T4723 | SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD) | District 4 | 4 | Weekley Asphalt Paving, Inc. | $2,274,905 | $2,493,437 | +10% | FDOT |
| T3919 | HUB PRESLEY RD OVER POND CREEK, BRIDGE NO 604152 | District 3 | 4 | F & W Construction Company, Inc. | $1,664,580 | $1,811,532 | +9.0% | FDOT |
| T3996 | SR 77 (MAIN ST) FROM S OF 5TH ST TO S OF SR 273 (GLENWOOD... | District 3 | 4 | American Sand & X-Cavation, Inc. DBA American Sand & Asphalt Paving | $1,446,950 | $1,497,746 | +4.0% | FDOT |
| T3997 | SR 10 (US 90 / W TENNESSEE ST) FROM CALLARK ST TO W BREVARD | District 3 | 4 | Ingram Signalization, Inc. | $964,114 | $1,065,506 | +11% | FDOT |
| T7615 | SR 595 (651 / ALT US 19 / N MISSOURI AVE) AT ROSERY RD | District 7 | 4 | Preferred Materials Inc. | $925,222 | $1,013,078 | +9.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.