SR 595 (651 / ALT US 19 / N MISSOURI AVE) AT ROSERY RD. Let by Florida DOT on April 29, 2026, Pinellas, District 7. 4 bids received; low bid $925,222 by Preferred Materials Inc..

Owner
Florida DOT
Letting
29 APR 2026
Pay items
87
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Preferred Materials Inc.$925,222Low
2Burgess Civil, LLC$1,013,078+9.0%
3Blacktip Services Incorporated$1,051,075+14%
4Ajax Paving Industries of Florida LLC$1,160,668+25%
FDOT contract T7615: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Preferred Materials Inc.2. Burgess Civil, LLC3. Blacktip Services Incorporated4. Ajax Paving Industries of Florida LLC
0005Mobilization (0101-1)LS1$120,238$95,264$146,185$151,871
0010Maintenance of traffic (0102-1)DA1$34,547$78,422$45,000$186,193
0015Special detour- temporary pavement (0102-2200)SY1$1,375.52$1,440.00$7,500.00$3,718.89
0020Pedestrian or bicycle special detour (0102-4-1)SY1$9,989.67$3,600.00$7,500.00$4,165.23
0025Traffic control officer (0102-14)HR136$93.30$50.00$85.00$111.59
0030Work zone sign (0102-60)ED2,608$0.27$0.27$0.56$0.24
0035Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED6,823$0.12$0.12$0.12$0.11
0040Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD7,368$0.09$0.09$0.10$0.08
0045Arrow board / advance warning arrow panel (0102-76)ED184$6.12$6.06$7.00$5.58
0050Portable changeable message sign, temporary (0102-99)ED328$12.25$12.13$12.00$11.16
0055Temporary signalization and maintenance, intersection (0102-104)ED145$30.32$20.46$27.50$27.63
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED145$30.32$20.46$27.50$23.38
0065Existing ITS maintenance (0102-112)DA145$48.98$25.00$30.25$44.63
0070Type III barricade (0102-115)ED551$0.35$0.35$0.35$0.32
0075Inlet protection system (0104-18)EACH7$236.26$126.65$50.00$224.69
0080Litter removal (0107-1)ACRE2.64$1,626.93$192.98$100.00$403.64
0085Mowing (0107-2)ACRE0.67$1,626.94$488.61$100.00$1,590.46
0090Clearing & grubbing (0110-1-1)ACRE1$9,910.75$42,148$126,185$33,549
0095Removal of existing concrete (0110-4-10)SY284$52.84$25.10$65.00$79.63
0100Type B stabilization (0160-4)SY127$60.11$36.03$50.00$100.74
0105Optional base, base group 15 (0285-715)SY58$131.36$179.32$85.00$406.34
0110Milling existing asphalt pavement, 2" avg depth (0327-70-5)SY292$20.96$49.25$38.20$37.13
0115Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY3,424$15.11$18.58$10.14$9.90
0120Superpave asphaltic conc, traffic C (0334-1-13)TN30.80$306.03$508.45$538.91$933.83
0125Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN317.60$213.37$375.19$285.50$307.26
0130Concrete pavement for roundabout apron, 12" depth (0350-30-13)SY76$284.10$281.25$192.00$310.08
0135Concrete curb & gutter, type E (0520-1-7)LF141$50.29$74.58$30.00$58.77
0140Concrete curb & gutter, type F (0520-1-10)LF106$59.79$68.27$30.00$71.85
0145Concrete curb, type D (0520-2-4)LF116$40.90$39.52$30.00$44.26
0150Concrete traffic separator, special- variable width (0520-70)SY118$131.96$194.28$75.00$143.21
0155Concrete sidewalk and driveways, 6" thick (0522-2)SY195$131.26$149.12$75.00$127.32
0160Detectable warnings (0527-2)SF123$36.00$25.00$35.00$22.32
0165Performance turf, sod (0570-1-2)SY42$14.62$31.57$12.00$51.41
0170Raised pavement marker, type B (0706-1-3)EACH48$5.83$5.25$6.60$5.80
0175Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.15$2,618.37$2,780.07$1,650.00$2,611.07
0180Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF278$1.98$2.10$2.25$1.97
0185Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF280$2.33$2.78$2.25$2.32
0190Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.06$566.51$800.16$770.00$580.24
0195Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.04$749.71$810.29$770.00$754.31
0200Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.10$2,644.26$2,807.52$1,650.00$2,611.07
0205Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000
0210Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH11$758.07$794.36$675.00$648.26
0215Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,915.65$3,259.63$2,640.00$2,550.53
0220Single column ground sign assembly, remove (0700-1600)EACH3$93.30$119.09$45.00$42.51
0225Sign panel, remove, UP to 12 SF (0700-3601)EACH2$58.31$59.55$45.00$42.51
0230Raised pavement marker, type B (0706-1-3)EACH54$5.83$5.25$6.60$5.80
0235Painted pavement markings, standard, yellow, island nose (0710-11290)SF3$5.83$5.25$11.00$5.80
0240Painted pavement markings, surface (0710-90)LS1$7,739.31$1,995.45$5,900.00$7,700.93
0245Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF480$3.52$8.40$6.60$3.50
0250Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF133$7.04$16.80$11.00$7.01
0255Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.04$2,449.14$4,320.86$6,050.00$2,437.00
0260Thermoplastic, standard, message or symbol (0711-11160)EACH12$79.31$315.07$250.00$78.91
0265Thermoplastic, standard, arrow (0711-11170)EACH1$60.64$126.03$110.00$60.34
0270Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF11$4.80$12.60$11.00$4.78
0275Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF516$18.01$15.75$20.00$17.92
0280Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.18$9,431.71$7,957.83$8,250.00$9,381.30
0285Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.13$2,359.03$2,852.91$2,750.00$2,345.32
0290Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.13$8,668.63$8,129.31$8,250.00$8,622.35
0295Itsfm subsurface documentation- project length (0611-1-1)MI0.19$4,900.74$4,525.13$5,225.00$4,442.17
0300Itsfm location documentation- intersection (0611-2-1)EACH1$3,136.66$3,057.15$4,125.00$2,858.19
0305Conduit, furnish & install, open trench (0630-2-11)LF163$23.03$32.82$7.50$20.99
0310Conduit, furnish & install, directional bore (0630-2-12)LF720$32.07$43.69$52.25$29.23
0315Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$12,576$17,202$13,298$11,459
0320Fiber optic connection, install, splice (0633-2-31)EACH146$57.73$56.37$33.69$52.60
0325Fiber optic connection, install, termination (0633-2-32)EACH12$96.22$93.87$36.44$87.67
0330Fiber optic connection hardware, F&I, splice (0633-3-11)EACH1$1,706.24$1,663.04$1,320.00$1,554.76
0335Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH12$64.15$62.55$59.81$58.45
0340Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13)EACH1$4,599.15$4,481.52$47.44$4,190.84
0345Fiber optic cable locator (0633-6)DA145$134.12$156.31$247.50$122.21
0350Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH2$1,943.26$1,321.87$1,511.13$1,770.74
0355Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$3,470.90$2,164.15$2,360.88$3,162.75
0360Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$6,992.23$5,139.79$4,167.63$6,371.47
0365Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH11$2,302.25$1,533.16$1,875.50$2,097.85
0370Electrical power service, F&I, underground, meter furnished by power company (0639-1121)AS1$5,598.05$7,281.88$3,025.00$5,101.06
0375Electrical service wire, & install (0639-2-1)LF50$17.49$8.95$8.66$15.94
0380Electrical service disconnect, F&I, pole mount (0639-3-11)EACH2$2,915.65$3,396.62$2,131.25$2,656.80
0385Prestressed concrete pole, type P-II service pole (0641-2-12)EACH2$3,412.48$2,980.32$1,237.50$3,109.52
0390Aluminum signals pole, (0646-1-11)EACH7$3,396.68$2,421.04$2,326.50$3,095.12
0395Aluminum signals pole, remove (0646-1-60)EACH2$583.13$610.96$1,100.00$531.36
0400Steel mast arm assembly, and install, double arm 40'-40' (0649-21-5)EACH1$100,211$81,156$97,419$91,314
0405Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS7$1,344.06$833.87$882.75$1,224.73
0410Midblock crosswalk: hybrid beacon assembly, & install complete assembly (0654-3-10)AS6$2,357.71$2,175.55$2,585.00$2,148.40
0415Loop assembly- F&I, type A (0660-2101)AS6$1,935.99$2,268.25$3,025.00$1,764.12
0420Pedestrian detector, furnish & install, standard (0665-1-11)EACH7$446.07$361.63$398.75$406.47
0425Traffic controller assembly, F&I, NEMA W/standard lock (0670-5160)AS1$53,297$55,506$49,088$48,565
0430Managed field ethernet switch, furnish & install (0684-1-1)EACH1$3,462.05$2,652.90$2,406.25$3,154.69
0435Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH4$1,139.50$1,049.10$1,434.13$1,038.33
FDOT contract T7615: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy