Burgess Civil, LLC: FDOT bid record

Burgess Civil, LLC submitted 18 bids on Florida DOT contracts in the data, from 26 JAN 2022 to 30 SEP 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +13% above the low bid.

Owner
Florida DOT
Low bid volume
$22,705,114
Latest bid
30 SEP 2026
Data through
28 OCT 2026
18Bids
5Low bids
28Win rate, percent
+13%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
20223267%
202311100%
20246117%
20252150%
2026600%
Burgess Civil, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 717424%
District 111100%
Burgess Civil, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised pavement marker, type B0706-1-3EACH2516 (64%)$5.00$5.00
Portable changeable message sign, temporary0102-99ED1711 (65%)$10.00$12.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF1711 (65%)$7.00$6.09
Traffic control officer0102-14HR1411 (79%)$65.00$80.00
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH2510 (40%)$1,500.00$1,150.00
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM1610 (63%)$5,432.88$5,220.00
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM1610 (63%)$5,249.34$5,200.00
Thermoplastic, preformed, white, solid, 24" for crosswalk0711-14125LF1610 (63%)$16.02$17.00
Work zone sign0102-60ED189 (50%)$0.24$0.25
Painted pavement markings, standard, white, solid for stop line or crosswalk, 24"0710-11125LF149 (64%)$2.00$2.00
Conduit, furnish & install, directional bore0630-2-12LF268 (31%)$42.84$30.82
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED188 (44%)$0.11$0.13
Burgess Civil, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 SEP 2026T7622District 7SR 699 (GULF BLVD) FROM SR 682 (PINELLAS BAYWAY) TO SR 688 (WALSINGHAM4 of 9$777,045+31%
20 MAY 2026T7595District 7SR 580 (W BUSCH BLVD) AND GUNN HWY FROM N DALE MABRY HWY TO6 of 8$14,371,815+13%
20 MAY 2026T7609District 7SR 6852 of 4$455,814+10%
29 APR 2026T7611District 7SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST7 of 9$12,436,865+21%
29 APR 2026T7615District 7SR 595 (651 / ALT US 19 / N MISSOURI AVE) AT ROSERY RD2 of 4$1,013,078+9.0%
28 JAN 2026T7579District 7SR 600 (US 92 / HILLSBOROUGH AVE) FROM W OF N 39TH ST TO...4 of 6$1,938,768+18%
24 SEP 2025T7566District 7SR 595 (ALT US 19 / BAYSHORE DR) FROM WILSON ST TO CURLEW ST1 of 6$1,275,290Low, 6.0% under the second
24 SEP 2025T7592District 7SR 39 (US 301 / GALL BLVD) FROM S OF WIRE RD TO N OF WIRE RD2 of 6$1,875,123+8.0%
13 NOV 2024T7541District 7SR 586 (CURLEW RD) FROM E OF LANDMARK DR TO SR 584 (TAMPA RD1 of 4$10,810,202Low, 17% under the second
30 OCT 2024T7524District 7SR 54 FROM W OF VIRGINIA CITY DR TO OLD MILL POND DR4 of 5$6,079,098+12%
22 MAY 2024T7539District 7SR 93 (I-275) FROM SR 93 (I-275 / FRONTAGE RD EXIT RAMP AT4 of 5$1,344,496+21%
22 MAY 2024T7549District 7OLA AVE (N RIVER BLVD / N HIGHLAND AVE / DARTMOUTH AVE) FROM3 of 5$5,602,765+11%
15 MAY 2024T7538District 7SR 60 (GULF TO BAY BLVD) AT OLD COACHMAN RD3 of 4$745,040+37%
28 FEB 2024T7521District 7SR 60 (E ADAMO DR) FROM E OF US 41 TO E OF US 301 AND AT...5 of 6$15,283,159+18%
14 JUN 2023T7516District 7SR 41 (US 301) (GALL BLVD)1 of 5$6,730,280Low, 11% under the second
31 AUG 2022T7481District 7SR 39 (ALEXANDER ST)3 of 4$3,750,006+13%
27 JUL 2022T7484District 7SR 687 (US 92/4TH ST N AND S)1 of 3$2,689,020Low, 44% under the second
26 JAN 2022T1819District 1SR 600 (US 92)1 of 2$1,200,321Low, 23% under the second
Burgess Civil, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy