Nelson, David, Construction Co.: FDOT bid record
Nelson, David, Construction Co. submitted 16 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 20 MAY 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $0
- Latest bid
- 20 MAY 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 4 | 0 | 0% |
| 2021 | 1 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Litter removal | 0107-1 | ACRE | 14 | 7 (50%) | $30.00 | $52.98 |
| Concrete curb & gutter, type F | 0520-1-10 | LF | 15 | 6 (40%) | $35.00 | $42.32 |
| Removal of existing concrete | 0110-4-10 | SY | 15 | 5 (33%) | $18.00 | $33.96 |
| Detectable warnings | 0527-2 | SF | 15 | 5 (33%) | $30.00 | $35.00 |
| Single post sign, remove | 0700-1-60 | AS | 9 | 5 (56%) | $30.00 | $31.94 |
| Pipe culvert,optional material,round, 18"S/CD | 0430-175118 | LF | 13 | 4 (31%) | $115.00 | $154.00 |
| Concrete curb & gutter, type E | 0520-1-7 | LF | 13 | 4 (31%) | $40.00 | $43.11 |
| Single post sign, relocate | 0700-1-50 | AS | 9 | 4 (44%) | $200.00 | $250.00 |
| Mailbox, F&I single | 0110-7-1 | EACH | 8 | 4 (50%) | $250.00 | $250.00 |
| Pipe culvert,optional material,other-elip/arch, | 0430-175218 | LF | 7 | 4 (57%) | $90.00 | $175.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 24 | 3 (13%) | $38.00 | $30.82 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 13 | 3 (23%) | $1,600.00 | $1,350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Watson Civil Construction, Inc. | 11 | 8 of 11 |
| Cone & Graham, Inc. | 9 | 7 of 9 |
| Russell Engineering, Inc. | 8 | 8 of 8 |
| Ajax Paving Industries of Florida LLC | 8 | 5 of 8 |
| Crisdel Group, Inc | 7 | 2 of 7 |
| PCS Civil, Inc. | 4 | 4 of 4 |
| D.A.B. Constructors, Inc. | 3 | 3 of 3 |
| Pepper Contracting Services, Inc. | 3 | 3 of 3 |
| Sema Construction, Inc. | 3 | 1 of 3 |
| Kamminga & Roodvoets, Inc. | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | T7607 | District 7 | SR 93 (I-75) AT CR 54 | 6 of 6 | $2,184,072 | +30% |
| 20 MAY 2026 | T7610 | District 7 | SR 590 (DREW ST) FROM N OSCEOLA AVE TO US 19 | 6 of 6 | $23,382,512 | +13% |
| 29 APR 2026 | T7562 | District 7 | SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)... | 4 of 7 | $32,885,125 | +19% |
| 29 APR 2026 | T7611 | District 7 | SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST | 9 of 9 | $14,217,909 | +38% |
| 11 JUN 2025 | T7542 | District 7 | SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP | 7 of 9 | $5,806,043 | +29% |
| 28 MAY 2025 | T7533 | District 7 | SR 93 (US 19/I-275) FROM N OF SKYWAY FISHING PIER TO S OF... | 2 of 3 | $12,321,041 | +58% |
| 13 NOV 2024 | T7541 | District 7 | SR 586 (CURLEW RD) FROM E OF LANDMARK DR TO SR 584 (TAMPA RD | 2 of 4 | $12,607,901 | +17% |
| 27 JUL 2022 | T7484 | District 7 | SR 687 (US 92/4TH ST N AND S) | 2 of 3 | $3,865,495 | +44% |
| 25 MAY 2022 | T7464 | District 7 | N 62ND ST | 2 of 2 | $6,034,039 | +1.0% |
| 27 JAN 2021 | T7468 | District 7 | SR 45/US 41/BROAD ST | 4 of 5 | $9,553,925 | +4.0% |
| 18 NOV 2020 | T7438 | District 7 | SR 45 (US 41) | 6 of 9 | $20,445,180 | +22% |
| 18 NOV 2020 | T7449 | District 7 | MORRIS BRIDGE - BIKE PATH/TRAIL | 11 of 12 | $5,756,247 | +29% |
| 29 APR 2020 | T7444 | District 7 | SR 93A (I-75) | 9 of 10 | $11,821,411 | +18% |
| 26 FEB 2020 | T7446 | District 7 | SR 50 | 4 of 6 | $5,565,679 | +23% |
| 12 JUN 2019 | T7433 | District 7 | SR 52 | 4 of 7 | $54,815,146 | +10% |
| 28 MAR 2018 | T7414 | District 7 | STARKEY GAP (TRI-CO TRL) (C2C TRL) | 9 of 9 | $4,650,327 | +78% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.