Nelson, David, Construction Co.: FDOT bid record

Nelson, David, Construction Co. submitted 16 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 20 MAY 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +22% above the low bid.

Owner
Florida DOT
Low bid volume
$0
Latest bid
20 MAY 2026
Data through
28 OCT 2026
16Bids
0Low bids
0Win rate, percent
+22%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
2018100%
2019100%
2020400%
2021100%
2022200%
2024100%
2025200%
2026400%
Nelson, David, Construction Co., FDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Litter removal0107-1ACRE147 (50%)$30.00$52.98
Concrete curb & gutter, type F0520-1-10LF156 (40%)$35.00$42.32
Removal of existing concrete0110-4-10SY155 (33%)$18.00$33.96
Detectable warnings0527-2SF155 (33%)$30.00$35.00
Single post sign, remove0700-1-60AS95 (56%)$30.00$31.94
Pipe culvert,optional material,round, 18"S/CD0430-175118LF134 (31%)$115.00$154.00
Concrete curb & gutter, type E0520-1-7LF134 (31%)$40.00$43.11
Single post sign, relocate0700-1-50AS94 (44%)$200.00$250.00
Mailbox, F&I single0110-7-1EACH84 (50%)$250.00$250.00
Pipe culvert,optional material,other-elip/arch,0430-175218LF74 (57%)$90.00$175.00
Conduit, furnish & install, directional bore0630-2-12LF243 (13%)$38.00$30.82
Painted pavement markings, standard, white, solid, 6"0710-11101GM133 (23%)$1,600.00$1,350.00
Nelson, David, Construction Co., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Watson Civil Construction, Inc.118 of 11
Cone & Graham, Inc.97 of 9
Russell Engineering, Inc.88 of 8
Ajax Paving Industries of Florida LLC85 of 8
Crisdel Group, Inc72 of 7
PCS Civil, Inc.44 of 4
D.A.B. Constructors, Inc.33 of 3
Pepper Contracting Services, Inc.33 of 3
Sema Construction, Inc.31 of 3
Kamminga & Roodvoets, Inc.33 of 3
Nelson, David, Construction Co., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
20 MAY 2026T7607District 7SR 93 (I-75) AT CR 546 of 6$2,184,072+30%
20 MAY 2026T7610District 7SR 590 (DREW ST) FROM N OSCEOLA AVE TO US 196 of 6$23,382,512+13%
29 APR 2026T7562District 7SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)...4 of 7$32,885,125+19%
29 APR 2026T7611District 7SR 582 (FOWLER AVE) FROM BRUCE B DOWNS BLVD TO 50TH ST9 of 9$14,217,909+38%
11 JUN 2025T7542District 7SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP7 of 9$5,806,043+29%
28 MAY 2025T7533District 7SR 93 (US 19/I-275) FROM N OF SKYWAY FISHING PIER TO S OF...2 of 3$12,321,041+58%
13 NOV 2024T7541District 7SR 586 (CURLEW RD) FROM E OF LANDMARK DR TO SR 584 (TAMPA RD2 of 4$12,607,901+17%
27 JUL 2022T7484District 7SR 687 (US 92/4TH ST N AND S)2 of 3$3,865,495+44%
25 MAY 2022T7464District 7N 62ND ST2 of 2$6,034,039+1.0%
27 JAN 2021T7468District 7SR 45/US 41/BROAD ST4 of 5$9,553,925+4.0%
18 NOV 2020T7438District 7SR 45 (US 41)6 of 9$20,445,180+22%
18 NOV 2020T7449District 7MORRIS BRIDGE - BIKE PATH/TRAIL11 of 12$5,756,247+29%
29 APR 2020T7444District 7SR 93A (I-75)9 of 10$11,821,411+18%
26 FEB 2020T7446District 7SR 504 of 6$5,565,679+23%
12 JUN 2019T7433District 7SR 524 of 7$54,815,146+10%
28 MAR 2018T7414District 7STARKEY GAP (TRI-CO TRL) (C2C TRL)9 of 9$4,650,327+78%
Nelson, David, Construction Co.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy