Crisdel Group, Inc: FDOT bid record

Crisdel Group, Inc submitted 13 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 29 JUL 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +20% above the low bid.

Owner
Florida DOT
Low bid volume
$0
Latest bid
29 JUL 2026
Data through
28 OCT 2026
13Bids
0Low bids
0Win rate, percent
+20%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
2018100%
2020400%
2021300%
2022100%
2024100%
2025100%
2026200%
Crisdel Group, Inc, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 71000%
District 1200%
District 5100%
Crisdel Group, Inc, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removal of existing concrete0110-4-10SY137 (54%)$13.08$33.96
Thermoplastic, standard, solid, 12" for crosswalk and roundabout0711-11123LF124 (33%)$3.04$3.25
Thermoplastic, standard, solid, 18" for diagonals and chevrons0711-11124LF114 (36%)$3.98$4.58
Channelizing device- pedestrian LCD (longitudinal channelizing device)0102-74-8FD94 (44%)$0.05$0.07
Painted pavement markings, standard, yellow, island nose0710-11290SF94 (44%)$2.16$3.25
Concrete curb & gutter, type F0520-1-10LF133 (23%)$27.97$42.32
Thermoplastic, standard, arrow0711-11170EACH123 (25%)$59.20$80.00
Thermoplastic, standard, solid, 24" for stop line and crosswalk0711-11125LF103 (30%)$5.33$6.09
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM103 (30%)$4,627.84$5,200.00
Temporary signalization and maintenance, intersection0102-104ED103 (30%)$20.24$15.00
Painted pavement markings, standard, white, solid for stop line or crosswalk, 24"0710-11125LF103 (30%)$1.08$2.00
Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6"0711-11241GM103 (30%)$1,500.00$2,600.00
Crisdel Group, Inc, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Crisdel Group, Inc, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 JUL 2026T5883District 5SR 400 (I-4) AND SR 600 (US 17/92) FROM MP 13.83 TO MP 13.856 AND MP 7.5446 of 9$22,779,931+15%
29 APR 2026T7562District 7SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)...6 of 7$41,293,548+49%
11 JUN 2025T7542District 7SR 687 (4TH ST N) FROM SR 694 (GANDY BLVD) TO BIG ISLAND GAP9 of 9$6,739,018+50%
28 FEB 2024T7521District 7SR 60 (E ADAMO DR) FROM E OF US 41 TO E OF US 301 AND AT...2 of 6$13,776,374+6.0%
23 FEB 2022T1801District 1SR 45 (US 41)4 of 5$10,697,697+8.0%
26 MAY 2021T7475District 7SR 60 (KENNEDY BLVD)6 of 8$7,143,350+50%
28 APR 2021T7473District 7SR 700 (US 98)2 of 5$3,545,489+3.0%
31 MAR 2021T1783District 1SR 93 (I-75)7 of 7$63,314,489+20%
18 NOV 2020T7438District 7SR 45 (US 41)9 of 9$23,205,472+39%
18 NOV 2020T7449District 7MORRIS BRIDGE - BIKE PATH/TRAIL4 of 12$4,684,514+5.0%
29 APR 2020T7444District 7SR 93A (I-75)10 of 10$11,887,980+18%
26 FEB 2020T7446District 7SR 505 of 6$6,281,744+39%
28 MAR 2018T7414District 7STARKEY GAP (TRI-CO TRL) (C2C TRL)7 of 9$3,631,614+39%
Crisdel Group, Inc: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy