FDOT letting results, February 28, 2024
22 contracts let by Florida DOT on February 28, 2024, $161,246,320 in low bids, a median of 3.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 22
- Low bids, total
- $161,246,320
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T2976 | SR 8 (I-10) FROM CHAFFEE ROAD TO SR 9A (I-295) | District 2 | 3 | Anderson Columbia Co., Inc. | $25,893,810 | $25,998,504 | 0.0% | FDOT |
| T7519 | SR 400 (I-4) FROM PARK RD WB EXIT RAMP INTERSECTION TO E OF | District 7 | 5 | Watson Civil Construction, Inc. | $18,816,113 | $20,412,359 | +8.0% | FDOT |
| T7521 | SR 60 (E ADAMO DR) FROM E OF US 41 TO E OF US 301 AND AT... | District 7 | 6 | Watson Civil Construction, Inc. | $12,982,931 | $13,776,374 | +6.0% | FDOT |
| T6557 | SR 5 (US 1) (S DIXIE HWY) FORM S OF SW 264 ST TO S OF SW... | District 6 | 5 | Bacallao Construction & Engineering Development, LLC D/B/A B | $12,437,113 | $12,469,442 | 0.0% | FDOT |
| T2969 | SR 49 (US 129) FROM HILLIARD AVE TO SUWANNEE CO LINE | District 2 | 1 | Anderson Columbia Co., Inc. | $10,923,210 | FDOT | ||
| T2968 | SR 222 (NW 39TH AVE) FROM NW 95TH BLVD TO NW 40TH TERRACE | District 2 | 2 | Preferred Materials Inc. | $10,539,106 | $13,119,743 | +24% | FDOT |
| T2984 | SR 8 (I-10) AND SR 10 (US 90) OVER SUWANEE RIVER RELIEF AND | District 2 | 4 | Anderson Columbia Co., Inc. | $9,558,432 | $10,092,366 | +6.0% | FDOT |
| T4669 | SR 848 (STIRLING RD) FROM W OF N 58TH AVE TO SR 5 (US 1) | District 4 | 4 | General Asphalt Company, LLC | $9,269,118 | $9,535,954 | +3.0% | FDOT |
| T5822 | SR 44 (E NEW YORK AVE) AT KEPLER RD, FROM KEPLER RD TO... | District 5 | 4 | P & S Paving, Inc. | $8,471,031 | $10,045,517 | +19% | FDOT |
| T1882 | SR 93 (I-75) FROM N OF GOLDEN GATE PKWY TO LEE CO LINE | District 1 | 4 | General Asphalt Company, LLC | $8,151,815 | $8,980,154 | +10% | FDOT |
| T2970 | SR 202 (JT BUTLER BLVD) FROM INTRACOASTAL WATERWAY BRIDGE TO | District 2 | 2 | Preferred Materials Inc. | $6,497,196 | $7,361,767 | +13% | FDOT |
| T4665 | SR 834 (SAMPLE RD) FROM SR 845 (POWERLINE RD) TO MILITARY... | District 4 | 5 | General Asphalt Company, LLC | $5,489,802 | $5,916,577 | +8.0% | FDOT |
| T2971 | SR 45 (US 41) FROM LEVY CO LINE TO SR 24 | District 2 | 3 | Anderson Columbia Co., Inc. | $3,853,063 | $4,028,053 | +5.0% | FDOT |
| T2950 | SR 100 FROM US 17 TO FLAGER CO LINE | District 2 | 2 | P & S Paving, Inc. | $3,345,256 | $3,757,773 | +12% | FDOT |
| T3851 | INTERSTATE CIR OVER EIGHTMILE CREEK, BRIDGE NO 484071 | District 3 | 2 | Murphree Bridge Corporation | $3,185,384 | $3,270,242 | +3.0% | FDOT |
| T1852 | SR 683 (SR 301) FROM 12TH ST TO DR MLK JR WAY | District 1 | 2 | Ajax Paving Industries of Florida LLC | $3,084,175 | $4,073,473 | +32% | FDOT |
| T1873 | SR 865 FROM LINDA LOMA DR TO KELLY RD | District 1 | 3 | Ajax Paving Industries of Florida LLC | $2,902,791 | $3,997,997 | +38% | FDOT |
| T1872 | SR 78 FROM EVALENA LN TO NEW POST RD | District 1 | 3 | Ajax Paving Industries of Florida LLC | $1,993,102 | $2,612,540 | +31% | FDOT |
| T1877 | SR 45 (US 41) SB RAMP FROM 45TH ST TO E OF SR 55 | District 1 | 3 | Ajax Paving Industries of Florida LLC | $1,088,769 | $1,092,759 | 0.0% | FDOT |
| T1868 | SR 64 FROM E OF MANATEE RIVER TO BILL PARRISH RD | District 1 | 5 | Leon America Construction | $1,036,497 | $1,243,709 | +20% | FDOT |
| T4680 | SR 882 (FOREST HILL BLVD), SR 5 (US 1), SR 805 (DIXIE HWY).. | District 4 | 4 | Carr Construction, LLC | $977,856 | $1,326,270 | +36% | FDOT |
| T6466 | SR 916 (NE 135 ST) AT NE 12TH AVE | District 6 | 5 | Horsepower Electric, Inc. | $749,749 | $765,000 | +2.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.