Carr Construction, LLC: FDOT bid record

Carr Construction, LLC submitted 39 bids on Florida DOT contracts in the data, from 25 APR 2018 to 26 AUG 2026, and was the low bidder on 18 of them (46%). When it was not low, its total sat a median +12% above the low bid.

Owner
Florida DOT
Low bid volume
$44,119,438
Latest bid
26 AUG 2026
Data through
28 OCT 2026
39Bids
18Low bids
46Win rate, percent
+12%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20185360%
20193133%
202033100%
202122100%
20227457%
20232150%
202422100%
20251119%
20264125%
Carr Construction, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 4231043%
District 511655%
District 14250%
District 2100%
Carr Construction, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH4415 (34%)$1,455.50$1,150.00
Conduit, furnish & install, open trench0630-2-11LF4215 (36%)$18.25$16.54
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED3715 (41%)$0.15$0.13
Work zone sign0102-60ED3714 (38%)$0.29$0.25
Portable changeable message sign, temporary0102-99ED3612 (33%)$12.25$12.00
Prestressed concrete pole, type P-II service pole0641-2-12EACH2712 (44%)$2,178.00$2,200.00
Temporary traffic detection and maintenance, intersection0102-107-1ED2012 (60%)$12.38$11.10
Electrical service wire, & install0639-2-1LF3011 (37%)$9.55$8.33
Detectable warnings0527-2SF2211 (50%)$37.00$35.00
Type III barricade0102-115ED2111 (52%)$0.30$0.34
Arrow board / advance warning arrow panel0102-76ED3310 (30%)$6.00$5.90
Raised pavement marker, type B0706-1-3EACH2610 (38%)$5.20$5.00
Carr Construction, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Carr Construction, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
26 AUG 2026T4764District 4SR 512 FROM E OF I-95 TO W OF 106TH AVE5 of 9$2,815,661+23%
26 AUG 2026T4773District 4SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 12 of 13$2,688,590+3.0%
25 MAR 2026T4735District 4SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS..4 of 6$3,887,952+12%
28 JAN 2026T4750District 4SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD1 of 11$1,856,551Low, 1.0% under the second
29 OCT 2025T4727District 4SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 (6 of 13$6,323,013+29%
27 AUG 2025T4702District 4SR 7 (US 441) AT LAKE WORTH RD5 of 8$3,578,204+5.0%
30 JUL 2025T4716District 4SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD5 of 8$7,234,716+22%
30 JUL 2025T4720District 4I-95 RAMP AT SR 704 (OKEECHOBEE BLVD), SR 786 (PGA BLVD) AND2 of 3$1,343,070+10%
30 JUL 2025T4733District 4SR 9 (I-95) NB EXIT RAMP TO WB SR 68 (ORANGE AVE)2 of 4$870,928+4.0%
30 JUL 2025T5871District 5SR 519 (FISKE BLVD) AT LEVITT PKWY / LAKEMOOR BLVD AND FROM1 of 2$3,664,708Low, 26% under the second
11 JUN 2025T1914District 1SR 35 (US 17) FROM REA RD TO SR 622 of 6$2,103,069+1.0%
11 JUN 2025T5856District 5HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG...2 of 5$624,557+14%
28 MAY 2025T1900District 1SR 45 (US 41) FROM 63RD AVE TO 53RD AVE2 of 4$5,050,195+8.0%
28 MAY 2025T4707District 4SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME..5 of 6$3,601,698+14%
30 APR 2025T5850District 5SR 5 (US 1) FROM N OF CENTURY OAKS CR TO N OF MYERS DR3 of 7$7,675,773+8.0%
04 DEC 2024T5842District 5SR 600/15 (US 17-92 / S VOLUSIA AVE) AT ENTERPRISE RD1 of 3$1,964,413Low, 8.0% under the second
28 FEB 2024T4680District 4SR 882 (FOREST HILL BLVD), SR 5 (US 1), SR 805 (DIXIE HWY)..1 of 4$977,856Low, 36% under the second
26 APR 2023T5759District 5SR A1A1 of 3$3,865,830Low, 5.0% under the second
25 JAN 2023T5780District 5SR 509 (NASA BLVD)2 of 6$1,937,827+17%
07 DEC 2022T4629District 4SR 9 (I-95)1 of 4$1,050,673Low, 4.0% under the second
26 OCT 2022T4625District 4SR 5 US 1) AND SR 7945 of 7$4,406,906+24%
05 OCT 2022T5764District 5SR 5181 of 2$2,470,270Low, 41% under the second
15 JUN 2022T2873District 2SR 104 (DUNN AVE)3 of 4$369,572+54%
25 MAY 2022T5746District 5SR 3 (N COURTENAY PKWY)1 of 2$1,480,640Low, 22% under the second
30 MAR 2022T5726District 5SR A1A1 of 6$1,057,650Low, 2.0% under the second
Carr Construction, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy