Carr Construction, LLC: FDOT bid record
Carr Construction, LLC submitted 39 bids on Florida DOT contracts in the data, from 25 APR 2018 to 26 AUG 2026, and was the low bidder on 18 of them (46%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $44,119,438
- Latest bid
- 26 AUG 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 3 | 60% |
| 2019 | 3 | 1 | 33% |
| 2020 | 3 | 3 | 100% |
| 2021 | 2 | 2 | 100% |
| 2022 | 7 | 4 | 57% |
| 2023 | 2 | 1 | 50% |
| 2024 | 2 | 2 | 100% |
| 2025 | 11 | 1 | 9% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 23 | 10 | 43% |
| District 5 | 11 | 6 | 55% |
| District 1 | 4 | 2 | 50% |
| District 2 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 44 | 15 (34%) | $1,455.50 | $1,150.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 42 | 15 (36%) | $18.25 | $16.54 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 37 | 15 (41%) | $0.15 | $0.13 |
| Work zone sign | 0102-60 | ED | 37 | 14 (38%) | $0.29 | $0.25 |
| Portable changeable message sign, temporary | 0102-99 | ED | 36 | 12 (33%) | $12.25 | $12.00 |
| Prestressed concrete pole, type P-II service pole | 0641-2-12 | EACH | 27 | 12 (44%) | $2,178.00 | $2,200.00 |
| Temporary traffic detection and maintenance, intersection | 0102-107-1 | ED | 20 | 12 (60%) | $12.38 | $11.10 |
| Electrical service wire, & install | 0639-2-1 | LF | 30 | 11 (37%) | $9.55 | $8.33 |
| Detectable warnings | 0527-2 | SF | 22 | 11 (50%) | $37.00 | $35.00 |
| Type III barricade | 0102-115 | ED | 21 | 11 (52%) | $0.30 | $0.34 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 33 | 10 (30%) | $6.00 | $5.90 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 26 | 10 (38%) | $5.20 | $5.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Chinchor Electric Inc. | 12 | 3 of 12 |
| Signal Technology and Installation Corp. | 11 | 3 of 11 |
| American Lighting and Signalization, LLC. | 10 | 0 of 10 |
| Traffic Control Devices, Inc. | 10 | 3 of 10 |
| Aum Construction Inc. | 9 | 3 of 9 |
| Ranger Construction Industries, Inc. | 9 | 4 of 9 |
| Sice Inc | 8 | 2 of 8 |
| Traffic Management Solutions, LLC | 8 | 2 of 8 |
| Halley Engineering Contractors, Inc. | 8 | 1 of 8 |
| Powercore, Inc. | 7 | 0 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 5 of 9 | $2,815,661 | +23% |
| 26 AUG 2026 | T4773 | District 4 | SR 713 TURNPIKE FEEDER RD / KINGS HWY) FROM N OF INDRIO RD TO US 1 | 2 of 13 | $2,688,590 | +3.0% |
| 25 MAR 2026 | T4735 | District 4 | SR 5, SR 805, SR 9, SR A1A AND SR 786 AT VARIOUS LOCATIONS.. | 4 of 6 | $3,887,952 | +12% |
| 28 JAN 2026 | T4750 | District 4 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | 1 of 11 | $1,856,551 | Low, 1.0% under the second |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 6 of 13 | $6,323,013 | +29% |
| 27 AUG 2025 | T4702 | District 4 | SR 7 (US 441) AT LAKE WORTH RD | 5 of 8 | $3,578,204 | +5.0% |
| 30 JUL 2025 | T4716 | District 4 | SR 811 (ALT A1A) FROM S OF RCA BLVD TO N OF DONALD ROSS RD | 5 of 8 | $7,234,716 | +22% |
| 30 JUL 2025 | T4720 | District 4 | I-95 RAMP AT SR 704 (OKEECHOBEE BLVD), SR 786 (PGA BLVD) AND | 2 of 3 | $1,343,070 | +10% |
| 30 JUL 2025 | T4733 | District 4 | SR 9 (I-95) NB EXIT RAMP TO WB SR 68 (ORANGE AVE) | 2 of 4 | $870,928 | +4.0% |
| 30 JUL 2025 | T5871 | District 5 | SR 519 (FISKE BLVD) AT LEVITT PKWY / LAKEMOOR BLVD AND FROM | 1 of 2 | $3,664,708 | Low, 26% under the second |
| 11 JUN 2025 | T1914 | District 1 | SR 35 (US 17) FROM REA RD TO SR 62 | 2 of 6 | $2,103,069 | +1.0% |
| 11 JUN 2025 | T5856 | District 5 | HIGH BRIDGE AND MAIN STREET BRIDGE FROM EB DRAWBRIDGE SIG... | 2 of 5 | $624,557 | +14% |
| 28 MAY 2025 | T1900 | District 1 | SR 45 (US 41) FROM 63RD AVE TO 53RD AVE | 2 of 4 | $5,050,195 | +8.0% |
| 28 MAY 2025 | T4707 | District 4 | SR 806 (ATLANTIC AVE) AND SR 704 (OKEECHOBEE BLVD) AT HOME.. | 5 of 6 | $3,601,698 | +14% |
| 30 APR 2025 | T5850 | District 5 | SR 5 (US 1) FROM N OF CENTURY OAKS CR TO N OF MYERS DR | 3 of 7 | $7,675,773 | +8.0% |
| 04 DEC 2024 | T5842 | District 5 | SR 600/15 (US 17-92 / S VOLUSIA AVE) AT ENTERPRISE RD | 1 of 3 | $1,964,413 | Low, 8.0% under the second |
| 28 FEB 2024 | T4680 | District 4 | SR 882 (FOREST HILL BLVD), SR 5 (US 1), SR 805 (DIXIE HWY).. | 1 of 4 | $977,856 | Low, 36% under the second |
| 26 APR 2023 | T5759 | District 5 | SR A1A | 1 of 3 | $3,865,830 | Low, 5.0% under the second |
| 25 JAN 2023 | T5780 | District 5 | SR 509 (NASA BLVD) | 2 of 6 | $1,937,827 | +17% |
| 07 DEC 2022 | T4629 | District 4 | SR 9 (I-95) | 1 of 4 | $1,050,673 | Low, 4.0% under the second |
| 26 OCT 2022 | T4625 | District 4 | SR 5 US 1) AND SR 794 | 5 of 7 | $4,406,906 | +24% |
| 05 OCT 2022 | T5764 | District 5 | SR 518 | 1 of 2 | $2,470,270 | Low, 41% under the second |
| 15 JUN 2022 | T2873 | District 2 | SR 104 (DUNN AVE) | 3 of 4 | $369,572 | +54% |
| 25 MAY 2022 | T5746 | District 5 | SR 3 (N COURTENAY PKWY) | 1 of 2 | $1,480,640 | Low, 22% under the second |
| 30 MAR 2022 | T5726 | District 5 | SR A1A | 1 of 6 | $1,057,650 | Low, 2.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.