FDOT contract T4702 bid tabulation

SR 7 (US 441) AT LAKE WORTH RD. Let by Florida DOT on August 27, 2025, Palm Beach, District 4. 8 bids received; low bid $3,408,647 by The Stout Group LLC.

Owner
Florida DOT
Letting
27 AUG 2025
Pay items
141
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1The Stout Group LLC$3,408,647Low
2Ohla USA Inc$3,415,1980.0%
3General Asphalt Company, LLC$3,453,411+1.0%
4Florida Engineering & Development Corp$3,554,681+4.0%
5Carr Construction, LLC$3,578,204+5.0%
6Ranger Construction Industries, Inc.$3,579,817+5.0%
7Roadway Construction, LLC$3,741,314+10%
8Halley Engineering Contractors, Inc.$3,989,477+17%
FDOT contract T4702: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. The Stout Group LLC2. Ohla USA Inc3. General Asphalt Company, LLC4. Florida Engineering & Development Corp5. Carr Construction, LLC6. Ranger Construction Industries, Inc.
0005Mobilization (0101-1)LS1$330,000$340,000$300,000$355,284$248,000$546,100
0010Maintenance of traffic (0102-1)DA1$300,000$180,000$475,000$325,803$121,700$247,445
0015Traffic control officer (0102-14)HR184$90.00$75.00$88.00$88.17$100.00$90.92
0020Work zone sign (0102-60)ED8,134$0.19$0.21$0.23$0.22$0.23$0.25
0025Temporary barrier, F&I, free standing (0102-71-16)LF840$48.00$42.00$1.10$43.26$42.00$47.75
0030Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED9,656$0.10$0.10$0.13$0.12$0.10$0.10
0035Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD10,872$0.04$0.05$0.07$0.06$0.10$0.06
0040Arrow board / advance warning arrow panel (0102-76)ED350$5.00$4.50$5.50$5.15$5.00$5.12
0045Temporary crash cushion, redirective option (0102-89-1)LO2$1,500.00$1,050.00$951.50$890.95$1,050.00$3,162.00
0050Portable changeable message sign, temporary (0102-99)ED904$9.00$9.00$10.95$10.25$9.00$10.25
0055Temporary signalization and maintenance, intersection (0102-104)ED212$32.40$23.00$35.64$33.37$12.25$47.73
0060Temporary traffic detection and maintenance, intersection (0102-107-1)ED212$31.20$44.00$34.32$32.14$12.25$23.86
0065Type III barricade (0102-115)ED424$0.75$0.25$0.35$0.33$0.30$0.30
0070Sediment barrier (0104-10-3)LF2,251$8.00$5.00$1.10$2.71$5.40$3.55
0075Floating turbidity barrier (0104-11)LF42$35.00$35.00$22.00$70.56$1,131.00$30.42
0080Inlet protection system (0104-18)EACH6$200.00$1,200.00$181.50$124.26$597.00$328.70
0085Litter removal (0107-1)ACRE20.68$1.00$100.00$1.10$35.60$326.00$331.00
0090Mowing (0107-2)ACRE15.50$1.00$100.00$1.10$56.80$408.00$280.70
0095Monitor existing structures- inspection and settlement monitoring (0108-1)LS1$20,000$9,300.00$1.10$1,545.00$7,300.00$3,410.00
0100Clearing & grubbing (0110-1-1)ACRE1$105,000$350,000$92,499$112,526$50,953$27,600
0105Removal of existing concrete (0110-4-10)SY654$25.00$50.00$27.50$45.66$52.00$32.42
0110Tree protection barrier (0110-21)LF180$15.00$12.00$11.00$9.34$8.70$2.30
0115Tree root and branch pruning (0110-22)EACH4$650.00$4,000.00$1,870.00$5,150.00$1,304.00$852.50
0120Regular excavation (0120-1)CY855$55.00$50.00$92.62$138.11$35.00$23.80
0125Embankment (0120-6)CY988$65.00$25.00$44.55$63.94$35.00$37.50
0130Type B stabilization (0160-4)SY2,130$25.00$18.00$17.60$19.47$37.50$28.32
0135Optional base, base group 01 (0285-701)SY475$55.00$31.00$39.05$28.79$55.00$47.05
0140Optional base, base group 02 (0285-702)SY87$55.00$60.00$40.70$110.38$55.00$219.10
0145Optional base, base group 09 (0285-709)SY888$83.00$47.00$48.40$99.85$55.00$37.80
0150Optional base, base group 10 (0285-710)SY772$90.00$48.00$87.73$118.88$55.00$77.82
0155Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY18,382$3.50$6.00$4.12$4.94$7.70$5.25
0160Superpave asphaltic conc, traffic C (0334-1-13)TN149.40$210.00$200.00$322.19$375.95$338.00$379.00
0165Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN1,650.50$230.00$175.00$212.94$249.26$225.00$209.50
0170Miscellaneous asphalt (0339-1)TN28.60$350.00$315.00$495.00$353.35$100.00$494.35
0175Inlets, curb, type P-5, <10' (0425-1351)EACH1$16,000$11,000$15,400$9,227.27$14,000$15,910
0180Inlets, curb, type P-5, >10' (0425-1352)EACH2$19,000$11,000$16,500$14,437$14,500$16,500
0185Inlets, curb, type J-5, <10' (0425-1451)EACH2$17,000$11,000$19,800$10,967$18,000$20,455
0190Inlets, curb, type J-5, >10' (0425-1452)EACH1$21,000$11,000$20,900$22,305$19,000$21,600
0195Inlets, curb, type J-6, <10' (0425-1461)EACH1$17,000$11,000$20,350$11,171$18,500$21,023
0200Inlets, DT bot, type C,<10' (0425-1521)EACH1$15,000$11,000$6,600.00$7,572.48$6,000.00$6,820.00
0205Inlets, closed flume (0425-1910)EACH1$20,000$18,000$9,900.00$8,751.85$9,000.00$10,228
0210Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF280$200.00$300.00$154.00$131.79$135.00$153.42
0215French drain, 24" (0443-70-4)LF449$350.00$400.00$357.50$202.70$325.00$369.35
0220Concrete curb & gutter, type E (0520-1-7)LF2,453$33.00$50.00$39.60$66.21$145.00$44.20
0225Traffic separator concrete- type IV, 6' wide (0520-5-42)LF15$250.00$415.00$275.00$293.75$227.00$113.65
0230Concrete sidewalk and driveways, 6" thick (0522-2)SY499$90.00$140.00$85.97$89.41$150.00$108.40
0235Detectable warnings (0527-2)SF112$40.00$70.00$39.60$40.63$30.00$56.82
0240Guardrail -roadway, general (0536-1-1)LF939$28.81$29.00$29.15$28.79$28.00$24.95
0245Rub rail for guardrail, single sided rub rail (0536-5-1)LF163$15.25$16.00$17.60$12.48$12.00$17.60
0250Pipe rail for guardrail (0536-6)LF189$24.25$19.00$27.50$22.70$22.00$21.10
0255Guardrail end treatment- trailing anchorage (0536-85-20)EACH6$1,675.00$1,400.00$1,870.00$1,626.97$1,580.00$1,503.00
0260Guardrail end treatment- parallel approach terminal (0536-85-24)EACH3$3,850.00$3,200.00$3,630.00$3,579.73$3,500.00$3,462.00
0265Guardrail end treatment- type CRT (0536-85-26)EACH1$2,190.00$3,200.00$4,180.00$4,368.16$4,250.00$3,500.00
0270Performance turf, sod (0570-1-2)SY5,167$12.00$5.00$3.47$3.71$10.00$6.27
0275Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.36$1,800.00$1,840.00$1,925.00$1,802.50$1,401.00$1,575.00
0280Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.03$2,000.00$2,300.00$2,933.70$2,747.20$2,160.00$1,592.00
0285Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF1,096$2.00$1.80$1.87$1.75$1.10$1.25
0290Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF105$3.00$1.98$1.98$1.85$1.60$1.76
0295Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF349$4.00$2.05$2.09$1.96$2.00$2.30
0300Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM0.81$1,000.00$530.00$550.00$515.00$648.00$720.00
0305Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.33$1,000.00$725.00$770.00$721.01$704.00$771.00
0310Painted pavement markings, standard, white, message or symbol (0710-11160)EACH2$100.00$50.00$49.50$46.35$100.00$114.00
0315Painted pavement markings, standard, white, arrows (0710-11170)EACH31$50.00$38.00$38.50$36.05$35.00$39.80
0320Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.47$1,800.00$1,900.00$1,925.00$1,802.50$1,406.00$1,593.00
0325Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF5$3.00$1.70$1.76$1.65$1.60$1.76
0330Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.11$1,800.00$722.00$770.00$720.97$681.00$770.00
0335Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
0340Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000$50,000$50,000
0345Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH7$480.00$625.00$649.59$597.40$480.00$546.00
0350Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH2$1,600.00$1,700.00$2,079.57$2,472.00$1,600.00$1,819.00
0355Single column ground sign assembly, remove (0700-1600)EACH8$65.00$65.00$55.00$46.35$65.00$74.00
0360Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113)EACH1$6,500.00$4,560.00$7,205.15$8,497.50$6,500.00$7,387.00
0365Multi-column ground sign assembly, remove (0700-2600)EACH1$1,250.00$750.00$1,320.00$2,317.50$1,250.00$1,421.00
0370Sign panel, furnish & install overhead mount, 31-50 SF (0700-3204)EACH4$3,384.21$3,300.00$3,722.63$3,347.50$3,311.00$4,057.00
0375Sign panel, relocate, 21-30 SF (0700-3503)EACH1$400.00$2,560.00$874.72$1,957.00$400.00$455.00
0380Sign panel, remove, 31-50 SF (0700-3604)EACH4$250.00$255.00$605.00$2,987.00$1,683.00$1,142.05
0385Overhead static sign furnish & install, cantilever, 40 FT (0700-4113)EACH1$130,000$125,000$133,232$124,754$133,000$115,552
0390Overhead static sign shallow foundation removal, cantilever (0700-4611)EACH1$10,000$12,750$7,920.44$7,416.41$8,332.00$18,205
0395Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH2$90.00$130.00$165.00$206.00$90.00$103.00
0400Tubular marker, 36" white post (0704-1-3)EACH1$165.00$275.00$264.00$257.50$170.00$187.50
0405Tubular marker, 36" yellow (0704-1-4)EACH5$175.00$275.00$264.00$257.50$175.00$199.00
0410Object marker, type 2 (0705-10-2)EACH12$130.00$125.00$275.64$123.60$130.00$148.00
0415Raised pavement marker, type B (0706-1-3)EACH419$4.00$4.40$4.57$4.27$4.00$4.55
0420Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF28$20.00$5.30$5.50$5.15$5.60$6.37
0425Painted pavement markings, surface (0710-90)LS1$8,200.00$9,225.00$9,590.90$8,980.57$8,200.00$9,320.00
0430Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,096$3.20$3.15$3.25$3.04$3.20$3.64
0435Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF105$4.95$4.70$4.87$4.56$5.00$5.62
0440Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF349$5.80$6.25$6.49$6.08$6.00$6.59
0445Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.33$2,900.00$2,400.00$2,475.00$2,317.50$2,918.00$3,216.00
0450Thermoplastic, standard, message or symbol (0711-11160)EACH2$120.00$69.00$71.50$66.95$120.00$137.00
0455Thermoplastic, standard, arrow (0711-11170)EACH31$68.00$53.00$55.00$51.50$70.00$77.27
0460Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF5$4.95$4.75$4.87$4.56$5.00$5.62
0465Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.11$2,900.00$2,317.00$2,475.00$2,317.52$3,080.00$3,208.00
0470Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF912$12.50$16.15$16.72$15.66$12.50$14.20
0475Thermoplastic, preformed, white, message (0711-14160)EACH6$215.00$222.00$231.00$216.30$215.00$244.35
0480Thermoplastic, preformed, white, arrow (0711-14170)EACH6$120.00$93.00$95.70$89.61$120.00$136.40
0485Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM1.36$6,500.00$5,325.00$5,571.50$5,216.95$5,204.00$5,870.00
0490Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.03$5,200.00$5,700.00$7,429.40$6,956.80$7,800.00$8,864.00
0495Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.81$5,200.00$1,300.00$1,393.70$1,305.00$2,020.00$2,245.00
0500Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.47$5,200.00$5,200.00$5,571.50$4,951.92$5,222.00$5,934.36
0505Green-colored pavement markings, bike lane (0714-10)SF1,021$7.15$9.20$9.52$8.91$7.20$8.12
0510Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH9$1,200.00$2,500.00$1,320.00$1,236.00$2,720.00$1,643.00
0515Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,943$5.00$2.69$5.50$5.15$3.20$3.02
0520Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF1,692$1.70$1.00$1.87$1.75$0.40$1.25
0525Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH4$1,180.00$3,900.00$1,298.00$1,215.40$1,919.00$1,448.87
0530Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH4$542.00$850.00$596.20$558.26$1,186.00$915.00
0535Conduit, furnish & install, directional bore (0630-2-12)LF1,247$38.70$61.00$42.57$39.86$49.25$26.10
0540Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$28,800$18,000$31,680$29,664$39,370$23,387
0545Signal cable, remove- intersection (0632-7-6)PI1$2,160.00$3,250.00$2,376.00$2,224.80$2,606.00$4,807.00
0550Span wire assembly, F&I, two point, box or drop box (0634-4153)PI1$32,533$16,750$35,787$33,509$17,887$13,080
0555Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH35$1,066.70$2,450.00$1,173.37$1,098.70$2,410.00$1,643.00
0560Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$4,386.90$7,200.00$4,825.59$4,518.51$6,713.00$2,966.00
0565Electrical power service, F&I, underground, meter not required (0639-1123)AS1$2,840.20$4,000.00$3,124.22$2,925.41$6,025.00$2,387.00
0570Electrical service wire, & install (0639-2-1)LF299$7.70$6.75$8.47$7.93$10.50$11.95
0575Electrical service wire, (0639-2-6)LF140$1.90$2.70$2.09$1.96$2.60$2.85
0580Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,346.80$2,100.00$2,581.48$2,417.20$2,371.00$1,802.00
0585Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80)EACH4$12,481$29,000$13,729$12,855$11,490$23,012
0590Aluminum signals pole, (0646-1-11)EACH7$2,593.50$3,850.00$2,852.85$2,671.31$3,367.00$2,620.00
0595Aluminum signals pole, remove (0646-1-60)EACH4$300.10$875.00$330.11$309.10$652.00$478.00
0600Steel strain pole, F&I, type PS- X (0649-1-17)EACH4$56,696$5,700.00$62,365$58,397$75,372$82,728
0605Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS30$2,057.50$2,400.00$2,263.25$2,119.23$2,452.00$1,995.00
0610Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS2$3,237.50$3,880.00$3,561.25$3,334.63$3,528.00$3,114.00
0615Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$986.80$1,050.00$1,085.48$1,016.40$1,165.00$1,114.00
0620Loop detector inductive, F&I, type 9 (0660-1109)EACH11$380.10$800.00$418.11$391.50$805.00$1,143.00
0625Loop assembly, F&I, type F (0660-2106)AS20$2,000.10$2,520.00$2,200.11$2,060.10$2,175.00$2,841.00
0630Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH1$10,800$14,500$10,831$10,142$9,100.00$14,100
0635Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH1$13,440$18,000$14,215$13,311$11,300$17,500
0640Pedestrian detector, furnish & install, standard (0665-1-11)EACH8$220.10$440.00$242.11$226.70$351.00$421.00
0645Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$71,850$69,000$62,920$58,916$62,578$55,341
0650Traffic controller assembly, remove controller with (0670-5600)AS1$480.10$2,100.00$528.00$494.50$978.00$1,250.00
0655ITS CCTV camera, non- pressurized, IP, high definition (0682-1173)EACH1$6,954.00$10,800$7,649.40$7,162.62$5,800.00$9,000.00
0660Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,200.00$6,000.00$4,620.00$4,326.00$3,800.00$5,785.00
0665Remote power management rpmu, furnish and install (0685-2-1)EACH1$8,333.70$1,500.00$9,167.07$8,583.71$2,045.00$1,240.00
0670Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH10$606.70$1,500.00$667.37$624.90$1,095.00$870.00
0675Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$2,853.50$5,312.00$3,138.85$2,939.11$8,586.00$4,926.15
0680Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF900$4.50$6.10$4.95$4.64$3.80$7.33
0685Fiber optic connection, install, splice (0633-2-31)EACH96$52.80$72.00$58.08$54.38$45.00$68.20
0690Fiber optic connection hardware, F&I, splice (0633-3-11)EACH2$1,470.00$2,150.00$1,617.00$1,514.10$1,360.00$2,103.00
0695Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH8$60.00$79.50$66.00$61.80$50.00$73.86
0700Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH6$1,122.10$2,700.00$1,234.31$1,155.76$3,023.00$1,643.00
0705Pull & splice box, F&I, 30" X 48" cover size (0635-2-15)EACH2$4,954.90$6,225.00$5,450.39$5,103.55$5,281.00$3,915.00
FDOT contract T4702: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of August 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy