Roadway Construction, LLC: FDOT bid record

Roadway Construction, LLC submitted 88 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 29 APR 2026, and was the low bidder on 13 of them (15%). When it was not low, its total sat a median +10% above the low bid.

Owner
Florida DOT
Low bid volume
$78,447,445
Latest bid
29 APR 2026
Data through
28 OCT 2026
88Bids
13Low bids
15Win rate, percent
+10%Median gap to the low bid when not low, 75 bids

By year

YearBidsLow bidsWin rate
201812217%
201915213%
202015320%
202111218%
20228225%
2023500%
202518211%
2026400%
Roadway Construction, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 450612%
District 637616%
District 111100%
Roadway Construction, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH18470 (38%)$798.46$1,150.00
Conduit, furnish & install, directional bore0630-2-12LF15555 (35%)$25.20$30.82
Portable changeable message sign, temporary0102-99ED8654 (63%)$9.86$12.00
Work zone sign0102-60ED8850 (57%)$0.20$0.25
Arrow board / advance warning arrow panel0102-76ED7847 (60%)$5.00$5.90
Detectable warnings0527-2SF8644 (51%)$23.68$35.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED8842 (48%)$0.10$0.13
Raised pavement marker, type B0706-1-3EACH5330 (57%)$4.00$5.00
Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6"0711-11141GM7829 (37%)$1,312.47$2,500.00
Single post sign, F&I ground mount, UP to 12 SF0700-1-11AS6529 (45%)$325.36$406.23
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM8428 (33%)$4,172.04$5,220.00
Painted pavement markings, standard, white, solid, 6"0710-11101GM7128 (39%)$935.45$1,350.00
Roadway Construction, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Roadway Construction, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 APR 2026T4738District 4SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE..6 of 7$20,997,111+31%
25 MAR 2026T4740District 4SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD)6 of 9$7,069,937+11%
25 MAR 2026T6589District 6SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE6 of 6$15,323,839+34%
25 MAR 2026T6591District 6SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM...7 of 7$9,007,077+43%
29 OCT 2025T4727District 4SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 (2 of 13$5,752,508+17%
24 SEP 2025T6592District 6SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI1 of 7$3,628,931Low, 7.0% under the second
27 AUG 2025T4702District 4SR 7 (US 441) AT LAKE WORTH RD7 of 8$3,741,314+10%
27 AUG 2025T4715District 4SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 846 of 9$7,670,948+12%
27 AUG 2025T4728District 4N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD5 of 6$3,596,939+23%
27 AUG 2025T6609District 6SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT5 of 7$1,896,385+10%
30 JUL 2025T4726District 4UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD)3 of 6$1,636,235+17%
30 JUL 2025T6599District 6SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL4 of 6$6,446,078+10%
28 MAY 2025T4575District 4PORT ST LUCIE BLVD FROM S OF PAAR DR TO S OF ALCANTARRA BLVD1 of 4$25,577,358Low, 7.0% under the second
30 APR 2025T6606District 6SR 953 (LE JEUNE RD / SW 42 AVE) AND SR 976 (BIRD RD / SW...5 of 8$4,099,217+11%
26 MAR 2025T6601District 6SR 916 (NW 138 ST) FROM E OF NW 67 AVE TO NW 57 AVE5 of 7$2,840,583+11%
26 MAR 2025T6611District 6SR 5 (US 1/BISCAYNE BLVD) FROM NE 61 ST TO NE 6 AVE2 of 7$6,349,722+6.0%
26 FEB 2025T4697District 4SR 5 (US 1) FROM 59TH ST TO SR 850 (NORTHLAKE BLVD)3 of 4$14,452,514+7.0%
26 FEB 2025T4712District 4SR 7 (US 441) FROM MP 6.462 TO MP 8.1053 of 5$9,625,061+6.0%
26 FEB 2025T6588District 6SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM.4 of 6$2,512,056+29%
26 FEB 2025T6602District 6SR 988 (SR 826 FRONTAGE RD / NW 77TH CT) FROM NW 154TH ST...5 of 7$3,587,538+4.0%
29 JAN 2025T6576District 6SR 932 (NW 103RD ST) AT NW 103 ST AND NW 32 AVE9 of 9$1,962,680+22%
29 JAN 2025T6587District 6SR 972 (CORAL WAY / SW 3 AVE) FROM W OF SW 12 AVE TO BRICK..5 of 7$12,536,420+13%
06 DEC 2023T4657District 4SR-A1A FROM S OF GRAND CT TO S OF LINTON BLVD4 of 6$10,684,200+28%
06 DEC 2023T6573District 6SR 976 (SW 40 ST/BIRD RD) FROM E OF SW 87 AVE TO W OF SR 8265 of 9$8,586,475+8.0%
25 OCT 2023T4651District 4VARIOUS LOCATIONS AS SHOWN IN THE PLANS3 of 4$8,060,656+13%
Roadway Construction, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy