Roadway Construction, LLC: FDOT bid record
Roadway Construction, LLC submitted 88 bids on Florida DOT contracts in the data, from 28 MAR 2018 to 29 APR 2026, and was the low bidder on 13 of them (15%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $78,447,445
- Latest bid
- 29 APR 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 12 | 2 | 17% |
| 2019 | 15 | 2 | 13% |
| 2020 | 15 | 3 | 20% |
| 2021 | 11 | 2 | 18% |
| 2022 | 8 | 2 | 25% |
| 2023 | 5 | 0 | 0% |
| 2025 | 18 | 2 | 11% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 50 | 6 | 12% |
| District 6 | 37 | 6 | 16% |
| District 1 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 184 | 70 (38%) | $798.46 | $1,150.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 155 | 55 (35%) | $25.20 | $30.82 |
| Portable changeable message sign, temporary | 0102-99 | ED | 86 | 54 (63%) | $9.86 | $12.00 |
| Work zone sign | 0102-60 | ED | 88 | 50 (57%) | $0.20 | $0.25 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 78 | 47 (60%) | $5.00 | $5.90 |
| Detectable warnings | 0527-2 | SF | 86 | 44 (51%) | $23.68 | $35.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 88 | 42 (48%) | $0.10 | $0.13 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 53 | 30 (57%) | $4.00 | $5.00 |
| Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" | 0711-11141 | GM | 78 | 29 (37%) | $1,312.47 | $2,500.00 |
| Single post sign, F&I ground mount, UP to 12 SF | 0700-1-11 | AS | 65 | 29 (45%) | $325.36 | $406.23 |
| Thermoplastic, standard-other surfaces, white, solid, 6" | 0711-16101 | GM | 84 | 28 (33%) | $4,172.04 | $5,220.00 |
| Painted pavement markings, standard, white, solid, 6" | 0710-11101 | GM | 71 | 28 (39%) | $935.45 | $1,350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| General Asphalt Company, LLC | 69 | 43 of 69 |
| Weekley Asphalt Paving, Inc. | 64 | 33 of 64 |
| Ranger Construction Industries, Inc. | 39 | 10 of 39 |
| The Stout Group LLC | 35 | 17 of 35 |
| Halley Engineering Contractors, Inc. | 32 | 9 of 32 |
| Horizon Contractors, Inc. | 29 | 12 of 29 |
| Florida Engineering & Development Corp | 28 | 18 of 28 |
| Jva Engineering Contractor, Inc | 24 | 5 of 24 |
| Ohl USA Inc | 21 | 8 of 21 |
| Ohla USA Inc | 19 | 7 of 19 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 APR 2026 | T4738 | District 4 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | 6 of 7 | $20,997,111 | +31% |
| 25 MAR 2026 | T4740 | District 4 | SR 5 (US 1) FROM CAMINO REAL TO NE 8TH ST (MIZNER BLVD) | 6 of 9 | $7,069,937 | +11% |
| 25 MAR 2026 | T6589 | District 6 | SR 90 (US 41/SW 7TH ST) FROM E OF SW 27 AVE TO BRICKELL AVE | 6 of 6 | $15,323,839 | +34% |
| 25 MAR 2026 | T6591 | District 6 | SR 25 (US 27 OKEECHOBEE RD) AND SR 9 (NW 27 AVE) FROM... | 7 of 7 | $9,007,077 | +43% |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 2 of 13 | $5,752,508 | +17% |
| 24 SEP 2025 | T6592 | District 6 | SR 886 (PORT BLVD) FROM BISCAYNE BLVD TO PORT OF MIAMI | 1 of 7 | $3,628,931 | Low, 7.0% under the second |
| 27 AUG 2025 | T4702 | District 4 | SR 7 (US 441) AT LAKE WORTH RD | 7 of 8 | $3,741,314 | +10% |
| 27 AUG 2025 | T4715 | District 4 | SR 817 (UNIVERSITY DR) FROM NOVA DR TO SR 84 | 6 of 9 | $7,670,948 | +12% |
| 27 AUG 2025 | T4728 | District 4 | N 22ND AVE (SW 12TH AVE) FROM SHERIDAN ST TO STIRLING RD | 5 of 6 | $3,596,939 | +23% |
| 27 AUG 2025 | T6609 | District 6 | SR 986 (SUNSET DR) AND SR 94 (KENDALL DR) AT SW 72ND ST, AT | 5 of 7 | $1,896,385 | +10% |
| 30 JUL 2025 | T4726 | District 4 | UTOPIA DR FROM RIVIERA BLVD TO SR 824 (PEMBROKE RD) | 3 of 6 | $1,636,235 | +17% |
| 30 JUL 2025 | T6599 | District 6 | SR 934 (NW 79 ST) FROM NW 27 AVE TO NW 1 PL | 4 of 6 | $6,446,078 | +10% |
| 28 MAY 2025 | T4575 | District 4 | PORT ST LUCIE BLVD FROM S OF PAAR DR TO S OF ALCANTARRA BLVD | 1 of 4 | $25,577,358 | Low, 7.0% under the second |
| 30 APR 2025 | T6606 | District 6 | SR 953 (LE JEUNE RD / SW 42 AVE) AND SR 976 (BIRD RD / SW... | 5 of 8 | $4,099,217 | +11% |
| 26 MAR 2025 | T6601 | District 6 | SR 916 (NW 138 ST) FROM E OF NW 67 AVE TO NW 57 AVE | 5 of 7 | $2,840,583 | +11% |
| 26 MAR 2025 | T6611 | District 6 | SR 5 (US 1/BISCAYNE BLVD) FROM NE 61 ST TO NE 6 AVE | 2 of 7 | $6,349,722 | +6.0% |
| 26 FEB 2025 | T4697 | District 4 | SR 5 (US 1) FROM 59TH ST TO SR 850 (NORTHLAKE BLVD) | 3 of 4 | $14,452,514 | +7.0% |
| 26 FEB 2025 | T4712 | District 4 | SR 7 (US 441) FROM MP 6.462 TO MP 8.105 | 3 of 5 | $9,625,061 | +6.0% |
| 26 FEB 2025 | T6588 | District 6 | SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM. | 4 of 6 | $2,512,056 | +29% |
| 26 FEB 2025 | T6602 | District 6 | SR 988 (SR 826 FRONTAGE RD / NW 77TH CT) FROM NW 154TH ST... | 5 of 7 | $3,587,538 | +4.0% |
| 29 JAN 2025 | T6576 | District 6 | SR 932 (NW 103RD ST) AT NW 103 ST AND NW 32 AVE | 9 of 9 | $1,962,680 | +22% |
| 29 JAN 2025 | T6587 | District 6 | SR 972 (CORAL WAY / SW 3 AVE) FROM W OF SW 12 AVE TO BRICK.. | 5 of 7 | $12,536,420 | +13% |
| 06 DEC 2023 | T4657 | District 4 | SR-A1A FROM S OF GRAND CT TO S OF LINTON BLVD | 4 of 6 | $10,684,200 | +28% |
| 06 DEC 2023 | T6573 | District 6 | SR 976 (SW 40 ST/BIRD RD) FROM E OF SW 87 AVE TO W OF SR 826 | 5 of 9 | $8,586,475 | +8.0% |
| 25 OCT 2023 | T4651 | District 4 | VARIOUS LOCATIONS AS SHOWN IN THE PLANS | 3 of 4 | $8,060,656 | +13% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.