FDOT contract T6602 bid tabulation
SR 988 (SR 826 FRONTAGE RD / NW 77TH CT) FROM NW 154TH ST... Let by Florida DOT on February 26, 2025, Miami-Dade, District 6. 7 bids received; low bid $3,433,699 by Horizon Contractors, Inc..
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 136
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Horizon Contractors, Inc. | $3,433,699 | Low |
| 2 | Weekley Asphalt Paving, Inc. | $3,447,861 | 0.0% |
| 3 | General Asphalt Company, LLC | $3,467,357 | +1.0% |
| 4 | Bacallao Construction & Engineering Development, LLC D/B/A B | $3,492,413 | +2.0% |
| 5 | Roadway Construction, LLC | $3,587,538 | +4.0% |
| 6 | Florida Engineering & Development Corp | $3,616,127 | +5.0% |
| 7 | Jva Engineering Contractor, Inc | $3,765,050 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Horizon Contractors, Inc. | 2. Weekley Asphalt Paving, Inc. | 3. General Asphalt Company, LLC | 4. Bacallao Construction & Engineering Development, LLC D/B/A B | 5. Roadway Construction, LLC | 6. Florida Engineering & Development Corp |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $350,000 | $115,650 | $500,000 | $350,000 | $358,000 | $372,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $250,000 | $252,280 | $180,000 | $214,973 | $200,000 | $325,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $40,000 | $99,375 | $23,675 | $0.01 | $30,116 | $66,930 |
| 0020 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $1,500.00 | $29,625 | $5,500.00 | $0.01 | $3,437.67 | $10,278 |
| 0025 | Traffic control officer (0102-14) | HR | 1,200 | $85.00 | $87.00 | $44.00 | $65.00 | $97.73 | $99.19 |
| 0030 | Work zone sign (0102-60) | ED | 10,955 | $0.25 | $0.22 | $0.24 | $0.23 | $0.27 | $0.23 |
| 0035 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 520 | $49.00 | $47.00 | $46.20 | $0.01 | $0.01 | $48.81 |
| 0040 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,324 | $45.00 | $43.50 | $42.90 | $0.01 | $0.01 | $28.04 |
| 0045 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 1,836 | $40.00 | $39.00 | $38.50 | $0.01 | $0.01 | $19.17 |
| 0050 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 1,725 | $19.00 | $16.70 | $16.50 | $0.01 | $0.01 | $3.99 |
| 0055 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 16,970 | $0.15 | $0.13 | $0.14 | $0.10 | $0.16 | $0.13 |
| 0060 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 26,976 | $0.06 | $0.05 | $0.06 | $0.09 | $0.06 | $0.05 |
| 0065 | Arrow board / advance warning arrow panel (0102-76) | ED | 300 | $7.00 | $7.00 | $6.60 | $6.00 | $7.33 | $6.18 |
| 0070 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $1,000.00 | $2,900.00 | $979.00 | $0.01 | $1,087.25 | $916.70 |
| 0075 | Portable changeable message sign, temporary (0102-99) | ED | 300 | $14.00 | $12.00 | $12.65 | $10.00 | $14.05 | $11.85 |
| 0080 | Temporary signalization and maintenance, intersection (0102-104) | ED | 300 | $29.00 | $15.00 | $29.37 | $30.00 | $6.11 | $12.71 |
| 0085 | Type III barricade (0102-115) | ED | 1,225 | $0.30 | $0.80 | $0.31 | $0.25 | $0.34 | $0.29 |
| 0090 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 220 | $55.00 | $79.00 | $55.00 | $1.00 | $61.08 | $51.50 |
| 0095 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.02 | $40,000 | $12,500 | $9,240.00 | $14,000 | $6,841.33 | $12,875 |
| 0100 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 24 | $22.00 | $30.00 | $44.00 | $40.00 | $48.87 | $30.90 |
| 0105 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 3 | $700.00 | $500.00 | $165.00 | $150.00 | $183.24 | $515.00 |
| 0110 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.02 | $40,000 | $12,500 | $9,240.00 | $8,400.00 | $6,841.33 | $12,875 |
| 0115 | Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32) | GM | 0.02 | $40,000 | $5,000.00 | $5,852.00 | $5,300.00 | $1.00 | $5,150.00 |
| 0120 | Sediment barrier (0104-10-3) | LF | 4,198 | $3.00 | $1.95 | $1.10 | $2.00 | $1.78 | $1.94 |
| 0125 | Floating turbidity barrier (0104-11) | LF | 259 | $20.00 | $28.00 | $13.20 | $34.00 | $16.13 | $60.68 |
| 0130 | Soil tracking prevention device (0104-15) | EACH | 2 | $4,500.00 | $2,900.00 | $4,400.00 | $100.00 | $993.66 | $4,678.78 |
| 0135 | Inlet protection system (0104-18) | EACH | 8 | $100.00 | $150.00 | $825.00 | $50.00 | $183.35 | $94.47 |
| 0140 | Litter removal (0107-1) | ACRE | 26.85 | $0.01 | $150.00 | $0.01 | $1.00 | $0.01 | $164.52 |
| 0145 | Mowing (0107-2) | ACRE | 25.25 | $0.01 | $150.00 | $0.01 | $1.00 | $0.01 | $209.21 |
| 0150 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $5,000.00 | $13,225 | $1.10 | $5,000.00 | $10,750 | $9,064.00 |
| 0155 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $5,000.00 | $17,670 | $1.10 | $5,000.00 | $8,551.39 | $19,570 |
| 0160 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $100,000 | $186,463 | $41,800 | $250,000 | $291,769 | $82,000 |
| 0165 | Removal of existing concrete (0110-4-10) | SY | 323 | $26.00 | $48.00 | $63.80 | $32.00 | $34.77 | $40.99 |
| 0170 | Tree protection barrier (0110-21) | LF | 200 | $6.00 | $23.00 | $5.50 | $1.00 | $6.68 | $8.46 |
| 0175 | Regular excavation (0120-1) | CY | 260.10 | $25.00 | $59.00 | $98.12 | $45.00 | $64.84 | $78.38 |
| 0180 | Embankment (0120-6) | CY | 1,454.60 | $45.00 | $39.50 | $104.50 | $60.00 | $67.61 | $96.81 |
| 0185 | Flowable fill (0121-70) | CY | 4.10 | $500.00 | $395.00 | $660.00 | $1,000.00 | $484.14 | $250.45 |
| 0190 | Type B stabilization (0160-4) | SY | 1,475 | $0.01 | $15.80 | $20.63 | $5.00 | $29.09 | $18.92 |
| 0195 | Optional base, base group 02 (0285-702) | SY | 1,291 | $21.00 | $38.51 | $29.37 | $30.00 | $20.00 | $23.10 |
| 0200 | Optional base, base group 11 (0285-711) | SY | 17 | $80.00 | $60.00 | $148.50 | $165.00 | $211.21 | $106.35 |
| 0205 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 10,578 | $6.00 | $2.50 | $3.14 | $5.00 | $6.11 | $3.64 |
| 0210 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 1,610.40 | $190.00 | $185.00 | $177.00 | $185.00 | $213.78 | $198.73 |
| 0215 | Asphalt concrete friction course,traffic B, FC-9.5, PG 76-22 (0337-7-80) | TN | 737.70 | $245.00 | $200.00 | $214.00 | $225.00 | $274.87 | $239.97 |
| 0220 | Miscellaneous asphalt (0339-1) | TN | 79.30 | $250.00 | $250.00 | $305.74 | $300.00 | $298.91 | $225.02 |
| 0225 | Concrete class NS, gravity index 400-011 (0400-0-11) | CY | 9.30 | $850.00 | $1,256.00 | $1,243.00 | $4,000.00 | $1,810.19 | $1,133.78 |
| 0230 | Concrete class II, bulkhead (0400-2-8) | CY | 1.40 | $5,800.00 | $6,150.00 | $6,050.00 | $13,000 | $6,718.95 | $6,293.43 |
| 0235 | Conc class IV, retaining walls (0400-4-11) | CY | 8 | $3,000.00 | $3,310.00 | $3,272.50 | $4,600.00 | $4,133.93 | $2,884.89 |
| 0240 | Reinforcing steel- retaining wall (0415-1-3) | LB | 832 | $2.15 | $2.25 | $2.20 | $7.00 | $2.44 | $2.03 |
| 0245 | Reinforcing steel- bulkhead (0415-1-8) | LB | 562 | $2.25 | $2.25 | $2.20 | $7.00 | $2.44 | $2.40 |
| 0250 | Inlets, curb, type 9, J bot, <10' (0425-1203) | EACH | 2 | $7,500.00 | $10,000 | $11,506 | $12,000 | $11,954 | $11,409 |
| 0255 | Inlets, curb, type P-5, <10' (0425-1351) | EACH | 2 | $7,400.00 | $9,500.00 | $11,858 | $12,250 | $9,943.25 | $10,977 |
| 0260 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 3 | $8,000.00 | $10,000 | $12,199 | $12,500 | $10,548 | $11,955 |
| 0265 | Inlets, curb, type J-5, <10' (0425-1451) | EACH | 7 | $8,200.00 | $13,900 | $13,409 | $13,500 | $11,736 | $12,158 |
| 0270 | Inlets, curb, type J-6, <10' (0425-1461) | EACH | 3 | $8,800.00 | $15,000 | $13,662 | $14,000 | $12,377 | $15,404 |
| 0275 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $5,600.00 | $7,000.00 | $10,093 | $7,500.00 | $9,011.57 | $7,949.97 |
| 0280 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $7,700.00 | $7,000.00 | $11,770 | $9,400.00 | $14,451 | $13,179 |
| 0285 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 1 | $9,900.00 | $14,500 | $12,925 | $12,800 | $13,643 | $11,416 |
| 0290 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 3 | $7,000.00 | $9,000.00 | $10,241 | $9,000.00 | $10,314 | $8,889.97 |
| 0295 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $6,000.00 | $5,990.00 | $10,538 | $9,400.00 | $8,529.17 | $8,153.54 |
| 0300 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $6,600.00 | $9,000.00 | $11,418 | $11,250 | $9,385.97 | $8,669.38 |
| 0305 | Manholes, J-7, >10' (0425-2-72) | EACH | 1 | $7,200.00 | $12,000 | $24,024 | $12,200 | $10,333 | $15,097 |
| 0310 | Pipe culvert,optional material,round, 15"S/CD (0430-175115) | LF | 33 | $500.00 | $370.00 | $710.60 | $445.00 | $250.97 | $235.33 |
| 0315 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 736 | $400.00 | $265.00 | $245.30 | $200.00 | $261.68 | $238.39 |
| 0320 | French drain, 24" (0443-70-4) | LF | 339 | $300.00 | $350.00 | $352.00 | $350.00 | $267.92 | $207.23 |
| 0325 | Bullet rail, double rail (0515-4-2) | LF | 78 | $140.00 | $189.00 | $187.00 | $150.00 | $157.00 | $175.10 |
| 0330 | Concrete curb & gutter, type E (0520-1-7) | LF | 127 | $40.00 | $69.44 | $35.13 | $48.00 | $75.97 | $61.96 |
| 0335 | Concrete curb & gutter, type F (0520-1-10) | LF | 3,282 | $44.00 | $55.00 | $32.08 | $50.00 | $43.25 | $49.33 |
| 0340 | Valley gutter- concrete (0520-3) | LF | 310 | $40.00 | $59.00 | $26.32 | $48.50 | $28.38 | $62.37 |
| 0345 | Median concrete barrier, tall grade-separated (0521-1-13) | LF | 88 | $650.00 | $673.00 | $665.50 | $1,150.00 | $775.37 | $622.69 |
| 0350 | Concrete traffic railing barrier, with junction slab, 32" vertical face (0521-8-3) | LF | 78 | $450.00 | $449.00 | $444.40 | $970.00 | $534.47 | $448.10 |
| 0355 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 465 | $70.00 | $94.52 | $58.43 | $91.00 | $73.45 | $73.52 |
| 0360 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 74 | $100.00 | $114.55 | $79.20 | $113.00 | $162.82 | $101.39 |
| 0365 | Detectable warnings (0527-2) | SF | 202 | $30.00 | $48.00 | $46.34 | $35.00 | $38.88 | $43.31 |
| 0370 | Riprap, sand-cement bags (0530-1100) | CY | 9 | $600.00 | $1,734.00 | $1,100.00 | $1,285.00 | $1,130.25 | $1,618.23 |
| 0375 | Guardrail -roadway, general (0536-1-1) | LF | 3,205 | $24.50 | $30.00 | $29.70 | $29.00 | $27.80 | $27.81 |
| 0380 | Special guardrail post- deep post for slope break timber or steel (0536-7-1) | EACH | 111 | $122.00 | $189.00 | $187.00 | $144.00 | $137.57 | $175.10 |
| 0385 | Special guardrail post- special steel post for concrete structure mount (0536-7-2) | EACH | 25 | $300.00 | $345.00 | $341.00 | $350.00 | $336.52 | $319.30 |
| 0390 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 3 | $110.00 | $217.00 | $214.50 | $125.00 | $121.23 | $200.85 |
| 0395 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 1 | $3,000.00 | $3,834.00 | $3,795.00 | $3,450.00 | $3,318.81 | $3,553.50 |
| 0400 | Guardrail removal (0536-73) | LF | 3,289 | $2.00 | $1.67 | $1.65 | $2.50 | $2.63 | $1.55 |
| 0405 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $2,500.00 | $1,890.00 | $1,870.00 | $1,500.00 | $1,451.78 | $1,751.00 |
| 0410 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $3,500.00 | $3,835.00 | $3,795.00 | $3,750.00 | $3,592.89 | $3,553.50 |
| 0415 | Fencing, type B, 6.1-7.0', (0550-10230) | LF | 206 | $23.00 | $36.00 | $35.20 | $26.00 | $25.14 | $32.96 |
| 0420 | Performance turf, sod (0570-1-2) | SY | 4,705 | $4.00 | $4.95 | $3.85 | $7.00 | $4.28 | $4.15 |
| 0425 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0430 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 6.43 | $2,900.00 | $1,000.00 | $1,070.85 | $1,225.00 | $1,189.26 | $1,545.00 |
| 0435 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 190 | $2.00 | $2.75 | $1.10 | $1.25 | $1.22 | $2.06 |
| 0440 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 106 | $2.00 | $3.00 | $1.65 | $1.75 | $1.83 | $3.09 |
| 0445 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 398 | $3.00 | $4.00 | $2.20 | $2.50 | $2.44 | $4.12 |
| 0450 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 4 | $100.00 | $100.00 | $68.75 | $79.00 | $76.35 | $103.00 |
| 0455 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 4 | $100.00 | $45.00 | $110.00 | $125.00 | $122.16 | $46.35 |
| 0460 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 6.54 | $2,800.00 | $1,500.00 | $1,427.80 | $1,650.00 | $1,586.64 | $1,545.00 |
| 0465 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 839 | $2.00 | $3.00 | $1.24 | $1.25 | $1.38 | $3.09 |
| 0470 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.57 | $1,000.00 | $800.00 | $935.00 | $1,000.00 | $1,042.04 | $824.00 |
| 0475 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.12 | $5,000.00 | $800.00 | $935.00 | $1,050.00 | $1,047.14 | $824.03 |
| 0480 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0485 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 10 | $65.00 | $65.00 | $65.67 | $70.00 | $48.87 | $46.91 |
| 0490 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,200.00 | $2,000.00 | $1,174.91 | $1,250.00 | $1,832.44 | $1,884.98 |
| 0495 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 24 | $540.00 | $650.00 | $715.00 | $500.00 | $488.65 | $669.50 |
| 0500 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $520.00 | $1,000.00 | $1,100.00 | $350.00 | $348.17 | $1,030.00 |
| 0505 | Single column ground sign assembly, remove (0700-1600) | EACH | 32 | $20.00 | $50.00 | $55.00 | $25.00 | $24.43 | $51.50 |
| 0510 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $900.00 | $2,000.00 | $2,200.00 | $600.00 | $794.06 | $2,060.00 |
| 0515 | Enhanced highway sign solar powered, F&I ground mount, W/eds, UP to 12 SF of static sign panels (0700-142131) | EACH | 2 | $18,000 | $18,500 | $17,527 | $20,000 | $17,714 | $17,858 |
| 0520 | Raised pavement marker, type B (0706-1-3) | EACH | 339 | $6.00 | $5.00 | $4.40 | $5.00 | $4.89 | $5.15 |
| 0525 | Painted pavement markings, surface (0710-90) | LS | 1 | $15,000 | $10,000 | $19,680 | $20,000 | $21,856 | $10,300 |
| 0530 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 419 | $4.00 | $5.00 | $2.59 | $3.00 | $2.87 | $5.15 |
| 0535 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 69 | $6.00 | $9.00 | $4.90 | $5.50 | $5.44 | $9.27 |
| 0540 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 2 | $130.00 | $300.00 | $206.25 | $225.00 | $229.06 | $309.00 |
| 0545 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $100.00 | $90.00 | $192.50 | $225.00 | $213.79 | $92.70 |
| 0550 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 457 | $5.00 | $7.00 | $2.20 | $2.50 | $2.44 | $7.21 |
| 0555 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 30 | $20.00 | $20.00 | $12.21 | $14.00 | $13.56 | $20.60 |
| 0560 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 1.26 | $7,000.00 | $7,500.00 | $4,290.00 | $4,750.00 | $4,749.26 | $7,725.00 |
| 0565 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 1.51 | $7,200.00 | $7,500.00 | $4,647.50 | $5,250.00 | $5,151.14 | $7,725.00 |
| 0570 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 415 | $66.00 | $35.00 | $66.11 | $75.00 | $48.87 | $43.82 |
| 0575 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 8 | $1,700.00 | $1,850.00 | $1,707.64 | $1,750.00 | $1,832.44 | $1,884.98 |
| 0580 | Electrical service disconnect, F&I, pole mount (0639-3-11) | EACH | 1 | $8,000.00 | $3,000.00 | $7,152.97 | $7,500.00 | $7,940.57 | $7,159.78 |
| 0585 | Electrical service disconnect, remove- pole or cabinet to remain (0639-3-60) | EACH | 1 | $1,000.00 | $850.00 | $796.84 | $800.00 | $1,832.44 | $762.65 |
| 0590 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 1,326 | $5.00 | $3.00 | $5.06 | $5.00 | $7.33 | $4.00 |
| 0595 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 60 | $5.00 | $5.00 | $2.75 | $3.00 | $2.44 | $0.50 |
| 0600 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $17,000 | $22,500 | $16,575 | $20,000 | $25,960 | $22,248 |
| 0605 | Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 0' arm length (0715-61100) | EACH | 2 | $7,600.00 | $8,500.00 | $7,557.33 | $8,500.00 | $13,682 | $12,337 |
| 0610 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 1 | $1,000.00 | $950.00 | $796.84 | $800.00 | $3,054.07 | $1,016.87 |
| 0615 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 2 | $900.00 | $2,000.00 | $823.35 | $1,000.00 | $1,343.79 | $1,743.43 |
| 0620 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,291 | $60.00 | $40.00 | $61.60 | $70.00 | $36.65 | $47.59 |
| 0625 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 84 | $16.00 | $35.00 | $16.17 | $17.50 | $61.08 | $14.73 |
| 0630 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 16 | $1,600.00 | $1,750.00 | $1,614.91 | $1,500.00 | $1,832.44 | $1,884.98 |
| 0635 | Pull & splice box, install (0635-2-30) | EACH | 2 | $1,500.00 | $1,200.00 | $1,496.44 | $1,500.00 | $1,221.63 | $1,347.58 |
| 0640 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $8,800.00 | $6,200.00 | $8,854.89 | $10,000 | $6,352.46 | $7,159.78 |
| 0645 | Electrical power service, remove overhead (0639-1610) | AS | 1 | $700.00 | $1,200.00 | $704.11 | $750.00 | $1,832.44 | $1,016.87 |
| 0650 | Electrical power service, remove underground (0639-1620) | AS | 1 | $800.00 | $1,200.00 | $704.11 | $750.00 | $3,054.07 | $1,016.87 |
| 0655 | Electrical service wire, & install (0639-2-1) | LF | 1,503 | $13.00 | $10.00 | $12.98 | $15.00 | $12.22 | $12.00 |
| 0660 | Electrical service wire, (0639-2-6) | LF | 1,054 | $0.50 | $0.50 | $0.22 | $0.25 | $2.44 | $0.50 |
| 0665 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 2 | $3,700.00 | $2,900.00 | $3,744.51 | $4,500.00 | $3,420.56 | $4,348.72 |
| 0670 | Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3) | EACH | 2 | $4,300.00 | $3,200.00 | $4,224.22 | $5,000.00 | $5,497.32 | $7,260.23 |
| 0675 | Midblock crosswalk: rec rapid flashing beacon, solar, sign assembly- back-back accessible detector (0654-2-28) | AS | 2 | $16,000 | $17,500 | $15,675 | $19,000 | $21,592 | $18,189 |
| 0680 | Enhanced highway sign AC powered, F&I ground mount, W/beacon, 12-20 SF of static sign panels (0700-141112) | EACH | 2 | $13,000 | $12,500 | $12,026 | $12,500 | $22,649 | $16,949 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.