FDOT letting results, February 26, 2025
20 contracts let by Florida DOT on February 26, 2025, $181,310,165 in low bids, a median of 4.5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 20
- Low bids, total
- $181,310,165
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4691 | SR 9 (I-95) AT SR 804 (BOYNTON BEACH BLVD) INTERCHANGE | District 4 | 5 | Mastec Civil LLC | $64,295,000 | $66,289,449 | +3.0% | FDOT |
| T2A16 | SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND.... | District 2 | 5 | Anderson Columbia Co., Inc. | $13,809,124 | $14,508,274 | +5.0% | FDOT |
| T4697 | SR 5 (US 1) FROM 59TH ST TO SR 850 (NORTHLAKE BLVD) | District 4 | 4 | Ohla USA Inc | $13,446,097 | $14,411,329 | +7.0% | FDOT |
| T1892 | SR 60 FROM W OF SADDLEBAG LAKE RD TO E OF TIGER LAKE RD | District 1 | 5 | Ajax Paving Industries of Florida LLC | $13,238,320 | $13,776,955 | +4.0% | FDOT |
| T4693 | SR 7 (US 441) FROM N OF GLADES RD TO N OF BRIDGE BROOK DR | District 4 | 6 | Weekley Asphalt Paving, Inc. | $9,521,050 | $10,065,703 | +6.0% | FDOT |
| T4712 | SR 7 (US 441) FROM MP 6.462 TO MP 8.105 | District 4 | 5 | General Asphalt Company, LLC | $9,098,076 | $9,272,077 | +2.0% | FDOT |
| T1909 | SR 93 (I-275) FROM I-75 TO TERRA CEIA RIVER | District 1 | 4 | Preferred Materials Inc. | $8,699,382 | $9,073,844 | +4.0% | FDOT |
| T7565 | SR 686 FROM W OF BELCHER RD TO E OF US 19 | District 7 | 4 | Hubbard Construction Company | $7,978,009 | $8,367,239 | +5.0% | FDOT |
| T7543 | SR 54 FROM E OF GUNN HWY TO E OF CROSSING BLVD AND SR 54A... | District 7 | 4 | Hubbard Construction Company | $6,298,614 | $7,925,505 | +26% | FDOT |
| T7555 | SR 50 FROM MONDON HILL RD TO S OF JASMINE DR | District 7 | 4 | C.W. Roberts Contracting, Inc. | $5,942,087 | $6,065,001 | +2.0% | FDOT |
| T2A17 | SR 222 (NW 39TH AVE) AT SR 25 (US 441/SW 13TH ST) AND FROM.. | District 2 | 5 | Preferred Materials Inc. | $4,900,100 | $5,035,284 | +3.0% | FDOT |
| T3853 | SR 63 (US 27/MONROE ST) FROM LAKESHORE DR TO JOHN KNOX RD | District 3 | 3 | Collins Land Services, Inc | $4,750,238 | $5,740,710 | +21% | FDOT |
| T1893 | SR 72 (CLARK RD) FROM HONROE AVE TO W OF GANTT RD | District 1 | 3 | Ajax Paving Industries of Florida LLC | $4,641,884 | $4,973,058 | +7.0% | FDOT |
| T2A15 | SR 115 (LEM TURNER RD) FROM DUVAL CO LINE TO SR 15 (US 1) | District 2 | 5 | Anderson Columbia Co., Inc. | $4,346,749 | $5,328,931 | +23% | FDOT |
| T6602 | SR 988 (SR 826 FRONTAGE RD / NW 77TH CT) FROM NW 154TH ST... | District 6 | 7 | Horizon Contractors, Inc. | $3,433,699 | $3,447,861 | 0.0% | FDOT |
| T2A05 | SR A1A (US 105) FROM SHAD CREEK TO LITTLE TALBOT ISLAND | District 2 | 4 | Pigott Asphalt and Sitework LLC | $2,487,602 | $3,118,595 | +25% | FDOT |
| T6588 | SR 7 (US 441/NW 8 AVE/NW 7 AVE) AND SR 993 (NW 12 AVE) FROM. | District 6 | 6 | Aum Construction Inc. | $1,940,772 | $2,449,246 | +26% | FDOT |
| T5846 | SR 434 (N ALAFAYA TR) FROM CENTAURUS DR TO SEMINOLE CO LINE | District 5 | 4 | American Design Engineering Construction Inc. | $1,377,191 | $1,471,067 | +7.0% | FDOT |
| T3909 | SR 750 (AIRPORT RD) FROM SR 95 (US 29) TO CR 95A (N PALAF... | District 3 | 4 | Pigott Asphalt and Sitework LLC | $989,048 | $999,769 | +1.0% | FDOT |
| T5857 | SR 600 (US 92) AND SR 44 FROM ON RAMP TO I-4 AND AT W OF G.. | District 5 | 5 | Halifax Paving, Inc. | $117,123 | $149,974 | +28% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.