FDOT contract T2A15 bid tabulation

SR 115 (LEM TURNER RD) FROM DUVAL CO LINE TO SR 15 (US 1). Let by Florida DOT on February 26, 2025, Nassau, District 2. 5 bids received; low bid $4,346,749 by Anderson Columbia Co., Inc..

Owner
Florida DOT
Letting
26 FEB 2025
Pay items
66
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Anderson Columbia Co., Inc.$4,346,749Low
2Duval Asphalt Products, Inc.$5,328,931+23%
3Preferred Materials Inc.$5,802,689+33%
4Hubbard Construction Company$6,023,798+39%
5Watson Civil Construction, Inc.$6,973,044+60%
FDOT contract T2A15: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Anderson Columbia Co., Inc.2. Duval Asphalt Products, Inc.3. Preferred Materials Inc.4. Hubbard Construction Company5. Watson Civil Construction, Inc.
0005Mobilization (0101-1)LS1$383,584$320,000$185,309$600,000$695,000
0010Maintenance of traffic (0102-1)DA1$464,053$670,000$643,431$898,000$1,023,300
0015Work zone sign (0102-60)ED7,800$0.36$0.35$0.25$0.28$0.45
0020Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED24,768$0.15$0.15$0.12$0.14$0.20
0025Temporary raised/retroreflective pavement marker, type D (0102-78-1)EACH1,063$6.24$7.50$4.75$6.96$6.30
0030Portable changeable message sign, temporary (0102-99)ED642$13.72$13.50$11.00$12.40$19.00
0035Sediment barrier (0104-10-3)LF3,419$3.06$7.50$3.69$2.78$1.20
0040Inlet protection system (0104-18)EACH21$249.43$175.00$378.22$140.00$110.00
0045Litter removal (0107-1)ACRE324.84$124.71$125.00$100.00$40.82$40.00
0050Mowing (0107-2)ACRE283.92$187.07$180.00$670.61$122.45$120.00
0055Clearing & grubbing (0110-1-1)ACRE1$20,070$150,000$54,493$120,000$990,000
0060Mailbox, F&I single (0110-7-1)EACH7$498.85$450.00$400.00$415.45$750.00
0065Borrow excavation, truck measure (0120-2-2)CY512.60$39.32$45.00$42.42$76.46$63.00
0070Regular excavation (3-R projects only) (0120-71)LS1$238,969$60,000$30,740$20,000$25,000
0075Optional base, base group 01 (0285-701)SY7,175$19.12$42.50$32.00$41.89$60.00
0080Milling existing asphalt pavement, 1" avg depth (0327-70-1)SY123$30.46$20.00$26.46$126.80$51.00
0085Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY62$60.44$40.00$52.49$128.30$53.00
0090Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8)SY77,136$1.25$1.85$4.30$5.00$3.60
0095Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12)SY34,347$1.79$2.25$4.60$6.40$3.40
0100Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN5,542.40$156.08$209.00$255.86$193.70$206.00
0105Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82)TN7,676$164.34$205.00$240.14$199.30$186.00
0110Miscellaneous asphalt (0339-1)TN83.60$556.05$400.00$493.76$693.36$270.00
0115Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF90$86.06$85.00$69.00$131.12$117.00
0120Guardrail -roadway, general (0536-1-1)LF795$37.41$32.00$27.44$25.00$28.00
0125Special guardrail post- post for shallow mount (0536-7-3)EACH5$218.24$175.00$122.81$100.00$160.00
0130Guardrail removal (0536-73)LF394$6.24$12.50$2.47$2.50$11.10
0135Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$3,117.81$2,500.00$1,619.34$2,100.00$2,300.00
0140Guardrail end treatment- parallel approach terminal (0536-85-24)EACH6$3,741.37$4,000.00$3,730.67$3,100.00$3,800.00
0145Performance turf, sod (0570-1-2)SY19,360$3.12$5.50$3.86$8.03$9.20
0150Performance turf, sod and shoulder treatment index (0570-1-3)SY4,073$5.58$12.50$17.00$7.33$14.70
0155Raised pavement marker, type B (0706-1-3)EACH1,938$5.92$7.00$4.75$6.96$4.30
0160Painted pavement markings, standard, white, solid, 6" (0710-11101)GM10.14$2,475.55$1,750.00$1,985.00$1,738.86$1,400.00
0165Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF687$2.18$3.25$1.75$3.48$2.70
0170Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF455$3.30$4.50$2.65$4.64$4.30
0175Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.10$910.39$900.00$730.00$956.39$745.00
0180Painted pavement markings, standard, white, message or symbol (0710-11160)EACH3$1,062.55$125.00$85.00$115.96$70.00
0185Painted pavement markings, standard, white, arrows (0710-11170)EACH28$62.36$50.00$50.00$52.18$59.00
0190Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM15.66$2,475.55$1,750.00$1,985.00$1,739.27$1,390.00
0195Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF946$3.43$3.50$2.75$3.48$2.70
0200Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM2.78$530.02$900.00$425.00$929.01$695.00
0205Initial contingency amount, DO not bid (0999-25)LS1$56,257$56,257$56,257$56,257$56,257
0210Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM13.75$2,070.22$2,000.00$3,520.16$2,393.37$2,450.00
0215Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH24$561.20$600.00$399.00$475.00$565.00
0220Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH23$2,494.25$1,500.00$1,067.00$1,150.00$1,300.00
0225Single column ground sign assembly, remove (0700-1600)EACH43$31.18$40.00$40.00$50.00$36.50
0230Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH6$280.60$250.00$277.00$265.00$231.00
0235Sign panel, relocate, UP to 12 SF (0700-3501)EACH7$124.71$115.00$130.00$55.00$96.00
0240Sign panel, remove, UP to 12 SF (0700-3601)EACH5$62.36$25.00$20.00$50.00$21.00
0245Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH3$112.24$125.00$85.00$85.00$103.00
0250Object marker, type 1 (0705-10-1)EACH6$280.60$275.00$205.00$250.00$254.00
0255Object marker, type 2 (0705-10-2)EACH21$280.60$135.00$95.00$60.00$122.00
0260Object marker, type 3 (0705-10-3)EACH4$280.60$275.00$205.00$265.00$261.00
0265Raised pavement marker, type B (0706-1-3)EACH1,938$5.92$7.00$4.75$6.96$4.55
0270Painted pavement markings, surface (0710-90)LS1$54,873$55,000$44,000$52,529$50,000
0275Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF687$7.17$8.00$5.75$8.12$5.00
0280Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF455$11.85$10.00$9.50$10.44$8.60
0285Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.10$3,367.23$5,000.00$2,700.00$5,379.48$2,500.00
0290Thermoplastic, standard, message or symbol (0711-11160)EACH3$187.06$300.00$150.00$289.90$214.00
0295Thermoplastic, standard, arrow (0711-11170)EACH28$112.24$100.00$90.00$98.56$107.00
0300Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF946$7.17$8.00$5.75$8.12$5.00
0305Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM10.14$4,863.78$6,000.00$3,900.00$6,028.06$5,350.00
0310Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM9.00$4,863.78$6,000.00$3,900.00$6,031.85$5,350.00
0315Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM1.39$2,406.95$4,000.00$1,930.00$4,064.39$1,700.00
0320Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF166$4.36$25.00$3.50$25.51$5.35
0325Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.14$56,121$36,000$45,000$38,481$51,500
0330Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.14$56,121$36,000$45,000$38,481$51,500
FDOT contract T2A15: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy