Watson Civil Construction, Inc.: FDOT bid record
Watson Civil Construction, Inc. submitted 153 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 30 SEP 2026, and was the low bidder on 34 of them (22%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $490,674,798
- Latest bid
- 30 SEP 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 12 | 3 | 25% |
| 2019 | 10 | 2 | 20% |
| 2020 | 9 | 2 | 22% |
| 2021 | 16 | 3 | 19% |
| 2022 | 11 | 3 | 27% |
| 2023 | 15 | 5 | 33% |
| 2024 | 31 | 10 | 32% |
| 2025 | 28 | 3 | 11% |
| 2026 | 21 | 3 | 14% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 46 | 12 | 26% |
| District 7 | 41 | 15 | 37% |
| District 1 | 31 | 4 | 13% |
| District 5 | 30 | 2 | 7% |
| District 4 | 3 | 0 | 0% |
| StateWide | 1 | 1 | 100% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 260 | 58 (22%) | $1,280.00 | $1,150.00 |
| Removal of existing concrete | 0110-4-10 | SY | 143 | 55 (38%) | $28.00 | $33.96 |
| Embankment | 0120-6 | CY | 123 | 49 (40%) | $16.00 | $30.04 |
| Inlet protection system | 0104-18 | EACH | 140 | 47 (34%) | $135.00 | $150.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 266 | 43 (16%) | $18.00 | $16.54 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 254 | 42 (17%) | $33.00 | $30.82 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 136 | 38 (28%) | $75.47 | $80.00 |
| Sediment barrier | 0104-10-3 | LF | 136 | 36 (26%) | $2.17 | $2.60 |
| Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" | 0710-11125 | LF | 127 | 36 (28%) | $2.05 | $2.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 186 | 34 (18%) | $4.60 | $5.00 |
| Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" | 0711-11241 | GM | 111 | 34 (31%) | $2,570.00 | $2,600.00 |
| Mowing | 0107-2 | ACRE | 144 | 33 (23%) | $100.00 | $80.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hubbard Construction Company | 58 | 27 of 58 |
| Ajax Paving Industries of Florida LLC | 52 | 20 of 52 |
| Preferred Materials Inc. | 52 | 27 of 52 |
| C.W. Roberts Contracting, Inc. | 34 | 23 of 34 |
| Ranger Construction Industries, Inc. | 24 | 12 of 24 |
| Russell Engineering, Inc. | 21 | 11 of 21 |
| Coxwell, J.B. Contracting, Inc. | 19 | 9 of 19 |
| Masci General Contractors, Inc | 19 | 12 of 19 |
| Duval Asphalt Products, Inc. | 19 | 12 of 19 |
| Superior Construction Company Southeast, LLC | 16 | 6 of 16 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 SEP 2026 | T5893 | District 5 | SR 483 (CLYDE MORRIS BLVD) FROM RICHARD PETTY BLVD TO SR 600 | 5 of 8 | $6,727,353 | +19% |
| 26 AUG 2026 | T1945 | District 1 | SR 93 (I-75) AND I-275 FROM N OF US 301 TO N OF I-275 AND FROM S OF US 19 TO N OF | 5 of 5 | $21,371,758 | +37% |
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 7 of 9 | $3,013,053 | +31% |
| 26 AUG 2026 | T5890 | District 5 | SR 50 (SR 60 / US 17-92 / E COLONIAL DR) FROM IRVINGTON AVE TO MAGUIRE | 1 of 6 | $5,460,945 | Low, 10% under the second |
| 10 JUN 2026 | T5888 | District 5 | SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE | 2 of 8 | $27,726,804 | +3.0% |
| 20 MAY 2026 | T5882 | District 5 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | 8 of 10 | $46,312,935 | +45% |
| 20 MAY 2026 | T7610 | District 7 | SR 590 (DREW ST) FROM N OSCEOLA AVE TO US 19 | 3 of 6 | $20,956,526 | +1.0% |
| 29 APR 2026 | T7562 | District 7 | SR 586 (CURLEW RD) AND SR 595 (US ALT 19 / BAYSHORE BLVD)... | 1 of 7 | $27,734,147 | Low, 15% under the second |
| 31 MAR 2026 | T3845 | District 3 | SR 30A (US 98 / PANAMA CITY BEACH PKWY) FROM E OF R JACKSON | 4 of 4 | $87,515,415 | +48% |
| 25 MAR 2026 | T1915 | District 1 | SR 78 FROM W OF SANTA BARBARA BLVD TO E OF DEL PRADO BLVD | 2 of 4 | $7,093,909 | +3.0% |
| 25 MAR 2026 | T1919 | District 1 | SR 35 (US 17) FROM S OF PINEGROVE CR TO N OF WASHINGTON LOOP | 3 of 4 | $8,332,150 | +12% |
| 25 MAR 2026 | T2A62 | District 2 | SR A1A (ATLANTIC AVE) FROM CENTRE ST TO S FLETCHER AVE | 3 of 5 | $7,442,156 | +48% |
| 25 FEB 2026 | T1813 | District 1 | SR 45 (US 41) FROM N OF EDWARDS DR TO N MAGELLAN... | 3 of 4 | $16,009,128 | +4.0% |
| 25 FEB 2026 | T1916 | District 1 | SR 72 FROM SR 45 (US 41) TO SAWYER RD | 4 of 5 | $16,450,906 | +11% |
| 25 FEB 2026 | T2A37 | District 2 | SR 228 FROM HART BRIDGE TO BEACH BLVD | 4 of 5 | $20,786,026 | +21% |
| 25 FEB 2026 | T2A57 | District 2 | SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD | 5 of 5 | $7,225,350 | +36% |
| 25 FEB 2026 | T7601 | District 7 | SR 60 FROM W OF BEN T DAVIS BEACH ENTRACE TO E OF BAYPORT DR | 6 of 6 | $9,196,161 | +30% |
| 28 JAN 2026 | T1922 | District 1 | SR 684 (CORTEZ RD) FROM 86TH ST W TO W OF 30TH ST W | 2 of 4 | $12,817,585 | +3.0% |
| 28 JAN 2026 | T2A54 | District 2 | SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | 5 of 5 | $6,564,509 | +33% |
| 28 JAN 2026 | T2A56 | District 2 | SR 202 AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF | 4 of 5 | $13,805,236 | +26% |
| 28 JAN 2026 | T7577 | District 7 | SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RD | 1 of 7 | $9,471,911 | Low, 0.0% under the second |
| 03 DEC 2025 | T2A48 | District 2 | SR A1A (MAYPORT ROAD) FROM ATLANTIC BLVD TO DUTTON ISLAND.. | 2 of 5 | $10,020,888 | +4.0% |
| 03 DEC 2025 | T2A51 | District 2 | SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA... | 4 of 5 | $5,204,327 | +26% |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 7 of 8 | $40,714,249 | +104% |
| 03 DEC 2025 | T7559 | District 7 | SR 400 (I-4) FROM E OF TAMPA BYPASS CANAL TO W OF I-75 | 1 of 5 | $8,564,850 | Low, 2.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.