FDOT contract T3845 bid tabulation
SR 30A (US 98 / PANAMA CITY BEACH PKWY) FROM E OF R JACKSON. Let by Florida DOT on March 31, 2026, Bay, District 3. 4 bids received; low bid $59,096,852 by Phoenix Construction Services, Inc..
- Owner
- Florida DOT
- Letting
- 31 MAR 2026
- Pay items
- 337
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Phoenix Construction Services, Inc. | $59,096,852 | Low |
| 2 | C.W. Roberts Contracting, Inc. | $66,886,918 | +13% |
| 3 | Anderson Columbia Co., Inc. | $68,890,389 | +17% |
| 4 | Watson Civil Construction, Inc. | $87,515,415 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Phoenix Construction Services, Inc. | 2. C.W. Roberts Contracting, Inc. | 3. Anderson Columbia Co., Inc. | 4. Watson Civil Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $5,785,000 | $6,610,000 | $6,913,576 | $8,700,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $1,750,000 | $2,120,000 | $1,055,571 | $8,400,000 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $1,799,000 | $2,400,000 | $1,831,973 | $1,353,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $2,035,000 | $1,725,000 | $653,276 | $1,321,000 |
| 0025 | Commercial material for temporary driveway maintenance (0102-3) | CY | 900 | $50.00 | $110.00 | $35.06 | $218.00 |
| 0030 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $110,000 | $43,000 | $22,126 | $104,000 |
| 0035 | Pedestrian escort/flagger (0102-5) | HR | 360 | $25.00 | $35.00 | $42.77 | $95.00 |
| 0040 | Traffic control officer (0102-14) | HR | 1,444 | $75.00 | $86.00 | $107.43 | $120.00 |
| 0045 | Work zone sign (0102-60) | ED | 215,957 | $0.25 | $0.25 | $0.30 | $0.34 |
| 0050 | Business sign (0102-61) | EACH | 53 | $100.00 | $110.00 | $119.35 | $100.00 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 11,034 | $50.00 | $53.50 | $42.20 | $50.00 |
| 0060 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 18,459 | $10.00 | $11.00 | $9.77 | $10.00 |
| 0065 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 771,892 | $0.10 | $0.10 | $0.12 | $0.15 |
| 0070 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 1,847,340 | $0.05 | $0.05 | $0.06 | $0.08 |
| 0075 | Temporary separator, F&I remove (0102-75-1) | LF | 27,165 | $19.00 | $20.00 | $22.68 | $19.00 |
| 0080 | Arrow board / advance warning arrow panel (0102-76) | ED | 4,491 | $5.00 | $5.35 | $5.97 | $7.00 |
| 0085 | Portable changeable message sign, temporary (0102-99) | ED | 6,198 | $12.00 | $13.00 | $14.32 | $17.00 |
| 0090 | Temporary signalization and maintenance, intersection (0102-104) | ED | 9,000 | $11.00 | $12.00 | $13.13 | $20.00 |
| 0095 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 9,000 | $11.00 | $12.00 | $13.13 | $20.00 |
| 0100 | Type III barricade (0102-115) | ED | 79,250 | $0.25 | $0.25 | $0.30 | $0.34 |
| 0105 | Sediment barrier (0104-10-3) | LF | 16,360 | $3.00 | $6.20 | $0.51 | $4.10 |
| 0110 | Floating turbidity barrier (0104-11) | LF | 319 | $15.00 | $31.00 | $28.05 | $18.00 |
| 0115 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 191 | $14.00 | $6.40 | $15.41 | $10.00 |
| 0120 | Soil tracking prevention device (0104-15) | EACH | 15 | $3,200.00 | $950.00 | $2,067.32 | $3,700.00 |
| 0125 | Inlet protection system (0104-18) | EACH | 123 | $180.00 | $570.00 | $268.56 | $137.00 |
| 0130 | Litter removal (0107-1) | ACRE | 3,509.84 | $35.00 | $59.00 | $59.68 | $100.00 |
| 0135 | Mowing (0107-2) | ACRE | 3,127.05 | $35.00 | $59.00 | $1.19 | $100.00 |
| 0140 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $30,000 | $43,000 | $140,843 | $149,000 |
| 0145 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $1,980,825 | $3,658,729 | $2,681,413 | $4,959,000 |
| 0150 | Removal of existing concrete (0110-4-10) | SY | 22,941 | $12.00 | $17.00 | $18.02 | $31.00 |
| 0155 | Tree protection barrier (0110-21) | LF | 2,298 | $5.00 | $3.60 | $7.33 | $6.00 |
| 0160 | Regular excavation (0120-1) | CY | 181,969.50 | $10.84 | $11.75 | $15.78 | $19.00 |
| 0165 | Embankment (0120-6) | CY | 40,909.10 | $6.75 | $15.25 | $5.53 | $8.00 |
| 0170 | Flowable fill (0121-70) | CY | 0.30 | $4,000.00 | $12,000 | $14,760 | $3,000.00 |
| 0175 | Type B stabilization (0160-4) | SY | 134,182 | $6.00 | $7.15 | $8.25 | $15.00 |
| 0180 | Optional base, base group 01 (0285-701) | SY | 3,015 | $23.35 | $12.00 | $17.12 | $31.00 |
| 0185 | Optional base, base group 02 (0285-702) | SY | 7,514 | $48.68 | $36.00 | $41.18 | $57.00 |
| 0190 | Optional base, base group 03 (0285-703) | SY | 3,617 | $24.00 | $22.00 | $24.14 | $33.00 |
| 0200 | Optional base, base group 09 (0285-709) | SY | 81,684 | $27.50 | $31.50 | $27.18 | $42.00 |
| 0205 | Optional base, base group 10 (0285-710) | SY | 22,577 | $42.50 | $50.00 | $53.54 | $90.00 |
| 0210 | Optional base- graded aggregate, greater than 14" (0285-771) | SY | 7,742 | $75.00 | $95.00 | $100.72 | $122.00 |
| 0215 | Milling existing asphalt pavement, 2 1/2" avg depth (0327-70-8) | SY | 162,501 | $2.00 | $3.15 | $3.49 | $4.00 |
| 0220 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 28,867.60 | $132.50 | $150.00 | $174.49 | $192.00 |
| 0225 | Asphalt concrete friction course,traffic C, FC-9.5, PG 76-22 (0337-7-82) | TN | 19,445.10 | $151.50 | $172.00 | $184.21 | $224.00 |
| 0230 | Miscellaneous asphalt (0339-1) | TN | 4.10 | $1,000.00 | $1,900.00 | $315.38 | $531.00 |
| 0235 | Concrete class IV, culverts (0400-4-1) | CY | 45 | $3,085.00 | $1,600.00 | $1,432.31 | $3,850.00 |
| 0240 | Conc class IV, bulkhead (0400-4-8) | CY | 212.30 | $1,000.00 | $690.00 | $1,476.32 | $1,340.00 |
| 0245 | Reinforcing steel- miscellaneous (0415-1-6) | LB | 6,953 | $1.90 | $3.75 | $4.18 | $2.00 |
| 0250 | Reinforcing steel- bulkhead (0415-1-8) | LB | 16,857 | $1.90 | $2.95 | $2.69 | $2.75 |
| 0255 | Inlets, curb, type P-1, <10' (0425-1311) | EACH | 30 | $9,000.00 | $11,700 | $11,555 | $9,000.00 |
| 0260 | Inlets, curb, type P-2, <10' (0425-1321) | EACH | 20 | $9,682.00 | $12,525 | $14,894 | $9,800.00 |
| 0265 | Inlets, curb, type P-3, <10' (0425-1331) | EACH | 2 | $8,375.00 | $12,000 | $13,787 | $8,800.00 |
| 0270 | Inlets, curb, type P-4, <10' (0425-1341) | EACH | 4 | $8,825.00 | $12,000 | $12,196 | $9,300.00 |
| 0275 | Inlets, curb, type P-6, <10' (0425-1361) | EACH | 1 | $8,620.00 | $12,000 | $13,814 | $9,100.00 |
| 0280 | Inlets, curb type J-1, <10' (0425-1411) | EACH | 3 | $10,308 | $13,000 | $15,609 | $11,600 |
| 0285 | Inlets, curb, type J-1, >10' (0425-1412) | EACH | 2 | $11,354 | $17,000 | $17,925 | $15,200 |
| 0290 | Inlets, curb, type J-2, <10' (0425-1421) | EACH | 1 | $11,600 | $17,000 | $17,660 | $13,500 |
| 0295 | Inlets, curb, type 7, <10' (0425-1471) | EACH | 10 | $8,100.00 | $10,000 | $18,108 | $9,400.00 |
| 0300 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 24 | $6,400.00 | $10,000 | $11,511 | $7,250.00 |
| 0305 | Inlets, ditch bottom, type D, J bot, <10' (0425-1543) | EACH | 4 | $9,200.00 | $13,000 | $11,511 | $11,000 |
| 0310 | Inlets, DT bot, type D, modify (0425-1549) | EACH | 1 | $8,120.00 | $14,000 | $11,511 | $16,000 |
| 0315 | Inlets, DT bot, type E, <10' (0425-1551) | EACH | 16 | $5,920.00 | $8,700.00 | $13,434 | $6,800.00 |
| 0320 | Inlets, DT bot, type E, modify (0425-1559) | EACH | 4 | $8,500.00 | $19,000 | $13,434 | $16,100 |
| 0325 | Inlets, DT bot, type H, <10' (0425-1581) | EACH | 8 | $7,800.00 | $13,000 | $30,335 | $10,000 |
| 0330 | Inlets, DT bot, type H, modify (0425-1589) | EACH | 1 | $10,450 | $16,000 | $13,344 | $19,000 |
| 0335 | Inlets, closed flume (0425-1910) | EACH | 8 | $4,700.00 | $8,000.00 | $7,446.49 | $4,300.00 |
| 0340 | Manholes, P-8, <10' (0425-2-61) | EACH | 12 | $5,900.00 | $8,800.00 | $12,368 | $5,700.00 |
| 0345 | Manholes, J-7, <10' (0425-2-71) | EACH | 1 | $9,600.00 | $13,000 | $15,396 | $11,200 |
| 0350 | Manholes, J-7, partial (0425-2-73) | EACH | 1 | $5,260.00 | $8,400.00 | $12,412 | $5,000.00 |
| 0355 | Manholes, J-8, <10' (0425-2-91) | EACH | 10 | $8,100.00 | $11,000 | $16,590 | $9,500.00 |
| 0360 | Manholes, J-8, >10' (0425-2-92) | EACH | 4 | $11,700 | $17,000 | $16,590 | $16,000 |
| 0365 | Grate for existing drainage structure, furnish and install (0425-14-1) | SF | 88 | $50.00 | $160.00 | $596.51 | $88.00 |
| 0370 | Pipe culvert, optional material, round, 18"SD (0430-174118) | LF | 283 | $158.00 | $180.00 | $111.09 | $133.00 |
| 0375 | Pipe culvert, optional material, round, 24"SD (0430-174124) | LF | 290 | $178.00 | $190.00 | $138.05 | $157.00 |
| 0380 | Pipe culvert, optional material, round, 36"SD (0430-174136) | LF | 227 | $183.00 | $270.00 | $195.62 | $265.00 |
| 0385 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 450 | $161.00 | $200.00 | $149.54 | $161.00 |
| 0390 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 46 | $200.00 | $250.00 | $194.14 | $214.00 |
| 0395 | Pipe culvert, optional material, other shape - ellip/arch, 30"SD (0430-174230) | LF | 267 | $218.00 | $320.00 | $253.60 | $322.00 |
| 0400 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 4,594 | $98.00 | $180.00 | $132.23 | $190.00 |
| 0405 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 5,484 | $118.00 | $190.00 | $140.06 | $207.00 |
| 0410 | Pipe culvert, opt material, round, 30"S/CD (0430-175130) | LF | 3,491 | $142.00 | $230.00 | $147.38 | $257.00 |
| 0415 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 2,772 | $153.00 | $250.00 | $193.67 | $292.00 |
| 0420 | Pipe culvert, opt material, round, 42"S/CD (0430-175142) | LF | 8 | $644.00 | $590.00 | $397.67 | $1,600.00 |
| 0425 | Pipe culvert, opt material, round, 48"S/CD (0430-175148) | LF | 391 | $251.00 | $290.00 | $286.02 | $417.00 |
| 0430 | Pipe culvert, opt material, round, 54"S/CD (0430-175154) | LF | 53 | $425.00 | $620.00 | $516.79 | $839.00 |
| 0435 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 1,121 | $141.00 | $210.00 | $149.34 | $201.00 |
| 0440 | Pipe culvert,optional material,other shape-elip/arch, 24"S/CD (0430-175224) | LF | 298 | $179.00 | $240.00 | $198.47 | $262.00 |
| 0445 | Pipe culvert, opt material, shape - elip/arch, 30"S/CD (0430-175230) | LF | 3,663 | $218.00 | $260.00 | $245.92 | $303.00 |
| 0450 | Pipe culvert, opt material, shape - elip/arch, 48"S/CD (0430-175248) | LF | 3,976 | $375.00 | $460.00 | $460.74 | $517.00 |
| 0455 | Straight concrete endwalls, double, 0 degrees, round (0430-524200) | EACH | 1 | $7,500.00 | $14,000 | $8,701.31 | $6,900.00 |
| 0460 | Straight concrete endwalls, single, 0 degrees, round (0430-530100) | EACH | 2 | $8,000.00 | $12,000 | $10,493 | $6,560.00 |
| 0465 | Straight concrete endwalls, double, 0 degrees, round (0430-530200) | EACH | 1 | $8,000.00 | $18,000 | $36,542 | $9,500.00 |
| 0470 | Straight concrete endwalls, double, 0 degrees, elliptical (0430-530202) | EACH | 2 | $8,000.00 | $17,000 | $8,117.55 | $10,300 |
| 0475 | Straight concrete endwalls, single, 0 degrees, round (0430-536100) | EACH | 1 | $9,000.00 | $18,000 | $11,698 | $8,350.00 |
| 0480 | Straight concrete endwalls, triple, 0 degrees, round (0430-536300) | EACH | 1 | $12,000 | $26,000 | $14,105 | $21,000 |
| 0485 | U-endwall with baffles, index 261/430-011, 1:4 slope, 24"pipe (0430-611129) | EACH | 1 | $6,000.00 | $14,000 | $8,933.53 | $4,300.00 |
| 0490 | Pipe filling and plugging- place out of service (0430-830) | CY | 106.80 | $450.00 | $590.00 | $1,093.90 | $724.00 |
| 0495 | PVC pipe for back of sidewalk, non standard diameter (0430-963-2) | LF | 285 | $65.00 | $75.00 | $107.39 | $718.00 |
| 0500 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 1 | $2,800.00 | $2,700.00 | $2,422.63 | $2,100.00 |
| 0505 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 9 | $3,000.00 | $3,000.00 | $3,326.72 | $2,700.00 |
| 0510 | Mitered end section, optional round, 30" CD (0430-982133) | EACH | 4 | $4,500.00 | $4,000.00 | $3,326.72 | $5,000.00 |
| 0515 | Mitered end section, optional round, 36" CD (0430-982138) | EACH | 2 | $5,400.00 | $4,400.00 | $3,954.54 | $6,300.00 |
| 0520 | Mitered end section, optional round, 48" CD (0430-982141) | EACH | 1 | $7,900.00 | $6,000.00 | $6,626.90 | $8,500.00 |
| 0525 | Mitered end section, optional round, 54" CD (0430-982142) | EACH | 1 | $11,000 | $9,800.00 | $6,626.90 | $14,200 |
| 0530 | Mitered end section, optional - elliptical / arch, 18" CD (0430-982625) | EACH | 3 | $3,400.00 | $2,800.00 | $3,014.13 | $2,250.00 |
| 0535 | Mitered end section, optional round, 18" SD (0430-984125) | EACH | 10 | $2,800.00 | $3,000.00 | $2,422.63 | $2,250.00 |
| 0540 | Mitered end section, optional round, 24" SD (0430-984129) | EACH | 7 | $3,000.00 | $3,000.00 | $3,326.72 | $4,600.00 |
| 0545 | Mitered end section , optional round, 36" side drain (0430-984138) | EACH | 4 | $5,400.00 | $6,900.00 | $8,697.86 | $9,500.00 |
| 0550 | Mitered end section , optional round, 48" SD (0430-984141) | EACH | 2 | $8,000.00 | $6,000.00 | $8,697.86 | $15,000 |
| 0555 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 11 | $3,400.00 | $2,900.00 | $3,014.13 | $2,300.00 |
| 0560 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 2 | $3,800.00 | $4,500.00 | $3,014.13 | $4,500.00 |
| 0565 | Mitered end sect, optional /ellip/arch, 30" SD (0430-984633) | EACH | 12 | $4,200.00 | $5,300.00 | $3,014.13 | $6,000.00 |
| 0570 | Sheet piling steel, F&I (0455-133-3) | SF | 20,524 | $45.00 | $34.00 | $78.66 | $74.00 |
| 0575 | Pipe handrail - guiderail, aluminum (0515-1-2) | LF | 1,524 | $65.00 | $75.00 | $60.88 | $53.00 |
| 0580 | Concrete curb & gutter, type E (0520-1-7) | LF | 22,449 | $26.50 | $36.00 | $28.19 | $36.00 |
| 0585 | Concrete curb & gutter, type F (0520-1-10) | LF | 10,433 | $26.50 | $38.00 | $27.45 | $37.00 |
| 0590 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 765 | $103.00 | $125.00 | $111.30 | $92.00 |
| 0595 | Concrete traffic separator, special- variable width (0520-70) | SY | 4,454 | $145.00 | $150.00 | $163.24 | $148.00 |
| 0600 | Shoulder concrete barrier, curb and gutter barrier (0521-72-43) | LF | 40 | $280.00 | $440.00 | $326.49 | $471.00 |
| 0605 | Shoulder concrete barrier, 32" F-shape (0521-72108) | LF | 34 | $650.00 | $560.00 | $1,054.33 | $706.00 |
| 0610 | Concrete sidewalk and driveways, 4" thick (0522-1) | SY | 17,463 | $62.00 | $74.00 | $89.05 | $71.00 |
| 0615 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 4,894 | $90.00 | $94.00 | $106.87 | $85.00 |
| 0620 | Concrete ditch pavt, non reinforced, 3" (0524-1-1) | SY | 5,040 | $77.00 | $84.00 | $89.05 | $89.00 |
| 0625 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 128 | $190.00 | $220.00 | $274.55 | $174.00 |
| 0630 | Detectable warnings (0527-2) | SF | 2,225 | $25.00 | $27.00 | $29.84 | $97.00 |
| 0635 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 36.50 | $180.00 | $280.00 | $185.50 | $259.00 |
| 0640 | Bedding stone (0530-74) | TN | 26.30 | $190.00 | $190.00 | $134.81 | $335.00 |
| 0645 | Guardrail -roadway, general (0536-1-1) | LF | 43 | $85.00 | $34.00 | $38.20 | $32.00 |
| 0650 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 1 | $2,800.00 | $2,900.00 | $3,264.52 | $2,736.00 |
| 0655 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,000.00 | $3,100.00 | $3,401.72 | $2,870.00 |
| 0660 | Performance turf, sod (0570-1-2) | SY | 127,502 | $3.50 | $5.05 | $3.40 | $6.00 |
| 0665 | Raised pavement marker, type B (0706-1-3) | EACH | 15,755 | $4.00 | $4.00 | $4.48 | $3.85 |
| 0670 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 44.73 | $1,475.00 | $1,600.00 | $1,730.71 | $1,490.00 |
| 0675 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.21 | $2,000.00 | $1,500.00 | $1,790.38 | $1,470.00 |
| 0680 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 4,375 | $2.60 | $2.70 | $2.98 | $2.55 |
| 0685 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 2,434 | $2.75 | $2.95 | $3.28 | $2.85 |
| 0690 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 12.46 | $760.00 | $800.00 | $895.19 | $766.00 |
| 0695 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 2.71 | $800.00 | $800.00 | $895.19 | $766.00 |
| 0700 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 4 | $60.00 | $59.00 | $65.65 | $57.00 |
| 0705 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 419 | $35.00 | $38.00 | $41.78 | $35.80 |
| 0710 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 19.96 | $1,520.00 | $1,600.00 | $1,790.38 | $1,550.00 |
| 0715 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 1,755 | $3.00 | $2.95 | $3.28 | $2.85 |
| 0720 | Painted pavement markings, standard, yellow, skip, 6" (0710-11231) | GM | 0.09 | $1,500.00 | $1,400.00 | $1,551.66 | $1,320.00 |
| 0725 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.09 | $1,000.00 | $800.00 | $895.19 | $758.00 |
| 0730 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0735 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 108 | $630.00 | $670.00 | $596.79 | $500.00 |
| 0740 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 82 | $1,850.00 | $2,000.00 | $2,387.17 | $2,000.00 |
| 0745 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 4 | $2,300.00 | $2,400.00 | $2,864.61 | $2,400.00 |
| 0750 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $100.00 | $96.00 | $179.04 | $150.00 |
| 0755 | Single column ground sign assembly, remove (0700-1600) | EACH | 181 | $60.00 | $59.00 | $59.68 | $50.00 |
| 0760 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 7 | $1,450.00 | $1,600.00 | $3,580.76 | $3,000.00 |
| 0765 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 1 | $1,000.00 | $800.00 | $1,223.42 | $1,025.00 |
| 0767 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 5 | $8,439.00 | $9,200.00 | $10,072 | $9,300.00 |
| 0768 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 3 | $11,540 | $13,000 | $13,774 | $12,700 |
| 0770 | Overhead static sign furnish & install, cantilever, 50 FT (0700-4114) | EACH | 3 | $170,000 | $190,000 | $298,397 | $187,000 |
| 0775 | Overhead static sign furnish & install, span, 101-150 (0700-4126) | EACH | 1 | $357,000 | $390,000 | $477,435 | $393,000 |
| 0780 | Overhead static sign deep foundation removal, cantilever (0700-4612) | EACH | 3 | $12,000 | $13,000 | $14,323 | $13,250 |
| 0785 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 43 | $85.00 | $91.00 | $89.52 | $75.00 |
| 0790 | Tubular marker, 36" yellow (0704-1-4) | EACH | 39 | $210.00 | $210.00 | $179.04 | $150.00 |
| 0795 | Object marker, type 1 (0705-10-1) | EACH | 6 | $420.00 | $430.00 | $298.40 | $409.00 |
| 0800 | Raised pavement marker, type B (0706-1-3) | EACH | 4,503 | $5.00 | $5.35 | $5.97 | $5.15 |
| 0805 | Painted pavement markings, standard, white, island nose (0710-11190) | SF | 14 | $15.00 | $11.00 | $11.94 | $10.30 |
| 0810 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 334 | $6.00 | $5.35 | $5.97 | $5.15 |
| 0815 | Painted pavement markings, surface (0710-90) | LS | 1 | $110,000 | $110,000 | $125,327 | $102,000 |
| 0820 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 9,106 | $5.00 | $5.10 | $5.67 | $4.90 |
| 0825 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 2,003 | $5.30 | $5.65 | $6.27 | $5.40 |
| 0830 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 1,690 | $7.00 | $7.30 | $8.14 | $7.00 |
| 0835 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 2.43 | $4,000.00 | $4,100.00 | $4,595.32 | $3,920.00 |
| 0840 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 31 | $250.00 | $270.00 | $298.40 | $256.00 |
| 0845 | Thermoplastic, standard, arrow (0711-11170) | EACH | 388 | $85.00 | $97.00 | $107.42 | $92.00 |
| 0850 | Thermoplastic, standard, yield line (0711-11180) | LF | 51 | $20.00 | $20.00 | $21.78 | $19.00 |
| 0855 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 1,094 | $5.50 | $5.90 | $6.57 | $5.70 |
| 0860 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.27 | $4,000.00 | $4,100.00 | $4,595.32 | $4,000.00 |
| 0865 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 3,935 | $11.60 | $12.00 | $13.73 | $11.80 |
| 0870 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 73 | $150.00 | $160.00 | $179.04 | $154.00 |
| 0875 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 73 | $110.00 | $110.00 | $119.35 | $103.00 |
| 0880 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 21.59 | $5,150.00 | $5,500.00 | $6,087.29 | $5,210.00 |
| 0885 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 2.19 | $7,100.00 | $7,500.00 | $8,355.10 | $7,200.00 |
| 0890 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 16.01 | $1,700.00 | $1,800.00 | $2,058.94 | $1,800.00 |
| 0895 | Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133) | GM | 0.08 | $13,000 | $13,000 | $14,920 | $12,000 |
| 0900 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 10.23 | $5,150.00 | $5,500.00 | $6,146.97 | $5,300.00 |
| 0905 | Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202) | GM | 0.03 | $13,000 | $13,000 | $14,920 | $13,000 |
| 0910 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.25 | $2,300.00 | $2,100.00 | $2,387.17 | $2,050.00 |
| 0915 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 344 | $5.00 | $5.35 | $5.97 | $5.15 |
| 0920 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.22 | $46,000 | $47,000 | $53,711 | $45,000 |
| 0925 | Permanent tape, white, solid, 8" exit lane at interchange on concrete pavement (0713-103102) | GM | 0.69 | $50,000 | $52,000 | $57,889 | $49,500 |
| 0930 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.27 | $18,000 | $16,000 | $17,904 | $15,100 |
| 0935 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.22 | $45,000 | $47,000 | $53,711 | $45,000 |
| 0940 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.27 | $18,000 | $16,000 | $17,904 | $15,200 |
| 0945 | Conduit, furnish & install, open trench (0630-2-11) | LF | 3,627 | $16.00 | $17.00 | $19.10 | $17.70 |
| 0950 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 2,886 | $22.22 | $24.00 | $26.52 | $25.00 |
| 0955 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 54 | $1,067.00 | $1,200.00 | $1,273.16 | $1,200.00 |
| 0960 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 2 | $4,400.00 | $4,800.00 | $5,251.78 | $4,900.00 |
| 0965 | Prestressed concrete pole, type P-II pedestal (0641-2-11) | EACH | 2 | $2,000.00 | $2,200.00 | $2,387.17 | $2,210.00 |
| 0970 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 23,067 | $3.34 | $3.65 | $3.97 | $3.70 |
| 0975 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 2 | $19,200 | $21,000 | $22,917 | $21,200 |
| 0980 | Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211) | EACH | 88 | $1,434.00 | $1,600.00 | $1,710.81 | $1,600.00 |
| 0985 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 8' arm length (0715-61311) | EACH | 37 | $10,534 | $11,500 | $12,572 | $11,600 |
| 0990 | Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352) | EACH | 4 | $10,667 | $12,000 | $12,732 | $12,000 |
| 0995 | Light pole complete, relocate (0715-68000) | EACH | 1 | $5,334.00 | $5,800.00 | $6,365.80 | $5,900.00 |
| 1000 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 11 | $2,667.00 | $2,900.00 | $3,182.91 | $2,950.00 |
| 1005 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 129 | $867.00 | $950.00 | $1,034.44 | $955.00 |
| 1010 | Conduit, furnish & install, open trench (0630-2-11) | LF | 2,518 | $16.00 | $17.00 | $19.10 | $17.70 |
| 1015 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 5,383 | $34.44 | $38.00 | $41.11 | $38.00 |
| 1020 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 6 | $10,667 | $12,000 | $12,732 | $12,000 |
| 1025 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 179 | $1,067.00 | $1,200.00 | $1,273.16 | $1,200.00 |
| 1030 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 1 | $2,400.00 | $2,600.00 | $2,864.61 | $2,650.00 |
| 1035 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,400.00 | $4,800.00 | $5,251.78 | $4,900.00 |
| 1040 | Electrical service wire, & install (0639-2-1) | LF | 90 | $4.00 | $4.35 | $4.77 | $4.45 |
| 1045 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,000.00 | $2,200.00 | $2,387.17 | $2,210.00 |
| 1050 | Prestressed concrete pole, complete pole removal- pole 30' and greater (0641-2-80) | EACH | 2 | $7,334.00 | $8,000.00 | $8,752.97 | $8,100.00 |
| 1055 | Aluminum signals pole, (0646-1-11) | EACH | 36 | $2,134.00 | $2,300.00 | $2,546.32 | $2,400.00 |
| 1060 | Aluminum signals pole, remove (0646-1-60) | EACH | 22 | $134.00 | $150.00 | $159.14 | $147.00 |
| 1065 | Steel mast arm assembly, and install, single arm 40' (0649-21-3) | EACH | 1 | $73,894 | $81,000 | $88,198 | $81,300 |
| 1070 | Steel mast arm assembly, and install, single arm 50' (0649-21-6) | EACH | 3 | $84,637 | $92,000 | $101,022 | $93,400 |
| 1075 | Steel mast arm assembly, and install, double arm 50'-40' (0649-21-8) | EACH | 1 | $100,156 | $110,000 | $119,545 | $111,000 |
| 1080 | Steel mast arm assembly, and install, single arm 70' (0649-21-15) | EACH | 4 | $91,832 | $100,000 | $109,610 | $102,000 |
| 1085 | Steel mast arm assembly, and install, single arm 78' (0649-21-21) | EACH | 5 | $110,630 | $120,000 | $132,047 | $122,000 |
| 1090 | Steel mast arm assembly, and install, double arm 78'-50' (0649-21-24) | EACH | 1 | $131,014 | $140,000 | $156,376 | $144,300 |
| 1095 | Steel mast arm assembly, and install on existing foundation, single arm 60' (0649-22-10) | EACH | 1 | $43,469 | $47,000 | $51,884 | $48,000 |
| 1100 | Steel mast arm assembly, install/relocate to existing foundation (0649-23-1) | EACH | 1 | $6,667.00 | $7,300.00 | $7,957.64 | $7,350.00 |
| 1105 | Steel mast arm assembly, remove, pole only- entire foundation remains (0649-26-1) | EACH | 1 | $6,667.00 | $7,300.00 | $7,957.64 | $7,350.00 |
| 1110 | Steel mast arm assembly, remove, deep foundation- bolt on attachment (0649-26-5) | EACH | 9 | $12,000 | $13,000 | $14,323 | $13,300 |
| 1115 | Steel mast arm assembly, remove, remove arm and attachments; pole remains (0649-26-7) | EACH | 1 | $4,667.00 | $5,100.00 | $5,570.08 | $5,200.00 |
| 1120 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 66 | $1,558.00 | $1,700.00 | $1,858.98 | $1,750.00 |
| 1125 | Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36) | AS | 5 | $1,826.00 | $2,000.00 | $2,178.91 | $2,010.00 |
| 1130 | Vehicular traffic signal, furnish & install 5 section straight, 1 way (0650-1-38) | AS | 3 | $2,017.00 | $2,200.00 | $2,408.00 | $2,250.00 |
| 1135 | Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70) | AS | 1 | $667.00 | $730.00 | $795.72 | $735.00 |
| 1140 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 30 | $1,021.00 | $1,100.00 | $1,218.19 | $1,140.00 |
| 1145 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 6 | $1,870.00 | $2,000.00 | $2,232.15 | $2,100.00 |
| 1150 | Loop detector inductive, F&I, type 9 (0660-1109) | EACH | 60 | $314.00 | $340.00 | $375.25 | $346.00 |
| 1155 | Loop detector inductive, F&I, type 11, 4 CH, SS, RM (0660-1111) | EACH | 4 | $314.00 | $340.00 | $375.25 | $346.00 |
| 1160 | Loop assembly, F&I, type B (0660-2102) | AS | 94 | $1,296.00 | $1,400.00 | $1,546.89 | $1,430.00 |
| 1165 | Loop assembly, F&I, type F (0660-2106) | AS | 87 | $1,648.00 | $1,800.00 | $1,966.23 | $1,820.00 |
| 1170 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $10,798 | $12,000 | $12,888 | $11,900 |
| 1175 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $8,638.00 | $9,400.00 | $10,311 | $9,520.00 |
| 1180 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 42 | $360.00 | $390.00 | $429.69 | $397.00 |
| 1185 | Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161) | AS | 1 | $35,780 | $39,000 | $42,707 | $39,700 |
| 1190 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $667.00 | $730.00 | $795.72 | $735.00 |
| 1195 | Traffic controller, modify (0671-2-40) | EACH | 2 | $1,334.00 | $1,500.00 | $1,591.45 | $1,470.00 |
| 1200 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $9,127.00 | $10,000 | $10,893 | $10,200 |
| 1205 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $12,667 | $14,000 | $15,119 | $14,000 |
| 1210 | Remote power management rpmu, furnish and install (0685-2-1) | EACH | 1 | $847.00 | $930.00 | $1,010.57 | $932.00 |
| 1212 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 8 | $2,987.00 | $3,300.00 | $3,564.85 | $3,300.00 |
| 1213 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 8 | $2,326.00 | $2,500.00 | $2,775.49 | $2,600.00 |
| 1215 | Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201) | EACH | 6 | $944.00 | $1,000.00 | $1,127.14 | $1,050.00 |
| 1220 | Internally illuminated sign, furnish & install overhead mount, UP to 12 SF (0700-5-21) | EACH | 5 | $4,316.00 | $4,700.00 | $5,151.52 | $4,800.00 |
| 1225 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 10 | $4,900.00 | $5,400.00 | $5,846.99 | $5,400.00 |
| 1230 | Internally illuminated sign, relocate (0700-5-50) | EACH | 4 | $2,427.00 | $2,700.00 | $2,896.44 | $2,700.00 |
| 1245 | Valve boxes, adjust (0425-6) | EACH | 50 | $590.00 | $720.00 | $1,790.38 | $830.00 |
| 1250 | Meter boxes, adjust (0425-6-1) | EACH | 8 | $685.00 | $720.00 | $1,790.38 | $801.00 |
| 1255 | Utility pipe,remove & dispose, 5- 7.9" (1050-16003) | LF | 540 | $26.00 | $13.00 | $11.94 | $75.00 |
| 1260 | Utility pipe,remove & dispose, 8- 19.9" (1050-16004) | LF | 10,700 | $28.00 | $23.00 | $42.37 | $82.00 |
| 1265 | Utility pipe,remove & dispose, 49.9" (1050-16005) | LF | 360 | $33.00 | $37.00 | $90.12 | $105.00 |
| 1270 | Utility pipe,plug & place out of service, 5- 7.9" (1050-18003) | LF | 1,000 | $17.00 | $25.00 | $50.73 | $42.00 |
| 1275 | Utility pipe,plug & place out of service, 8-19.9" (1050-18004) | LF | 1,440 | $46.00 | $15.00 | $58.19 | $45.00 |
| 1280 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31202) | LF | 160 | $74.00 | $110.00 | $26.86 | $121.00 |
| 1285 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31204) | LF | 60 | $120.00 | $130.00 | $35.81 | $254.00 |
| 1290 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31206) | LF | 260 | $135.00 | $150.00 | $42.37 | $210.00 |
| 1295 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, (1050-31208) | LF | 40 | $134.00 | $93.00 | $50.73 | $220.00 |
| 1300 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 12" (1050-31212) | LF | 5,200 | $125.50 | $118.50 | $77.59 | $182.00 |
| 1305 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 16" (1050-31216) | LF | 7,260 | $140.00 | $113.75 | $96.09 | $188.00 |
| 1310 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 20" (1050-31220) | LF | 2,000 | $180.00 | $110.00 | $116.97 | $225.00 |
| 1315 | Utility pipe- poly vinyl chloride, furnish & install, water/sewer, 30" (1050-31230) | LF | 4,820 | $252.00 | $170.00 | $352.40 | $333.00 |
| 1320 | Utility pipe- steel, furnish & install, casing, 30" (1050-61130) | LF | 200 | $840.00 | $940.00 | $830.55 | $1,200.00 |
| 1325 | Utility pipe- steel, furnish & install, casing, 36" (1050-61136) | LF | 220 | $924.00 | $1,400.00 | $1,317.42 | $1,300.00 |
| 1330 | Utility fittings, ductile iron, furnish & install elbow, 8" (1055-51108) | EACH | 2 | $3,000.00 | $1,100.00 | $1,044.39 | $1,800.00 |
| 1335 | Utility fittings, ductile iron, furnish & install elbow, (1055-51112) | EACH | 45 | $2,300.00 | $2,000.00 | $3,282.36 | $2,900.00 |
| 1340 | Utility fittings, ductile iron, furnish & install elbow, (1055-51116) | EACH | 60 | $5,456.00 | $2,600.00 | $5,072.74 | $5,000.00 |
| 1345 | Utility fittings, ductile iron, furnish & install elbow, (1055-51120) | EACH | 32 | $6,252.00 | $3,700.00 | $8,951.91 | $7,000.00 |
| 1350 | Utility fittings, ductile iron, furnish & install elbow, (1055-51130) | EACH | 18 | $12,766 | $11,000 | $22,391 | $13,800 |
| 1355 | Utility fittings, ductile iron, furnish & install tee, 12" (1055-51212) | EACH | 9 | $2,512.00 | $1,900.00 | $3,759.81 | $2,780.00 |
| 1360 | Utility fittings, ductile iron, furnish & install tee, 16" (1055-51216) | EACH | 6 | $7,035.00 | $5,100.00 | $8,696.06 | $6,500.00 |
| 1365 | Utility fittings, ductile iron, furnish & install tee, 30" (1055-51230) | EACH | 4 | $18,558 | $17,000 | $26,839 | $36,000 |
| 1370 | Utility fittings, ductile iron, furnish & install reducer, 8" (1055-51308) | EACH | 2 | $1,285.00 | $1,100.00 | $1,133.90 | $910.00 |
| 1375 | Utility fittings, ductile iron, furnish & install reducer, 12" (1055-51312) | EACH | 2 | $2,282.00 | $1,600.00 | $6,267.24 | $2,240.00 |
| 1380 | Utility fittings, ductile iron, furnish & install reducer, 16" (1055-51316) | EACH | 2 | $4,553.00 | $1,300.00 | $5,939.11 | $4,000.00 |
| 1385 | Utility fittings, ductile iron, furnish & install, 8" (1055-51508) | EACH | 4 | $410.00 | $290.00 | $6,564.73 | $500.00 |
| 1390 | Utility fittings, ductile iron, furnish & install, 12" (1055-51512) | EACH | 16 | $780.00 | $940.00 | $7,758.31 | $980.00 |
| 1395 | Utility fittings, ductile iron, furnish & install, 16" (1055-51516) | EACH | 16 | $1,890.00 | $1,600.00 | $8,951.91 | $1,800.00 |
| 1400 | Utility fittings, ductile iron, furnish & install, 20" (1055-51520) | EACH | 2 | $3,172.00 | $1,700.00 | $10,146 | $3,000.00 |
| 1405 | Utility fittings, ductile iron, furnish & install cap/plug, 30" (1055-51530) | EACH | 2 | $7,046.00 | $5,700.00 | $11,339 | $6,500.00 |
| 1410 | Utility fixture- tapping saddle/sleeve, furnish & 2" (1080-23102) | EACH | 14 | $1,264.00 | $1,400.00 | $5,371.14 | $1,750.00 |
| 1415 | Utility fixture- tapping saddle/sleeve, furnish & 4" (1080-23104) | EACH | 3 | $1,406.00 | $2,700.00 | $10,146 | $2,700.00 |
| 1420 | Utility fixture- tapping saddle/sleeve, furnish & 6" (1080-23106) | EACH | 9 | $5,936.00 | $3,200.00 | $12,533 | $4,200.00 |
| 1425 | Utility fixture- tapping saddle/sleeve, furnish & 12" (1080-23112) | EACH | 16 | $7,840.00 | $4,200.00 | $15,338 | $6,500.00 |
| 1430 | Utility fixture- tapping saddle/sleeve, furnish & 16" (1080-23116) | EACH | 17 | $16,530 | $8,300.00 | $34,326 | $15,500 |
| 1435 | Utility fixture- tapping saddle/sleeve, furnish & 20" (1080-23120) | EACH | 1 | $22,400 | $38,000 | $101,915 | $21,000 |
| 1440 | Utility fixture, valve assembly, furnish and install, 2" (1080-24102) | EACH | 10 | $1,200.00 | $1,900.00 | $7,758.31 | $1,750.00 |
| 1445 | Utility fixture, valve assembly, furnish and install, 4" (1080-24104) | EACH | 6 | $3,775.00 | $6,200.00 | $8,951.91 | $2,100.00 |
| 1450 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 22 | $5,158.00 | $5,900.00 | $11,339 | $3,800.00 |
| 1455 | Utility fixture, valve assembly, furnish and install, 12" (1080-24112) | EACH | 32 | $16,563 | $16,000 | $20,888 | $11,000 |
| 1460 | Utility fixture, valve assembly, furnish and install, 16" (1080-24116) | EACH | 33 | $40,650 | $33,000 | $17,733 | $22,300 |
| 1465 | Utility fixture, valve assembly, furnish and install, 20" (1080-24120) | EACH | 3 | $42,290 | $21,000 | $53,920 | $22,000 |
| 1470 | Utility fixture, valve assembly, furnish and install, 30" (1080-24130) | EACH | 6 | $86,043 | $44,000 | $81,325 | $59,000 |
| 1475 | Utility fixture, vac/air furnish & install 2" (1080-26102) | EACH | 11 | $5,417.00 | $13,000 | $10,439 | $7,400.00 |
| 1480 | Utility fixture, vac/air furnish & install 6" (1080-26106) | EACH | 3 | $39,245 | $17,000 | $33,272 | $29,000 |
| 1485 | Utility fixture, mechanical restraint, furnish & install, 6" (1080-29106) | EACH | 10 | $1,523.00 | $590.00 | $537.11 | $845.00 |
| 1490 | Utility fixture, mechanical restraint, furnish & install, 8" (1080-29108) | EACH | 2 | $1,982.00 | $270.00 | $775.83 | $905.00 |
| 1495 | Utility fixture, mechanical restraint, furnish & install, 12" (1080-29112) | EACH | 40 | $2,073.00 | $1,100.00 | $1,253.26 | $1,100.00 |
| 1500 | Utility fixture, mechanical restraint, furnish & install, 16" (1080-29116) | EACH | 45 | $2,840.00 | $1,500.00 | $1,790.38 | $1,650.00 |
| 1505 | Utility fixture, mechanical restraint, furnish & install, 20" (1080-29120) | EACH | 32 | $3,975.00 | $1,800.00 | $2,088.78 | $2,000.00 |
| 1510 | Fire hydrant, F&I, standard, 2 hose, 1PUMPER, 6" (1644-113-08) | EACH | 6 | $11,242 | $7,700.00 | $7,758.31 | $8,700.00 |
| 1515 | Fire hydrant, remove (1644-900) | EACH | 7 | $700.00 | $1,500.00 | $2,983.97 | $1,200.00 |
| 1520 | Existing ITS maintenance (0102-112) | DA | 1,500 | $121.05 | $130.00 | $144.48 | $175.00 |
| 1525 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 2.70 | $4,105.00 | $4,500.00 | $4,899.99 | $4,520.00 |
| 1530 | Itsfm location documentation- intersection (0611-2-1) | EACH | 7 | $2,800.00 | $3,100.00 | $3,342.04 | $3,100.00 |
| 1535 | Itsfm location documentation- ITS site (0611-2-2) | EACH | 1 | $2,053.00 | $2,200.00 | $2,449.99 | $2,300.00 |
| 1540 | Conduit, furnish & install, open trench (0630-2-11) | LF | 7,481 | $21.33 | $23.00 | $25.46 | $24.00 |
| 1545 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 7,121 | $35.56 | $39.00 | $42.45 | $40.00 |
| 1550 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 120 | $26.00 | $28.00 | $30.23 | $28.00 |
| 1555 | Conduit, furnish & install, split duct (0630-2-18) | LF | 56 | $76.00 | $83.00 | $90.72 | $84.00 |
| 1560 | Fiber optic cable, F&I, underground,2-12 fibers (0633-1121) | LF | 1,759 | $4.50 | $4.90 | $5.34 | $4.95 |
| 1565 | Fiber optic cable, F&I, underground, 241 - 288 fibers (0633-1127) | LF | 17,313 | $7.35 | $8.00 | $8.74 | $8.10 |
| 1570 | Fiber optic cable, relocate, underground (0633-1420) | LF | 2,001 | $3.16 | $3.45 | $3.77 | $3.50 |
| 1575 | Fiber optic cable, remove, underground (0633-1620) | LF | 14,583 | $1.32 | $1.45 | $1.58 | $1.50 |
| 1580 | Fiber optic connection, install, splice (0633-2-31) | EACH | 697 | $52.63 | $58.00 | $62.82 | $58.00 |
| 1585 | Fiber optic connection hardware, F&I, splice (0633-3-11) | EACH | 6 | $1,458.00 | $1,600.00 | $1,740.13 | $1,610.00 |
| 1590 | Fiber optic connection hardware, F&I, splice tray (0633-3-12) | EACH | 37 | $52.63 | $58.00 | $62.82 | $58.00 |
| 1595 | Fiber optic connection hardware, F&I, preterminated connector assembly (0633-3-13) | EACH | 7 | $563.00 | $620.00 | $672.18 | $620.00 |
| 1600 | Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14) | EACH | 7 | $100.00 | $110.00 | $119.35 | $111.00 |
| 1605 | Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16) | EACH | 7 | $1,321.00 | $1,400.00 | $1,576.79 | $1,500.00 |
| 1610 | Fiber optic cable locator (0633-6) | DA | 1,500 | $131.60 | $140.00 | $157.05 | $175.00 |
| 1615 | Multi-conductor cable, remove (0633-8-6) | LF | 1,558 | $1.00 | $1.10 | $1.19 | $1.15 |
| 1620 | Multi-conductor cable, furnish & install, cat 6 (0633-8-11) | LF | 2,341 | $4.00 | $4.35 | $4.77 | $4.45 |
| 1625 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 24 | $1,067.00 | $1,200.00 | $1,273.16 | $1,200.00 |
| 1630 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 31 | $2,400.00 | $2,600.00 | $2,864.61 | $2,650.00 |
| 1635 | Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13) | EACH | 6 | $5,200.00 | $5,700.00 | $6,206.65 | $5,800.00 |
| 1640 | Electrical service wire, & install (0639-2-1) | LF | 1,051 | $4.00 | $4.35 | $4.77 | $4.45 |
| 1645 | Electrical service wire, (0639-2-6) | LF | 763 | $0.67 | $0.75 | $0.80 | $0.75 |
| 1650 | Vehicle detection system- avi, remove complete system (0660-6600) | EACH | 2 | $527.00 | $580.00 | $628.21 | $580.00 |
| 1655 | ITS CCTV camera, non- pressurized, IP, high definition (0682-1173) | EACH | 1 | $7,332.00 | $8,000.00 | $8,750.87 | $8,100.00 |
| 1660 | ITS CCTV camera, relocate (0682-1400) | EACH | 6 | $2,316.00 | $2,500.00 | $2,764.10 | $2,600.00 |
| 1665 | ITS CCTV camera, remove & disposal (0682-1600) | EACH | 1 | $395.00 | $430.00 | $471.04 | $435.00 |
| 1670 | Connected vehicle roadside equipment, rsu (0924-681-1) | EACH | 1 | $10,521 | $11,000 | $12,558 | $11,600 |
| 1675 | Connected vehicle roadside equipment, industrial computer (0924-681-2) | EACH | 1 | $15,526 | $17,000 | $18,532 | $17,100 |
| 1680 | Connected vehicle roadside equipment, rsu, relocate (0924-681-4) | EACH | 8 | $2,364.00 | $2,600.00 | $2,820.63 | $2,600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of March 31, 2026. Compiled by Mirage Metrics.