Anderson Columbia Co., Inc.: FDOT bid record

Anderson Columbia Co., Inc. submitted 332 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 179 of them (54%). When it was not low, its total sat a median +13% above the low bid.

Owner
Florida DOT
Low bid volume
$1,671,401,847
Latest bid
28 OCT 2026
Data through
28 OCT 2026
332Bids
179Low bids
54Win rate, percent
+13%Median gap to the low bid when not low, 153 bids

By year

YearBidsLow bidsWin rate
2018421433%
2019311445%
2020301550%
2021271867%
2022433377%
2023392462%
2024371746%
2025382155%
2026452351%
Anderson Columbia Co., Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 21559763%
District 31547146%
District 5211048%
StateWide11100%
District 7100%
Anderson Columbia Co., Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Performance turf, sod0570-1-2SY270106 (39%)$3.52$5.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED28591 (32%)$0.13$0.13
Type B stabilization0160-4SY21085 (40%)$12.00$15.00
Asphalt concrete friction course,traffic C, FC-12.5, PG0337-7-83TN13580 (59%)$145.04$185.00
Mowing0107-2ACRE23975 (31%)$60.00$80.65
Sediment barrier0104-10-3LF27874 (27%)$3.84$2.60
Optional base, base group 010285-701SY17373 (42%)$18.00$24.00
Work zone sign0102-60ED28870 (24%)$0.30$0.25
Superpave asphaltic concrete, traffic C, PG76-220334-1-53TN14669 (47%)$144.39$169.18
Inlet protection system0104-18EACH21967 (31%)$205.99$150.00
Asphalt concrete friction course, inc bit, FC-5, PG 76-220337-7-25TN8864 (73%)$159.78$200.00
Portable changeable message sign, temporary0102-99ED28357 (20%)$14.00$12.00
Anderson Columbia Co., Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Anderson Columbia Co., Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T2A84District 2SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA1 of 7$9,234,345Low, 7.0% under the second
28 OCT 2026T2A86District 2SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT2 of 8$8,733,923+3.0%
28 OCT 2026T2B08District 2SR 247 (BRANFORD HWY) FROM SUWANNEE COUNTY LINE TO SR 93 (I-75)1 of 1$9,669,929Low
28 OCT 2026T3970District 3HANNA MILL POND RD OVER HANNA POND BRIDGE NO 5040435 of 5$6,040,768+15%
28 OCT 2026T3A08District 3SR 2 FROM SPRING BRANCH TO E OF COWARTS CREEK BRIDGE1 of 5$1,651,142Low, 12% under the second
28 OCT 2026T3A21District 3SR 75 (US 231) FROM S OF SR 20 TO JACKSON COUNTY LINE1 of 3$10,229,700Low, 12% under the second
28 OCT 2026T3A25District 3SR 8 (I-10) FROM MILLER BLUFF RD TO OKALOOSA COUNTY LINE1 of 3$14,321,626Low, 8.0% under the second
30 SEP 2026T2A79District 2SR 25 (US 41) FROM N OF SR 8 (I-10) TO HAMILTON CO LINE1 of 1$5,638,495Low
30 SEP 2026T2A80District 2SR 55 (US 19) FROM N OF SR 121 TO S OF OTTER CREEK AND AT BULLFROG1 of 3$19,095,716Low, 8.0% under the second
30 SEP 2026T2A81District 2SR 20 (US 27) FROM SJ TOM MOORE AVE TO END OF 4-LANE1 of 3$3,421,662Low, 21% under the second
30 SEP 2026T3908District 3SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 4644234 of 5$3,324,160+26%
30 SEP 2026T3937District 3CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 5300262 of 4$9,343,927+24%
30 SEP 2026T3A23District 3SR 75 (US 231) FROM S OF SR 10 (US 90) TO END OF CURB AND GUTTER2 of 3$2,040,118+3.0%
26 AUG 2026T2A69District 2SR 45 (US 27 / US 41) FROM SR 24 (ARCHER RD) TO S OF SR 26 (W NEWBERRY2 of 4$5,918,117+5.0%
26 AUG 2026T2A77District 2SR 53 (DUVAL AVE) FROM S OF SR 8 (I-10) TO LIVINGSTON ST2 of 3$5,732,287+2.0%
26 AUG 2026T3998District 3SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO1 of 3$4,722,952Low, 10% under the second
26 AUG 2026T3A32District 3SR 10 (US 90) FROM END OF 4 LANE IN GRAND RIDGE TO APALACHICOLA RIVER1 of 5$4,806,184Low, 10% under the second
29 JUL 2026T2A29District 2SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER3 of 4$9,531,450+9.0%
29 JUL 2026T2A40District 2208366452011 of 2$7,938,321Low, 26% under the second
29 JUL 2026T3A03District 3SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK1 of 5$1,539,585Low, 1.0% under the second
29 JUL 2026T3A04District 3SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE3 of 5$9,612,975+14%
10 JUN 2026T2A50District 2SR 55 (US 19) AT NW MAIN ST AND AT USHER CREEK BRIDGE FROM..1 of 3$15,700,535Low, 3.0% under the second
10 JUN 2026T3981District 3CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 5041591 of 3$6,575,327Low, 19% under the second
20 MAY 2026T2A66District 2SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW..3 of 4$2,274,793+6.0%
20 MAY 2026T2A68District 2CR 357 OVER SHIRED CREEK, BRIDGE NO 3000431 of 4$8,739,218Low, 39% under the second
Anderson Columbia Co., Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy