Anderson Columbia Co., Inc.: FDOT bid record
Anderson Columbia Co., Inc. submitted 332 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 28 OCT 2026, and was the low bidder on 179 of them (54%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $1,671,401,847
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 42 | 14 | 33% |
| 2019 | 31 | 14 | 45% |
| 2020 | 30 | 15 | 50% |
| 2021 | 27 | 18 | 67% |
| 2022 | 43 | 33 | 77% |
| 2023 | 39 | 24 | 62% |
| 2024 | 37 | 17 | 46% |
| 2025 | 38 | 21 | 55% |
| 2026 | 45 | 23 | 51% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 155 | 97 | 63% |
| District 3 | 154 | 71 | 46% |
| District 5 | 21 | 10 | 48% |
| StateWide | 1 | 1 | 100% |
| District 7 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Performance turf, sod | 0570-1-2 | SY | 270 | 106 (39%) | $3.52 | $5.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 285 | 91 (32%) | $0.13 | $0.13 |
| Type B stabilization | 0160-4 | SY | 210 | 85 (40%) | $12.00 | $15.00 |
| Asphalt concrete friction course,traffic C, FC-12.5, PG | 0337-7-83 | TN | 135 | 80 (59%) | $145.04 | $185.00 |
| Mowing | 0107-2 | ACRE | 239 | 75 (31%) | $60.00 | $80.65 |
| Sediment barrier | 0104-10-3 | LF | 278 | 74 (27%) | $3.84 | $2.60 |
| Optional base, base group 01 | 0285-701 | SY | 173 | 73 (42%) | $18.00 | $24.00 |
| Work zone sign | 0102-60 | ED | 288 | 70 (24%) | $0.30 | $0.25 |
| Superpave asphaltic concrete, traffic C, PG76-22 | 0334-1-53 | TN | 146 | 69 (47%) | $144.39 | $169.18 |
| Inlet protection system | 0104-18 | EACH | 219 | 67 (31%) | $205.99 | $150.00 |
| Asphalt concrete friction course, inc bit, FC-5, PG 76-22 | 0337-7-25 | TN | 88 | 64 (73%) | $159.78 | $200.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 283 | 57 (20%) | $14.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| C.W. Roberts Contracting, Inc. | 133 | 47 of 133 |
| Preferred Materials Inc. | 79 | 29 of 79 |
| Whitehurst, V. E. & Sons, Inc. | 52 | 17 of 52 |
| Superior Construction Company Southeast, LLC | 36 | 8 of 36 |
| Capital Asphalt Inc | 29 | 3 of 29 |
| Hubbard Construction Company | 26 | 7 of 26 |
| Murphree Bridge Corporation | 26 | 19 of 26 |
| Duval Asphalt Products, Inc. | 25 | 11 of 25 |
| GDB-US Constructors, Inc. | 22 | 5 of 22 |
| Peavy & Son Construction Co., Inc. | 19 | 7 of 19 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T2A84 | District 2 | SR 20 FROM ROWLAND AVE TO S PALM AVE AND FROM SR 19 TO ALABAMA | 1 of 7 | $9,234,345 | Low, 7.0% under the second |
| 28 OCT 2026 | T2A86 | District 2 | SR 100 FROM CLAY COUNTY LINE TO STJOHNS RIVER WATER MANAGEMENT | 2 of 8 | $8,733,923 | +3.0% |
| 28 OCT 2026 | T2B08 | District 2 | SR 247 (BRANFORD HWY) FROM SUWANNEE COUNTY LINE TO SR 93 (I-75) | 1 of 1 | $9,669,929 | Low |
| 28 OCT 2026 | T3970 | District 3 | HANNA MILL POND RD OVER HANNA POND BRIDGE NO 504043 | 5 of 5 | $6,040,768 | +15% |
| 28 OCT 2026 | T3A08 | District 3 | SR 2 FROM SPRING BRANCH TO E OF COWARTS CREEK BRIDGE | 1 of 5 | $1,651,142 | Low, 12% under the second |
| 28 OCT 2026 | T3A21 | District 3 | SR 75 (US 231) FROM S OF SR 20 TO JACKSON COUNTY LINE | 1 of 3 | $10,229,700 | Low, 12% under the second |
| 28 OCT 2026 | T3A25 | District 3 | SR 8 (I-10) FROM MILLER BLUFF RD TO OKALOOSA COUNTY LINE | 1 of 3 | $14,321,626 | Low, 8.0% under the second |
| 30 SEP 2026 | T2A79 | District 2 | SR 25 (US 41) FROM N OF SR 8 (I-10) TO HAMILTON CO LINE | 1 of 1 | $5,638,495 | Low |
| 30 SEP 2026 | T2A80 | District 2 | SR 55 (US 19) FROM N OF SR 121 TO S OF OTTER CREEK AND AT BULLFROG | 1 of 3 | $19,095,716 | Low, 8.0% under the second |
| 30 SEP 2026 | T2A81 | District 2 | SR 20 (US 27) FROM SJ TOM MOORE AVE TO END OF 4-LANE | 1 of 3 | $3,421,662 | Low, 21% under the second |
| 30 SEP 2026 | T3908 | District 3 | SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 464423 | 4 of 5 | $3,324,160 | +26% |
| 30 SEP 2026 | T3937 | District 3 | CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 530026 | 2 of 4 | $9,343,927 | +24% |
| 30 SEP 2026 | T3A23 | District 3 | SR 75 (US 231) FROM S OF SR 10 (US 90) TO END OF CURB AND GUTTER | 2 of 3 | $2,040,118 | +3.0% |
| 26 AUG 2026 | T2A69 | District 2 | SR 45 (US 27 / US 41) FROM SR 24 (ARCHER RD) TO S OF SR 26 (W NEWBERRY | 2 of 4 | $5,918,117 | +5.0% |
| 26 AUG 2026 | T2A77 | District 2 | SR 53 (DUVAL AVE) FROM S OF SR 8 (I-10) TO LIVINGSTON ST | 2 of 3 | $5,732,287 | +2.0% |
| 26 AUG 2026 | T3998 | District 3 | SR 85/20 AND SR 397 FROM WOLVERINE TO EDGE AVE AND FROM SR 190 TO | 1 of 3 | $4,722,952 | Low, 10% under the second |
| 26 AUG 2026 | T3A32 | District 3 | SR 10 (US 90) FROM END OF 4 LANE IN GRAND RIDGE TO APALACHICOLA RIVER | 1 of 5 | $4,806,184 | Low, 10% under the second |
| 29 JUL 2026 | T2A29 | District 2 | SR 228 (NORMANDY BLVD) FROM THE EQUESTRIAN CENTER TO LAMPLIGHTER | 3 of 4 | $9,531,450 | +9.0% |
| 29 JUL 2026 | T2A40 | District 2 | 20836645201 | 1 of 2 | $7,938,321 | Low, 26% under the second |
| 29 JUL 2026 | T3A03 | District 3 | SR 10 (US 90) FROM DUVAL ST TO W OF QUINCY CREEK | 1 of 5 | $1,539,585 | Low, 1.0% under the second |
| 29 JUL 2026 | T3A04 | District 3 | SR 61 (US 319) FROM TIMBERWOLF CROSSING TO GEORGIA STATE LINE | 3 of 5 | $9,612,975 | +14% |
| 10 JUN 2026 | T2A50 | District 2 | SR 55 (US 19) AT NW MAIN ST AND AT USHER CREEK BRIDGE FROM.. | 1 of 3 | $15,700,535 | Low, 3.0% under the second |
| 10 JUN 2026 | T3981 | District 3 | CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 504159 | 1 of 3 | $6,575,327 | Low, 19% under the second |
| 20 MAY 2026 | T2A66 | District 2 | SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW.. | 3 of 4 | $2,274,793 | +6.0% |
| 20 MAY 2026 | T2A68 | District 2 | CR 357 OVER SHIRED CREEK, BRIDGE NO 300043 | 1 of 4 | $8,739,218 | Low, 39% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.