| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $111,006 | $147,984 | $159,085 |
| 0010 | Concrete class II, culverts (0400-2-1) | CY | 366.40 | $2,010.08 | $1,850.87 | $1,990.00 |
| 0015 | Reinforcing steel- roadway (0415-1-1) | LB | 57,289 | $0.54 | $2.05 | $2.20 |
| 0025 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 816 | $46.81 | $149.63 | $160.85 |
| 0030 | Mobilization (0101-1) | LS | 1 | $704,425 | $498,977 | $995,135 |
| 0035 | Mobilization (0101-1) | LS | 1 | $89,767 | $166,719 | $365,525 |
| 0040 | Maintenance of traffic (0102-1) | DA | 1 | $322,925 | $207,392 | $466,065 |
| 0045 | Maintenance of traffic (0102-1) | DA | 1 | $74,825 | $89,112 | $343,861 |
| 0050 | Special detour- temporary pavement (0102-2200) | SY | 1 | $170,486 | $51,406 | $129,500 |
| 0055 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $152,244 | $48,289 | $150,515 |
| 0060 | Pedestrian escort/flagger (0102-5) | HR | 150 | $121.13 | $52.96 | $75.00 |
| 0065 | Traffic control officer (0102-14) | HR | 156 | $115.94 | $100.00 | $125.00 |
| 0070 | Work zone sign (0102-60) | ED | 34,204 | $0.24 | $0.19 | $0.23 |
| 0075 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 4,323 | $41.74 | $36.00 | $38.70 |
| 0080 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 2,195 | $11.59 | $10.00 | $10.75 |
| 0085 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 470,325 | $0.10 | $0.09 | $0.10 |
| 0090 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 497 | $0.74 | $0.10 | $0.69 |
| 0095 | Arrow board / advance warning arrow panel (0102-76) | ED | 7,242 | $5.80 | $5.00 | $5.38 |
| 0100 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $927.51 | $800.00 | $860.00 |
| 0105 | Portable changeable message sign, temporary (0102-99) | ED | 890 | $10.43 | $9.00 | $9.68 |
| 0110 | Temporary signalization and maintenance, intersection (0102-104) | ED | 1,320 | $37.63 | $24.24 | $26.06 |
| 0115 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 1,320 | $24.32 | $17.56 | $18.88 |
| 0120 | Type III barricade (0102-115) | ED | 8,577 | $0.24 | $0.23 | $0.23 |
| 0125 | Portable regulatory, sign (0102-150-1) | ED | 990 | $5.80 | $5.00 | $5.38 |
| 0130 | Radar speed display unit (0102-150-2) | ED | 990 | $5.80 | $5.00 | $5.38 |
| 0135 | Sediment barrier (0104-10-3) | LF | 3,534 | $3.53 | $2.91 | $2.00 |
| 0140 | Floating turbidity barrier (0104-11) | LF | 64 | $18.55 | $38.39 | $50.00 |
| 0145 | Inlet protection system (0104-18) | EACH | 99 | $150.72 | $202.38 | $125.00 |
| 0150 | Litter removal (0107-1) | ACRE | 2,017.95 | $50.00 | $27.00 | $53.75 |
| 0155 | Mowing (0107-2) | ACRE | 2,010.63 | $30.00 | $78.00 | $80.65 |
| 0160 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $66,183 | $11,364 | $40,115 |
| 0165 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $39,710 | $132,569 | $43,000 |
| 0170 | Removal of existing concrete (0110-4-10) | SY | 127 | $54.99 | $60.63 | $65.20 |
| 0175 | Type B stabilization (0160-4) | SY | 1,781 | $2.18 | $11.27 | $17.50 |
| 0180 | Optional base, base group 01 (0285-701) | SY | 2,634 | $8.70 | $18.37 | $20.77 |
| 0185 | Optional base, base group 09 (0285-709) | SY | 1,050 | $29.56 | $63.54 | $20.77 |
| 0190 | Milling existing asphalt pavement, 2" avg depth (0327-70-5) | SY | 328 | $16.60 | $7.01 | $2.66 |
| 0195 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 27,417 | $3.98 | $3.01 | $2.31 |
| 0200 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 40,528 | $4.01 | $3.01 | $3.99 |
| 0205 | Milling existing asphalt pavement, 2 3/4" avg depth (0327-70-15) | SY | 316,305 | $1.84 | $2.26 | $3.17 |
| 0210 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 86,337 | $1.82 | $1.51 | $1.74 |
| 0215 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 41,694.80 | $145.42 | $153.30 | $163.20 |
| 0220 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 16,251.30 | $193.44 | $211.99 | $228.56 |
| 0225 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 4,912.10 | $158.92 | $166.48 | $165.35 |
| 0230 | Inlets, DT bot, type B, <10' (0425-1511) | EACH | 1 | $6,563.40 | $8,882.40 | $9,550.00 |
| 0235 | Manhole, adjust (0425-5) | EACH | 4 | $1,739.10 | $2,102.70 | $2,260.00 |
| 0240 | Valve boxes, adjust (0425-6) | EACH | 2 | $1,159.40 | $1,201.80 | $1,290.00 |
| 0245 | Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21) | LF | 196 | $104.35 | $74.00 | $118.25 |
| 0250 | Concrete curb & gutter, type F (0520-1-10) | LF | 170 | $97.08 | $79.54 | $85.50 |
| 0255 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 79 | $260.47 | $136.25 | $146.50 |
| 0260 | Detectable warnings (0527-2) | SF | 167 | $40.58 | $48.45 | $52.10 |
| 0265 | Riprap, sand-cement bags (0530-1100) | CY | 14 | $1,739.10 | $1,107.00 | $1,190.00 |
| 0270 | Performance turf (0570-1-1) | SY | 15,962 | $0.46 | $1.04 | $0.55 |
| 0275 | Performance turf, sod (0570-1-2) | SY | 86,294 | $2.20 | $2.96 | $2.65 |
| 0280 | Raised pavement marker, type B (0706-1-3) | EACH | 16,486 | $5.51 | $4.75 | $5.11 |
| 0285 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 24.35 | $1,739.10 | $1,500.00 | $1,612.50 |
| 0290 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 3,282 | $2.90 | $2.50 | $2.70 |
| 0295 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 953 | $4.06 | $3.50 | $3.80 |
| 0300 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 21.39 | $869.54 | $750.00 | $806.25 |
| 0305 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.18 | $985.49 | $850.00 | $915.00 |
| 0310 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 21.68 | $1,739.10 | $1,500.00 | $1,612.50 |
| 0315 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 2.24 | $985.49 | $850.00 | $915.00 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $123,020 | $123,020 | $123,020 |
| 0325 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $26,980 | $26,980 | $26,980 |
| 0330 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 41.94 | $2,018.20 | $2,041.46 | $2,120.00 |
| 0335 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 25 | $457.96 | $395.00 | $425.00 |
| 0340 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 2 | $14.87 | $12.83 | $14.00 |
| 0345 | Tubular marker, 36" yellow (0704-1-4) | EACH | 96 | $133.33 | $115.00 | $125.00 |
| 0350 | Object marker, type 2 (0705-10-2) | EACH | 8 | $98.54 | $85.00 | $91.40 |
| 0355 | Raised pavement marker, type B (0706-1-3) | EACH | 10,456 | $5.51 | $4.75 | $5.11 |
| 0360 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 2,414 | $3.48 | $3.00 | $3.23 |
| 0365 | Painted pavement markings, surface (0710-90) | LS | 1 | $115,940 | $100,000 | $107,500 |
| 0370 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,898.50 | $2,500.00 | $2,690.00 |
| 0375 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 3,210 | $4.06 | $4.15 | $4.46 |
| 0380 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 41 | $6.96 | $4.88 | $5.25 |
| 0385 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 939 | $11.01 | $7.25 | $7.80 |
| 0390 | Thermoplastic, standard, message or symbol (0711-11160) | EACH | 6 | $237.68 | $157.50 | $169.50 |
| 0395 | Thermoplastic, standard, arrow (0711-11170) | EACH | 81 | $98.54 | $105.00 | $113.00 |
| 0400 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 184 | $6.96 | $4.88 | $5.25 |
| 0405 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 2.24 | $3,130.37 | $1,890.00 | $2,032.00 |
| 0410 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 819 | $18.84 | $15.75 | $17.00 |
| 0415 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 21.69 | $5,217.30 | $6,090.00 | $6,550.00 |
| 0420 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 21.39 | $1,739.10 | $1,680.00 | $1,806.00 |
| 0425 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 19.55 | $5,217.30 | $6,090.00 | $6,550.00 |
| 0430 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 2.56 | $4,289.77 | $5,250.00 | $5,650.00 |
| 0435 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 3.02 | $1,623.16 | $1,575.00 | $1,695.00 |
| 0440 | Thermoplastic, standard other surfaces, white, 6", 6-10 dotted managed lane marking (0711-16171) | GM | 0.18 | $1,970.98 | $2,625.00 | $2,822.00 |
| 0445 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 3.77 | $3,941.96 | $5,250.00 | $5,650.00 |
| 0450 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.09 | $52,173 | $45,150 | $48,540 |
| 0455 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.07 | $12,753 | $10,500 | $11,288 |
| 0460 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.09 | $52,173 | $45,150 | $48,540 |
| 0465 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.07 | $12,753 | $10,500 | $11,288 |
| 0470 | Conduit, furnish & install, open trench (0630-2-11) | LF | 171 | $23.14 | $17.41 | $18.75 |
| 0475 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 204 | $50.49 | $41.04 | $44.15 |
| 0480 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 712 | $19.30 | $8.07 | $8.70 |
| 0485 | Signal cable, remove- outside intersection (0632-7-7) | LF | 1,020 | $1.82 | $2.00 | $2.15 |
| 0490 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 17 | $1,971.24 | $1,612.96 | $1,735.00 |
| 0495 | Aluminum signals pole, (0646-1-11) | EACH | 5 | $3,649.80 | $2,924.60 | $3,145.00 |
| 0500 | Aluminum signals pole, remove (0646-1-60) | EACH | 3 | $512.42 | $511.95 | $550.00 |
| 0505 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 5 | $1,436.22 | $1,173.85 | $1,262.00 |
| 0510 | Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60) | AS | 2 | $236.32 | $210.87 | $227.00 |
| 0515 | Loop assembly, F&I, type F (0660-2106) | AS | 20 | $2,820.82 | $2,014.90 | $2,166.00 |
| 0520 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 5 | $1,053.49 | $943.64 | $1,015.00 |
| 0525 | Pedestrian detector, remove- pole/pedestal to remain (0665-1-60) | EACH | 2 | $99.26 | $104.61 | $112.50 |