FDOT letting results, June 10, 2026
11 contracts let by Florida DOT on June 10, 2026, $135,430,880 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 11
- Low bids, total
- $135,430,880
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T5884 | SR 400 FROM MP 22.660 TO MP 23.475 | District 5 | 6 | C.W. Roberts Contracting, Inc. | $38,087,832 | $39,757,750 | +4.0% | FDOT |
| T5888 | SR 50 / SR 33 FROM CR 565 (VILLA CITY RD) TO 2ND AVE | District 5 | 8 | C.W. Roberts Contracting, Inc. | $26,833,115 | $27,726,804 | +3.0% | FDOT |
| T7534 | US 41B (N TAMPA ST) AND N FLORIDA AVE FROM JACKSON ST TO... | District 7 | 4 | Preferred Materials Inc. | $23,563,969 | $27,359,685 | +16% | FDOT |
| T2A50 | SR 55 (US 19) AT NW MAIN ST AND AT USHER CREEK BRIDGE FROM.. | District 2 | 3 | Anderson Columbia Co., Inc. | $15,700,535 | $16,175,713 | +3.0% | FDOT |
| T3952 | CR 372 (SURF RD) OVER OTTER CREEK RISE, BRIDGE NO 59069 | District 3 | 2 | RJ Gorman Contracting LLC | $11,973,993 | $11,977,134 | 0.0% | FDOT |
| T3981 | CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 504159 | District 3 | 3 | Anderson Columbia Co., Inc. | $6,575,327 | $7,830,063 | +19% | FDOT |
| T1930 | SR 25/SR 80 (US 27) FROM INDUSTRIAL CANAL TO W SAGAMORE AVE | District 1 | 5 | Ajax Paving Industries of Florida LLC | $4,783,901 | $4,817,252 | +1.0% | FDOT |
| T2A63 | SR 24 (US 441 / SW 13TH ST / MLK JR HWY) AT SR 24 (SW ARCHER | District 2 | 4 | Maer Homes, LLC | $3,393,115 | $3,729,691 | +10% | FDOT |
| T5886 | SR 50 (BROAD ST) FROM 2ND AVE TO SILVER EAGLE RD | District 5 | 9 | DB Civil Construction, LLC | $2,517,370 | $2,745,775 | +9.0% | FDOT |
| T4766 | SR 84 (SE 24TH ST) FROM SW 4TH AVE TO SR 5 (US 1) | District 4 | 8 | Florida Engineering & Development Corp | $1,262,233 | $1,271,127 | +1.0% | FDOT |
| T2A47 | SR 10 (US 90 / BEAVER ST) AT CR 119 (OTTIS RD) | District 2 | 5 | DB Civil Construction, LLC | $739,490 | $812,998 | +10% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.