FDOT contract T2A63 bid tabulation

SR 24 (US 441 / SW 13TH ST / MLK JR HWY) AT SR 24 (SW ARCHER. Let by Florida DOT on June 10, 2026, Alachua, District 2. 4 bids received; low bid $3,393,115 by Maer Homes, LLC.

Owner
Florida DOT
Letting
10 JUN 2026
Pay items
149
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Maer Homes, LLC$3,393,115Low
2Watson Construction Company, LLC$3,729,691+10%
3DB Civil Construction, LLC$4,299,243+27%
4Preferred Materials Inc.$4,541,529+34%
FDOT contract T2A63: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Maer Homes, LLC2. Watson Construction Company, LLC3. DB Civil Construction, LLC4. Preferred Materials Inc.
0005Mobilization (0101-1)LS1$335,280$300,000$390,000$462,635
0010Maintenance of traffic (0102-1)DA1$250,000$350,000$200,000$399,421
0015Special detour- temporary pavement (0102-2200)SY1$15,000$125,000$150,000$14,078
0020Pedestrian or bicycle special detour (0102-4-1)SY1$44,350$45,000$96,000$1,961.45
0025Pedestrian escort/flagger (0102-5)HR1,320$49.00$39.00$80.00$200.92
0030Traffic control officer (0102-14)HR74$95.00$125.00$100.00$130.76
0035Work zone sign (0102-60)ED9,395$1.00$0.29$0.30$0.27
0040Temporary barrier, F&I, low profile, concrete (0102-71-13)LF456$65.00$45.00$40.00$52.31
0045Temporary barrier, relocate, low profile concrete (0102-71-23)LF37$30.00$50.00$26.00$39.23
0050Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED18,890$0.50$0.12$0.10$0.12
0055Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD15,540$0.25$0.12$0.10$0.05
0060Arrow board / advance warning arrow panel (0102-76)ED455$10.00$10.00$6.00$6.54
0065Portable changeable message sign, temporary (0102-99)ED776$18.00$18.00$12.00$13.40
0070Temporary signalization and maintenance, intersection (0102-104)ED195$27.00$25.00$30.00$31.70
0075Temporary traffic detection and maintenance, intersection (0102-107-1)ED280$31.00$25.00$20.00$22.96
0080Type III barricade (0102-115)ED360$0.55$0.50$0.50$0.30
0085Staked turbidity barrier- nylon reinforced PVC (0104-12)LF1,853$11.00$10.00$6.00$26.15
0090Soil tracking prevention device (0104-15)EACH2$6,200.00$7,500.00$1,200.00$6,538.18
0095Inlet protection system (0104-18)EACH16$350.00$250.00$200.00$326.91
0100Litter removal (0107-1)ACRE11.61$250.00$1,000.00$60.00$653.82
0105Mowing (0107-2)ACRE2.22$350.00$1,000.00$250.00$1,307.64
0110Monitor existing structures- vibration monitoring (0108-2)LS1$23,000$15,000$6,000.00$19,615
0115Clearing & grubbing (0110-1-1)ACRE1$56,000$60,000$150,000$71,410
0120Selective clearing and areas with trees to remain (0110-2-2)ACRE0.28$28,000$40,000$120,000$19,615
0125Removal of existing concrete (0110-4-10)SY1,839$45.00$65.00$50.00$79.91
0130Regular excavation (0120-1)CY236.70$25.00$135.00$160.00$98.07
0135Embankment (0120-6)CY954.70$38.00$75.00$160.00$39.23
0140Geosynthetic reinforced foundation over soft soil (0145-2)SY218$15.00$35.00$85.00$26.15
0145Optional base, base group 09 (0285-709)SY169$55.00$100.00$300.00$196.15
0150Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY10,891$5.00$4.00$6.00$6.15
0155Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN34.90$320.00$1,000.00$400.00$869.33
0160Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN912.30$350.00$250.00$300.00$292.43
0165Plain cement concrete 8" (0350-3-5)SY82$310.00$315.00$350.00$385.71
0170Cleaning & sealing joints- concrete pavement (0350-5)LF115$15.00$43.47$45.00$6.54
0175Grinding concrete pavement (0352-70)SY82$150.00$100.00$120.00$175.81
0180Concrete class NS, gravity index 400-011 (0400-0-11)CY194.90$1,200.00$947.00$1,500.00$1,365.50
0185Inlets, curb, type P-5, <10' (0425-1351)EACH1$16,550$14,000$15,000$17,256
0190Inlets, curb, type P-5, partial (0425-1355)EACH2$12,500$9,500.00$9,000.00$14,211
0195Inlets, closed flume (0425-1910)EACH1$8,500.00$9,500.00$12,000$13,123
0200Manholes, P-8, partial (0425-2-63)EACH1$11,850$9,000.00$6,000.00$14,936
0205Manhole, adjust (0425-5)EACH1$1,800.00$2,000.00$4,000.00$3,029.27
0210Pipe culvert, optional material, round, 18"SD (0430-174118)LF27$555.00$300.00$700.00$454.76
0215Pedestrian / bicycle railing, NS, 42" type 1 (0515-2111)LF131$255.00$125.00$120.00$261.53
0220Concrete curb & gutter, type E (0520-1-7)LF1,253$49.00$55.00$115.00$111.40
0225Concrete curb & gutter, type F (0520-1-10)LF1,018$53.00$55.00$115.00$109.48
0230Concrete curb, type B (0520-2-2)LF39$58.00$75.00$115.00$112.22
0235Curb-concrete pavement joint (0520-4)LF78$15.00$25.00$40.00$186.85
0240Concrete traffic separator, special- variable width (0520-70)SY31$195.00$200.00$300.00$1,293.54
0245Concrete sidewalk and driveways, 4" thick (0522-1)SY1,703$85.00$198.00$150.00$167.13
0250Concrete sidewalk and driveways, 6" thick (0522-2)SY548$110.00$207.00$200.00$190.69
0255Concrete slope pavement,non reinforced, 4" (0524-2-2)SY233$225.00$198.00$330.00$306.85
0260Pavers, architectural, (0526-1-2)SY128$211.00$200.00$350.00$288.33
0265Detectable warnings (0527-2)SF404$57.00$65.00$45.00$65.16
0270Fencing, type B, 5.1-6.0', standard (0550-10220)LF228$41.00$80.00$35.00$196.15
0275Performance turf, sod (0570-1-2)SY1,223$7.00$18.00$15.00$18.37
0280Delineator, flexible tubular (0705-11-1)EACH120$280.00$125.00$160.00$196.15
0285Raised pavement marker, type B (0706-1-3)EACH1,272$9.80$6.50$8.00$7.52
0290Painted pavement markings, standard, white, solid, 6" (0710-11101)GM1.86$1,800.00$2,640.00$1,800.00$2,472.48
0295Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.31$2,500.00$3,500.00$2,200.00$3,194.53
0300Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF627$3.00$3.00$3.00$2.62
0305Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF679$5.00$5.00$6.00$4.25
0310Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.22$1,300.00$2,640.00$1,200.00$1,277.21
0315Painted pavement markings, standard, white, message or symbol (0710-11160)EACH6$165.00$200.00$160.00$137.30
0320Painted pavement markings, standard, white, arrows (0710-11170)EACH23$90.00$75.00$80.00$81.07
0325Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.90$2,000.00$2,640.00$1,800.00$2,467.88
0330Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.10$1,000.00$2,640.00$1,200.00$1,294.75
0335Directional indicators (0919-528100)SF37$45.00$50.00$60.00$196.15
0340Raised crosswalk, type RC curb with plate/grate (0920-520100)LF15$570.00$3,333.33$750.00$653.82
0345Initial contingency amount, DO not bid (0999-25)LS1$50,000$50,000$50,000$50,000
0350Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH14$650.00$1,091.00$800.00$581.90
0355Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH1$2,700.00$2,200.00$3,000.00$2,484.51
0360Single column ground sign assembly, relocate (0700-1500)EACH9$255.00$350.00$200.00$228.84
0365Single column ground sign assembly, remove (0700-1600)EACH9$75.00$75.00$100.00$65.38
0370Sign panel, relocate, UP to 12 SF (0700-3501)EACH1$100.00$250.00$250.00$65.38
0375In-street sign assembly, and install- fixed base connection (0700-15-2)EACH2$850.00$2,500.00$700.00$706.13
0380Tubular marker, 36" white post (0704-1-3)EACH8$200.00$200.00$200.00$176.53
0385Tubular marker, 36" yellow (0704-1-4)EACH2$200.00$200.00$200.00$176.53
0390Object marker, type 3 (0705-10-3)EACH2$355.00$300.00$350.00$326.91
0395Raised pavement marker, type B (0706-1-3)EACH304$9.80$6.50$8.00$7.52
0400Painted pavement markings, standard, yellow, island nose (0710-11290)SF16$11.00$10.00$10.00$32.69
0405Painted pavement markings, surface (0710-90)LS1$17,000$26,000$16,000$18,307
0410Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF627$7.00$5.00$6.00$6.54
0415Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF621$8.00$8.00$7.00$10.13
0420Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF183$11.00$10.00$10.00$13.08
0425Thermoplastic, standard, vertical deflection marking (0711-11130)EACH1$140.00$200.00$120.00$1,830.69
0430Thermoplastic, standard, vertical deflection advance warning marking (0711-11140)EACH1$280.00$200.00$250.00$1,830.69
0435Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.18$3,200.00$7,920.00$3,000.00$43,710
0440Thermoplastic, standard, message or symbol (0711-11160)EACH6$280.00$500.00$250.00$228.84
0445Thermoplastic, standard, arrow (0711-11170)EACH24$129.00$300.00$120.00$137.30
0450Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF23$10.00$8.00$7.00$10.46
0455Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.05$3,000.00$7,920.00$3,000.00$38,139
0460Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF531$25.00$17.00$22.00$19.29
0465Thermoplastic, preformed, white, message (0711-14160)EACH1$275.00$550.00$300.00$392.29
0470Thermoplastic, preformed, white, arrow (0711-14170)EACH1$200.00$450.00$200.00$307.29
0475Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526)LF36$35.00$25.00$32.00$45.77
0480Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528)LF38$30.00$25.00$26.00$26.15
0485Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560)EACH1$600.00$750.00$600.00$948.03
0490Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM0.75$11,000$7,920.00$9,000.00$11,125
0495Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.21$13,000$8,500.00$12,000$29,933
0500Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM0.34$4,200.00$7,920.00$3,500.00$10,884
0505Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM0.53$10,000$7,920.00$9,000.00$11,139
0510Thermoplastic, standard-other surfaces, yellow, solid, 8" (0711-16202)GM0.02$14,000$8,500.00$12,000$28,643
0515Itsfm subsurface documentation- project length (0611-1-1)MI0.32$6,100.00$13,000$4,000.00$5,281.21
0520Itsfm location documentation- intersection (0611-2-1)EACH1$4,200.00$3,500.00$3,000.00$2,650.09
0525Conduit, furnish & install, open trench (0630-2-11)LF155$18.00$30.00$37.00$22.77
0530Conduit, furnish & install, directional bore (0630-2-12)LF694$47.00$54.00$64.00$53.67
0535Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI1$29,000$18,500$23,000$15,432
0540Signal cable, remove- intersection (0632-7-6)PI1$3,300.00$4,300.00$5,200.00$2,470.30
0545Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF110$6.20$7.00$9.00$6.37
0550Fiber optic cable, F&I, underground,13-48 fibers (0633-1122)LF110$6.50$7.00$9.00$6.45
0555Fiber optic connection, install, splice (0633-2-31)EACH24$79.00$70.00$70.00$78.90
0560Fiber optic connection, install, termination (0633-2-32)EACH24$135.00$105.00$120.00$131.04
0565Fiber optic connection hardware, F&I, splice enclosure (0633-3-11)EACH1$2,250.00$1,750.00$2,000.00$2,072.38
0570Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH2$88.00$80.00$80.00$93.48
0575Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH2$150.00$120.00$140.00$147.22
0580Fiber optic connection hardware, F&I, patch panel- terminated (0633-3-16)EACH2$2,020.00$1,600.00$1,800.00$2,703.68
0585Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH2$176.00$145.00$200.00$242.20
0590Fiber optic cable locator (0633-6)DA150$205.00$140.00$70.00$228.84
0595Span wire assembly, F&I, two point, diagonal (0634-4152)PI1$5,500.00$9,750.00$11,000$11,237
0600Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH1$2,100.00$1,600.00$2,000.00$2,109.17
0605Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH1$2,650.00$2,500.00$3,000.00$4,050.05
0610Pull & splice box, F&I, 30" X 60" rectangular or 36" round size (0635-2-13)EACH1$8,200.00$5,000.00$6,000.00$8,436.96
0615Pull & splice box, F&I, 17" X 30" cover size (0635-2-14)EACH18$2,450.00$1,920.00$2,100.00$2,348.45
0620Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$9,200.00$4,100.00$4,500.00$7,603.96
0625Electrical service wire, & install (0639-2-1)LF10$12.00$18.00$20.00$19.79
0630Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$1,950.00$3,500.00$3,800.00$3,507.03
0635Prestressed concrete pole, complete pole removal- pedestal/service pole (0641-2-60)EACH2$325.00$700.00$800.00$1,451.22
0640Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70)EACH3$8,400.00$8,000.00$8,000.00$11,908
0645Aluminum signals pole, (0646-1-11)EACH9$3,500.00$3,750.00$4,000.00$3,824.31
0650Aluminum signals pole, remove (0646-1-60)EACH1$2,450.00$800.00$1,000.00$669.45
0655Steel strain pole, F&I, type PS- VIII (0649-1-15)EACH2$105,000$83,000$97,500$91,484
0660Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS13$3,100.00$3,300.00$4,000.00$2,546.82
0665Vehicular traffic signal, furnish & install aluminum, 4 section, 1 way (0650-1-16)AS1$4,100.00$3,450.00$4,200.00$3,139.95
0670Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS1$5,200.00$4,500.00$4,800.00$3,904.92
0675Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS8$1,300.00$1,100.00$1,200.00$1,534.97
0680Vehicle detection system- furnish & install cabinet equipment (0660-4-11)EACH1$31,000$30,200$35,000$22,843
0685Vehicle detection system- furnish & install above ground equipment (0660-4-12)EACH1$21,000$8,000.00$9,000.00$10,944
0690Signal priority and preemption system, F&I, optical, cabinet electronics (0663-1111)EACH1$12,100$8,250.00$9,500.00$12,385
0695Signal priority and preemption system, F&I, optical, detector (0663-1112)EACH4$3,400.00$5,600.00$6,500.00$5,089.59
0700Pedestrian detector, furnish & install, standard (0665-1-11)EACH8$465.00$225.00$250.00$1,233.94
0705Traffic controller assembly, F&I, NEMA W/standard lock, 1 preemption (0670-5161)AS1$67,000$60,350$65,000$84,938
0710Traffic controller assembly, remove controller with (0670-5600)AS1$1,750.00$10,000$10,000$2,028.91
0715ITS CCTV camera, pressurized, high definition (0682-1163)EACH1$13,200$10,850$12,000$15,531
0720Managed field ethernet switch, furnish & install (0684-1-1)EACH1$6,900.00$11,000$11,500$9,174.55
0725Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13)EACH1$17,350$12,000$14,000$17,414
0730Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH2$1,600.00$2,950.00$2,900.00$1,372.94
0735Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH3$9,400.00$9,850.00$11,000$7,367.90
0740Enhanced highway sign AC powered, F&I overhead blank out sign <12 SF (0700-141360)EACH1$9,800.00$8,450.00$10,000$1,062.83
0745Utility work- jpa/utility agreement, power (1000-7)LS1$140,397$150,820$214,988$253,552
FDOT contract T2A63: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy