FDOT contract T3952 bid tabulation
CR 372 (SURF RD) OVER OTTER CREEK RISE, BRIDGE NO 59069. Let by Florida DOT on June 10, 2026, Wakulla, District 3. 2 bids received; low bid $11,973,993 by RJ Gorman Contracting LLC.
- Owner
- Florida DOT
- Letting
- 10 JUN 2026
- Pay items
- 116
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | RJ Gorman Contracting LLC | $11,973,993 | Low |
| 2 | Murphree Bridge Corporation | $11,977,134 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. RJ Gorman Contracting LLC | 2. Murphree Bridge Corporation |
|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $177,326 | $265,000 |
| 0010 | Concrete class II, approach slabs (0400-2-10) | CY | 129.40 | $972.90 | $2,100.00 |
| 0015 | Concrete class IV, bridge substructure (0400-4-5) | CY | 120.20 | $3,114.48 | $3,650.00 |
| 0020 | Conc class IV, bulkhead (0400-4-8) | CY | 369 | $2,778.09 | $3,700.00 |
| 0025 | Concrete class IV, cast in place topping with shrinkage admixture (0400-4-47) | CY | 136.50 | $2,417.76 | $3,200.00 |
| 0030 | Bridge deck grooving (0400-7-1) | SY | 397 | $13.18 | $18.00 |
| 0035 | Plain neoprene bearing pads (0400-148) | CF | 14.20 | $1,324.04 | $1,350.00 |
| 0040 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 591 | $1.88 | $1.85 |
| 0045 | Reinforcing steel- approach slabs (0415-1-9) | LB | 25,456 | $1.88 | $1.85 |
| 0050 | Fiber reinforced polymer bars, #4 bar (0415-10-4) | LF | 6,110 | $2.52 | $1.80 |
| 0055 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 34,317 | $2.54 | $2.80 |
| 0060 | Fiber reinforced polymer bars, #6 bar (0415-10-6) | LF | 38,185 | $2.82 | $3.05 |
| 0065 | Fiber reinforced polymer bars, #7 bar (0415-10-7) | LF | 9,928 | $3.15 | $3.50 |
| 0070 | Fiber reinforced polymer bars, #9 bar (0415-10-9) | LF | 3,003 | $3.97 | $9.10 |
| 0075 | Prestressed beam: florida slab beam, beam depth 12" CFRP/SS, width 52-54" (0450-8-52) | LF | 345 | $795.29 | $650.00 |
| 0080 | Prestressed beam: florida slab beam, beam depth 12" CFRP/SS, width 55-57" (0450-8-53) | LF | 691 | $792.24 | $650.00 |
| 0085 | Preformed pile holes, 36" to 43" drill/punch size (0455-15-16) | LF | 1,331 | $45.87 | $250.00 |
| 0090 | Preformed pile holes casing, to 43" drill/punch size (0455-15-26) | LF | 1,403 | $405.33 | $75.00 |
| 0095 | Pile inspection, driven pile (0455-20-1) | EACH | 68 | $1,391.67 | $700.00 |
| 0100 | Prestressed concrete piling, SQ W/FRP or stainless steel strand and reinforcing (0455-34-25) | LF | 3,780 | $568.69 | $475.00 |
| 0105 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 4,789 | $65.09 | $90.00 |
| 0110 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 68 | $3,127.59 | $1,650.00 |
| 0115 | Load test (dynamic), test (0455-137-2) | EACH | 19 | $1,231.20 | $1,650.00 |
| 0120 | Test piles-prestressed concrete, 24" SQ W/ FRP or stainless steel strand and reinforcing (0455-143-25) | LF | 1,465 | $530.11 | $505.00 |
| 0125 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 288 | $79.25 | $80.00 |
| 0130 | Bullet rail, double rail (0515-4-2) | LF | 306 | $87.00 | $52.00 |
| 0135 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 150 | $159.78 | $125.00 |
| 0140 | Concrete traffic railing- 36" FRP-RC single slope (0521-5101) | LF | 248 | $209.19 | $225.00 |
| 0145 | Concrete parapet, pedestrian/bicycle, 27" height (0521-6-11) | LF | 306 | $110.13 | $138.00 |
| 0150 | Riprap, sand-cement bags (0530-1100) | CY | 142.50 | $902.97 | $1,650.00 |
| 0155 | Riprap- rubble, coastal shore- large boulders (0530-3-5) | TN | 3,013.60 | $150.28 | $190.00 |
| 0160 | Bedding stone (0530-74) | TN | 931.50 | $132.17 | $205.00 |
| 0165 | Retaining wall system,temporary, excluding barrier (0548-13) | SF | 1,647 | $27.05 | $122.00 |
| 0170 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 1,555 | $9.83 | $20.00 |
| 0175 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 12 | $475.57 | $1,700.00 |
| 0180 | Mobilization (0101-1) | LS | 1 | $1,211,061 | $1,288,019 |
| 0185 | Maintenance of traffic (0102-1) | DA | 1 | $84,841 | $163,750 |
| 0190 | Special detour- temporary pavement (0102-2200) | SY | 1 | $86,375 | $107,640 |
| 0195 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $85,511 | $81,120 |
| 0200 | Commercial material for temporary driveway maintenance (0102-3) | CY | 13.90 | $188.72 | $100.00 |
| 0205 | Work zone sign (0102-60) | ED | 5,010 | $0.41 | $0.28 |
| 0210 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 120 | $73.25 | $50.00 |
| 0215 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 2,413 | $65.92 | $45.00 |
| 0220 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 2,088 | $16.11 | $11.00 |
| 0225 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 10,794 | $0.15 | $0.10 |
| 0230 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 255,050 | $0.07 | $0.05 |
| 0235 | Temporary crash cushion, redirective option (0102-89-1) | LO | 8 | $1,318.42 | $900.00 |
| 0240 | Portable changeable message sign, temporary (0102-99) | ED | 1,008 | $14.65 | $10.00 |
| 0245 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.06 | $17,400 | $10,000 |
| 0250 | Removable tape, yellow, solid, (0102-913-31) | GM | 0.06 | $17,400 | $10,000 |
| 0255 | Sediment barrier (0104-10-3) | LF | 1,890 | $2.57 | $5.00 |
| 0260 | Floating turbidity barrier (0104-11) | LF | 492 | $15.35 | $20.00 |
| 0265 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 530 | $12.02 | $15.00 |
| 0270 | Soil tracking prevention device (0104-15) | EACH | 2 | $3,226.84 | $6,000.00 |
| 0275 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $12,086 | $8,500.00 |
| 0280 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $21,461 | $30,000 |
| 0285 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $110,128 | $28,320 |
| 0290 | Removal of existing concrete (0110-4-10) | SY | 325 | $1,175.24 | $600.00 |
| 0295 | Mailbox, F&I single (0110-7-1) | EACH | 14 | $249.03 | $170.00 |
| 0300 | Regular excavation (0120-1) | CY | 2,420.40 | $16.52 | $20.00 |
| 0305 | Subsoil excavation (0120-4) | CY | 756.70 | $25.60 | $40.00 |
| 0310 | Embankment (0120-6) | CY | 7,150.70 | $49.08 | $24.00 |
| 0315 | Flowable fill (0121-70) | CY | 7 | $482.67 | $400.00 |
| 0320 | Settlement plate assembly (0141-70) | AS | 9 | $1,698.02 | $5,000.00 |
| 0325 | Geosynthetic reinforced embankment (0145-3) | SY | 1,066 | $2.78 | $13.14 |
| 0330 | Type B stabilization (0160-4) | SY | 5,106 | $7.53 | $7.00 |
| 0335 | Optional base, base group 01 (0285-701) | SY | 1,084 | $21.87 | $11.00 |
| 0340 | Optional base, base group 06 (0285-706) | SY | 1,077 | $46.16 | $22.00 |
| 0345 | Optional base, base group 09 (0285-709) | SY | 1,252 | $47.60 | $23.00 |
| 0350 | Turnout base- optional materials (0286-1) | SY | 348 | $39.78 | $33.00 |
| 0355 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 1,017 | $9.21 | $6.00 |
| 0360 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 288.20 | $271.01 | $240.50 |
| 0365 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 261.60 | $333.59 | $273.00 |
| 0370 | Miscellaneous asphalt (0339-1) | TN | 56.10 | $512.72 | $300.00 |
| 0375 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 1 | $8,033.31 | $5,295.01 |
| 0380 | Pipe culvert, optional material, other shape - ellip/arch, 18"SD (0430-174218) | LF | 19 | $356.81 | $186.46 |
| 0385 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 61 | $257.43 | $186.46 |
| 0390 | Mitered end section, optional - elliptical / arch, 18" CD (0430-982625) | EACH | 1 | $5,701.06 | $1,200.00 |
| 0395 | Mitered end sect, optional - elliptical / arch, 18" SD (0430-984625) | EACH | 2 | $4,612.84 | $1,200.00 |
| 0400 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 121 | $537.12 | $732.00 |
| 0405 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 91 | $125.86 | $97.20 |
| 0410 | Concrete ditch pavement, 4", reinforced (0524-1-29) | SY | 11 | $563.57 | $734.18 |
| 0415 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 35 | $364.11 | $97.20 |
| 0420 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 1.10 | $798.26 | $1,000.00 |
| 0425 | Bedding stone (0530-74) | TN | 0.80 | $1,093.56 | $1,000.00 |
| 0430 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 259 | $34.80 | $20.00 |
| 0435 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 2 | $4,176.06 | $2,400.00 |
| 0440 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 2 | $3,045.05 | $1,750.00 |
| 0445 | Guardrail removal (0536-73) | LF | 610 | $3.48 | $2.00 |
| 0450 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $3,480.05 | $2,000.00 |
| 0455 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 2 | $5,161.18 | $2,966.15 |
| 0460 | Performance turf, sod (0570-1-2) | SY | 8,571 | $5.86 | $4.50 |
| 0465 | Plastic erosion mat, TRM, type 2 (0571-1-12) | SY | 668 | $6.44 | $8.46 |
| 0470 | Raised pavement marker, type B (0706-1-3) | EACH | 1,950 | $8.70 | $5.00 |
| 0475 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.86 | $2,349.04 | $1,350.00 |
| 0480 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.87 | $2,349.04 | $1,350.00 |
| 0485 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 6 | $585.97 | $400.00 |
| 0490 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $73.25 | $50.00 |
| 0495 | Object marker, type 3 (0705-10-3) | EACH | 4 | $388.20 | $265.00 |
| 0500 | Object marker, type 4 (0705-10-4) | EACH | 3 | $388.20 | $265.00 |
| 0505 | Raised pavement marker, type B (0706-1-3) | EACH | 58 | $8.70 | $5.00 |
| 0510 | Painted pavement markings, surface (0710-90) | LS | 1 | $4,350.07 | $2,500.00 |
| 0515 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.47 | $11,310 | $6,500.00 |
| 0520 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.32 | $11,310 | $6,500.00 |
| 0525 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.08 | $7,830.12 | $4,500.00 |
| 0530 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.04 | $55,681 | $32,000 |
| 0535 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.04 | $55,681 | $32,000 |
| 0540 | Sediment barrier (0104-10-3) | LF | 284 | $2.59 | $5.00 |
| 0545 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 6" (1050-42206) | LF | 14 | $130.50 | $124.96 |
| 0550 | Utility pipe- high density polyethylene, furnish & install, water/sewer, 10" (1050-42210) | LF | 657 | $234.90 | $268.45 |
| 0555 | Utility fittings, ductile iron, furnish & install elbow, (1055-51110) | EACH | 4 | $7,830.11 | $2,432.06 |
| 0560 | Utility fittings, ductile iron, furnish & install tee, 10" (1055-51210) | EACH | 2 | $7,830.11 | $2,842.92 |
| 0565 | Utility fixture- tapping saddle/sleeve, furnish & 10" (1080-23110) | EACH | 1 | $13,050 | $4,860.71 |
| 0570 | Utility fixture, valve assembly, furnish and install, 6" (1080-24106) | EACH | 2 | $9,570.14 | $2,386.59 |
| 0575 | Utility fixture, valve assembly, furnish and install, 10" (1080-24110) | EACH | 2 | $10,179 | $5,043.10 |
| 0580 | Fire hydrant, F&I, standard, 2 hose, 1PUMPER, 6" (1644-113-08) | EACH | 2 | $13,529 | $7,204.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of June 10, 2026. Compiled by Mirage Metrics.