Murphree Bridge Corporation submitted 37 bids on Florida DOT contracts in the data, from 23 MAY 2018 to 28 OCT 2026, and was the low bidder on 21 of them (57%). When it was not low, its total sat a median +8.0% above the low bid.

Owner
Florida DOT
Low bid volume
$72,670,574
Latest bid
28 OCT 2026
Data through
28 OCT 2026
37Bids
21Low bids
57Win rate, percent
+8.0%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
20187571%
201933100%
2020100%
20214250%
202222100%
20234375%
20242150%
20253267%
202611327%
Murphree Bridge Corporation, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 3352160%
District 2200%
Murphree Bridge Corporation, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED3732 (86%)$0.12$0.13
Guardrail end treatment- parallel approach terminal0536-85-24EACH3229 (91%)$3,000.00$3,352.68
Optional base, base group 060285-706SY3428 (82%)$21.12$31.00
Permanent tape, white, solid, 6" for concrete bridges0713-103101GM3427 (79%)$32,500$33,000
Permanent tape, yellow, solid, for concrete bridges0713-103201GM3327 (82%)$32,500$33,000
Raised pavement marker, type B0706-1-3EACH3526 (74%)$6.00$5.00
Work zone sign0102-60ED3725 (68%)$0.30$0.25
Portable changeable message sign, temporary0102-99ED3725 (68%)$15.00$12.00
Performance turf, sod0570-1-2SY3723 (62%)$4.00$5.00
Type B stabilization0160-4SY3723 (62%)$7.00$15.00
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM3422 (65%)$6,375.00$5,200.00
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM3221 (66%)$6,500.00$5,220.00
Murphree Bridge Corporation, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Anderson Columbia Co., Inc.267 of 26
Superior Construction Company Southeast, LLC152 of 15
RJ Gorman Contracting LLC154 of 15
F & W Construction Company, Inc.126 of 12
GDB-US Constructors, Inc.121 of 12
Vecellio & Grogan, Inc.40 of 4
RBM Contracting Services, LLC43 of 4
North Florida Construction, Inc.30 of 3
Scott Bridge Company, Inc.20 of 2
Roads, Inc. of NWF21 of 2
Murphree Bridge Corporation, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T3970District 3HANNA MILL POND RD OVER HANNA POND BRIDGE NO 5040434 of 5$5,907,877+13%
30 SEP 2026T3908District 3SCOTT RD OVER ECONFINA CREEK, BRIDGE NO 4644232 of 5$2,679,117+2.0%
30 SEP 2026T3937District 3CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 5300261 of 4$7,547,559Low, 24% under the second
29 JUL 2026T3920District 3CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 5241784 of 6$979,483+2.0%
10 JUN 2026T3952District 3CR 372 (SURF RD) OVER OTTER CREEK RISE, BRIDGE NO 590692 of 2$11,977,1340.0%
10 JUN 2026T3981District 3CR 268 (HIGH BRIDGE RD) OVER LITTLE RIVER, BRIDGE NO 5041592 of 3$7,830,063+19%
29 APR 2026T3919District 3HUB PRESLEY RD OVER POND CREEK, BRIDGE NO 6041523 of 4$1,878,085+13%
25 MAR 2026T3951District 3SR 20 OVER ECONFINA CREEK, BRIDGE NO 460037 AND 4600342 of 4$14,807,2440.0%
25 FEB 2026T3928District 3SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 4644191 of 6$5,598,308Low, 3.0% under the second
28 JAN 2026T3929District 3CR 274 OVER TENMILE CREEK BRIDGE NO. 4700352 of 7$6,237,905+8.0%
28 JAN 2026T3954District 3KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 4840601 of 3$2,666,435Low, 2.0% under the second
03 DEC 2025T3958District 3VICTORIA AVE OVER TIDAL BRANCH, BRIDGE NO 5140601 of 2$1,165,588Low, 5.0% under the second
30 APR 2025T3879District 3HOWELL WILLIAMS RD OVER TEN MILE CREEK, BRIDGE NO 5241501 of 3$2,250,788Low, 7.0% under the second
26 FEB 2025T2A16District 2SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND....2 of 5$14,508,274+5.0%
28 FEB 2024T3851District 3INTERSTATE CIR OVER EIGHTMILE CREEK, BRIDGE NO 4840711 of 2$3,185,384Low, 3.0% under the second
31 JAN 2024T3790District 3WOODHAM RD OVER HOLMES CREEK AND RELIEF BRIDGE ...2 of 3$3,697,129+4.0%
25 OCT 2023T3807District 3SR 390 OVER MILL BAYOU, BRIDGE NO. 4600201 of 2$9,896,610Low, 4.0% under the second
14 JUN 2023T3791District 3ROBBINS BRIDGE ROAD1 of 2$2,097,844Low, 5.0% under the second
26 APR 2023T3792District 3BUDDY RD3 of 3$1,833,966+47%
26 APR 2023T3824District 3CR 4 W HWY 41 of 2$3,559,704Low, 75% under the second
26 OCT 2022T3774District 3TRAM RD1 of 5$2,352,518Low, 11% under the second
25 MAY 2022T3719District 3THOMAS DR1 of 2$2,161,422Low, 56% under the second
08 DEC 2021T3704District 3PLEASANT RIDGE RD2 of 4$1,529,839+5.0%
17 NOV 2021T3712District 3CR 673 of 4$4,764,418+13%
27 OCT 2021T3718District 3CR 159 (SALEM RD)1 of 3$5,830,119Low, 4.0% under the second
Murphree Bridge Corporation: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy