FDOT contract T3929 bid tabulation
CR 274 OVER TENMILE CREEK BRIDGE NO. 470035. Let by Florida DOT on January 28, 2026, Calhoun, District 3. 7 bids received; low bid $5,763,181 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 28 JAN 2026
- Pay items
- 81
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $5,763,181 | Low |
| 2 | Murphree Bridge Corporation | $6,237,905 | +8.0% |
| 3 | F & W Construction Company, Inc. | $6,596,309 | +14% |
| 4 | McInnis Construction LLC | $8,394,528 | +46% |
| 5 | RJ Gorman Contracting LLC | $8,479,634 | +47% |
| 6 | Superior Construction Company Southeast, LLC | $10,251,428 | +78% |
| 7 | Southern Road & Bridge, LLC | $15,296,246 | +165% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Murphree Bridge Corporation | 3. F & W Construction Company, Inc. | 4. McInnis Construction LLC | 5. RJ Gorman Contracting LLC | 6. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $125,000 | $205,000 | $540,000 | $212,636 | $570,000 | $650,000 |
| 0010 | Concrete class II, approach slabs (0400-2-10) | CY | 98.70 | $850.00 | $1,140.00 | $650.00 | $377.57 | $890.00 | $1,000.00 |
| 0015 | Concrete class II, cast-in-place topping with shrinkage admixture (0400-2-47) | CY | 276 | $1,285.00 | $1,665.00 | $700.00 | $1,695.01 | $1,680.00 | $1,800.00 |
| 0020 | Concrete class IV, bridge substructure (0400-4-5) | CY | 135.70 | $1,725.00 | $2,975.00 | $650.00 | $3,787.70 | $2,600.00 | $2,000.00 |
| 0025 | Bridge deck grooving (0400-7-1) | SY | 1,085 | $11.25 | $4.00 | $4.00 | $4.11 | $10.00 | $8.25 |
| 0030 | Bridge deck planing (0400-9-1) | SY | 1,085 | $12.00 | $8.00 | $10.00 | $8.40 | $10.00 | $13.00 |
| 0035 | Plain neoprene bearing pads (0400-148) | CF | 22 | $1,200.00 | $1,500.00 | $1,500.00 | $1,254.28 | $1,800.00 | $1,250.00 |
| 0040 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 64,026 | $2.00 | $1.50 | $2.50 | $1.64 | $1.75 | $1.20 |
| 0045 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 17,445 | $2.00 | $1.50 | $2.50 | $1.64 | $1.75 | $1.40 |
| 0050 | Reinforcing steel- approach slabs (0415-1-9) | LB | 18,896 | $2.00 | $1.50 | $2.50 | $1.64 | $1.75 | $1.40 |
| 0055 | Fiber reinforced polymer bars, #5 bar (0415-10-5) | LF | 1,740 | $4.50 | $3.00 | $5.00 | $2.69 | $3.00 | $5.00 |
| 0060 | Prestressed beam: florida slab beam, beam depth 12" carbon steel, width 55-57" (0450-8-13) | LF | 2,099 | $369.00 | $285.00 | $300.00 | $412.72 | $370.00 | $275.00 |
| 0065 | Pile inspection, driven pile (0455-20-1) | EACH | 35 | $966.00 | $650.00 | $5,000.00 | $963.75 | $1,000.00 | $1,500.00 |
| 0070 | Steel piling, 24" dia. pipe (0455-35-22) | LF | 2,278 | $356.00 | $310.00 | $175.00 | $407.53 | $405.00 | $300.00 |
| 0075 | Pile redrive (0455-115) | EACH | 14 | $650.00 | $2,500.00 | $10,000 | $10,355 | $8,000.00 | $1,400.00 |
| 0080 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 35 | $2,500.00 | $2,500.00 | $6,500.00 | $2,594.97 | $1,050.00 | $1,400.00 |
| 0085 | Load test (dynamic), test (0455-137-2) | EACH | 7 | $2,876.00 | $250.00 | $10,000 | $13,441 | $4,000.00 | $797.00 |
| 0090 | Test piles - steel, 24" dia pipe (0455-144-22) | LF | 677 | $415.00 | $345.00 | $500.00 | $380.27 | $540.00 | $550.00 |
| 0095 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 83 | $100.00 | $65.00 | $60.00 | $166.51 | $90.00 | $50.00 |
| 0100 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 600 | $175.00 | $130.00 | $125.00 | $108.67 | $155.00 | $145.00 |
| 0105 | Riprap, sand-cement bags (0530-1100) | CY | 29.60 | $1,000.00 | $1,300.00 | $1,200.00 | $810.13 | $970.00 | $800.00 |
| 0110 | Riprap- rubble, bank and shore (0530-3-3) | TN | 1,105.40 | $150.00 | $120.00 | $100.00 | $152.34 | $170.00 | $110.00 |
| 0115 | Bedding stone (0530-74) | TN | 411.60 | $160.00 | $125.00 | $90.00 | $150.62 | $155.00 | $140.00 |
| 0120 | Mobilization (0101-1) | LS | 1 | $550,500 | $918,975 | $400,000 | $757,758 | $800,000 | $1,000,000 |
| 0125 | Maintenance of traffic (0102-1) | DA | 1 | $50,000 | $45,310 | $50,000 | $87,777 | $85,000 | $77,000 |
| 0130 | Special detour- temporary pavement (0102-2200) | SY | 1 | $90,000 | $92,250 | $105,000 | $116,913 | $135,000 | $210,000 |
| 0135 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $450,000 | $420,000 | $450,000 | $534,906 | $845,000 | $600,000 |
| 0140 | Special detour- temporary bridge (0102-2400) | EACH | 1 | $410,000 | $780,000 | $1,518,000 | $1,957,718 | $1,250,000 | $1,866,125 |
| 0145 | Commercial material for temporary driveway maintenance (0102-3) | CY | 2.60 | $1,500.00 | $250.00 | $250.00 | $278.37 | $1,000.00 | $500.00 |
| 0150 | Work zone sign (0102-60) | ED | 18,390 | $0.39 | $0.31 | $0.31 | $0.34 | $0.55 | $0.31 |
| 0155 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 450 | $52.00 | $50.00 | $50.00 | $55.12 | $84.00 | $50.00 |
| 0160 | Temporary guardrail (0102-73) | LF | 480 | $0.35 | $26.74 | $40.00 | $44.09 | $45.00 | $40.00 |
| 0165 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 53,102 | $0.12 | $0.11 | $0.11 | $0.12 | $0.20 | $0.11 |
| 0170 | Temporary crash cushion, redirective option (0102-89-1) | LO | 4 | $1,500.00 | $1,000.00 | $1,000.00 | $1,102.32 | $1,750.00 | $2,700.00 |
| 0175 | Portable changeable message sign, temporary (0102-99) | ED | 1,488 | $16.00 | $15.00 | $15.00 | $16.53 | $25.00 | $15.00 |
| 0180 | Type III barricade (0102-115) | ED | 4,640 | $0.38 | $0.30 | $0.30 | $0.33 | $0.75 | $0.30 |
| 0185 | Radar speed display unit (0102-150-2) | ED | 860 | $8.00 | $7.00 | $7.00 | $7.72 | $12.00 | $7.00 |
| 0190 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 600 | $2.00 | $25.00 | $25.00 | $27.56 | $40.00 | $40.00 |
| 0195 | Sediment barrier (0104-10-3) | LF | 2,678 | $5.77 | $6.00 | $2.50 | $11.02 | $4.50 | $10.00 |
| 0200 | Floating turbidity barrier (0104-11) | LF | 26 | $100.00 | $30.00 | $25.00 | $55.12 | $36.00 | $100.00 |
| 0205 | Soil tracking prevention device (0104-15) | EACH | 2 | $4,000.00 | $3,500.00 | $3,500.00 | $3,897.11 | $9,000.00 | $11,000 |
| 0210 | Monitor existing structures- inspection and settlement monitoring (0108-1) | LS | 1 | $7,500.00 | $15,000 | $30,000 | $6,613.94 | $26,000 | $5,000.00 |
| 0215 | Monitor existing structures- vibration monitoring (0108-2) | LS | 1 | $7,500.00 | $18,000 | $25,000 | $11,023 | $30,000 | $10,560 |
| 0220 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $45,000 | $25,000 | $30,000 | $33,404 | $62,000 | $1,900,000 |
| 0225 | Removal of existing concrete (0110-4-10) | SY | 115 | $31.00 | $9.10 | $9.10 | $10.13 | $55.00 | $60.00 |
| 0230 | Mailbox, F&I single (0110-7-1) | EACH | 1 | $695.00 | $650.00 | $250.00 | $551.16 | $350.00 | $400.00 |
| 0235 | Regular excavation (0120-1) | CY | 1,083.80 | $20.00 | $12.50 | $12.50 | $13.92 | $16.00 | $16.00 |
| 0240 | Borrow excavation, truck measure (0120-2-2) | CY | 1,837.80 | $34.00 | $16.00 | $18.00 | $20.04 | $24.00 | $29.00 |
| 0245 | Type B stabilization (0160-4) | SY | 3,679 | $5.70 | $4.40 | $4.40 | $4.90 | $6.00 | $15.00 |
| 0250 | Optional base, base group 01 (0285-701) | SY | 380 | $25.00 | $21.00 | $21.00 | $23.38 | $27.00 | $36.00 |
| 0255 | Optional base, base group 06 (0285-706) | SY | 2,624 | $27.00 | $21.50 | $23.50 | $26.17 | $30.50 | $26.00 |
| 0260 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,956 | $4.00 | $4.40 | $4.40 | $4.90 | $5.80 | $7.00 |
| 0265 | Superpave asphaltic concrete, traffic B, PG76-22 (0334-1-52) | TN | 194.50 | $190.00 | $152.50 | $158.00 | $175.93 | $200.00 | $210.00 |
| 0270 | Asphalt concrete friction course,traffic B, FC-12.5, PG (0337-7-81) | TN | 490.30 | $190.00 | $142.00 | $145.00 | $161.45 | $187.00 | $195.00 |
| 0275 | Miscellaneous asphalt (0339-1) | TN | 16 | $500.00 | $250.00 | $250.00 | $278.36 | $320.00 | $1,000.00 |
| 0280 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 3 | $7,500.00 | $4,995.00 | $4,995.00 | $5,561.72 | $6,500.00 | $7,200.00 |
| 0285 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 4 | $8,000.00 | $5,833.20 | $5,833.20 | $6,495.02 | $7,500.00 | $7,900.00 |
| 0290 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 113 | $265.00 | $96.30 | $96.30 | $107.23 | $125.00 | $225.00 |
| 0295 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 4 | $3,500.00 | $2,426.00 | $2,426.00 | $2,701.25 | $3,000.00 | $4,000.00 |
| 0300 | Shoulder gutter- concrete (0520-6) | LF | 446 | $80.00 | $45.00 | $40.00 | $105.82 | $75.00 | $80.00 |
| 0305 | Concrete ditch pavement, non reinforced, 4" (0524-1-2) | SY | 95 | $135.00 | $120.00 | $65.00 | $177.47 | $160.00 | $150.00 |
| 0310 | Guardrail -roadway, general (0536-1-1) | LF | 449 | $28.50 | $26.00 | $26.00 | $28.66 | $44.00 | $26.00 |
| 0315 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 4 | $4,000.00 | $3,500.00 | $3,500.00 | $3,858.13 | $5,900.00 | $3,500.00 |
| 0320 | Guardrail removal (0536-73) | LF | 859 | $6.50 | $2.00 | $2.00 | $2.20 | $4.00 | $2.00 |
| 0325 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 4 | $3,500.00 | $3,200.00 | $3,200.00 | $3,527.44 | $5,500.00 | $3,200.00 |
| 0330 | Performance turf, sod (0570-1-2) | SY | 7,421 | $3.50 | $3.75 | $4.00 | $6.61 | $9.00 | $7.00 |
| 0335 | Raised pavement marker, type B (0706-1-3) | EACH | 840 | $5.25 | $4.50 | $4.50 | $5.51 | $8.00 | $4.50 |
| 0340 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.76 | $2,500.00 | $1,500.00 | $1,500.00 | $2,204.64 | $2,400.00 | $1,500.00 |
| 0345 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 14 | $11.00 | $2.00 | $2.00 | $11.02 | $5.00 | $2.00 |
| 0350 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.76 | $2,200.00 | $1,500.00 | $1,500.00 | $2,204.64 | $2,600.00 | $1,500.00 |
| 0355 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 1.00 | $5,000.00 | $4,180.10 | $4,180.10 | $8,206.42 | $5,500.00 | $3,200.00 |
| 0360 | Single column ground sign assembly, relocate (0700-1500) | EACH | 5 | $80.00 | $100.00 | $0.00 | $358.26 | $250.00 | $309.00 |
| 0365 | Single column ground sign assembly, remove (0700-1600) | EACH | 2 | $55.00 | $100.00 | $500.00 | $330.70 | $200.00 | $66.00 |
| 0370 | Raised pavement marker, type B (0706-1-3) | EACH | 102 | $5.25 | $4.50 | $4.50 | $5.51 | $9.00 | $4.50 |
| 0375 | Painted pavement markings, surface (0710-90) | LS | 1 | $4,000.00 | $4,085.00 | $4,085.00 | $3,858.13 | $40,000 | $4,085.00 |
| 0380 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 41 | $16.00 | $10.00 | $10.00 | $16.53 | $13.00 | $10.00 |
| 0385 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.71 | $6,100.00 | $5,800.00 | $5,800.00 | $6,201.92 | $11,000 | $5,800.00 |
| 0390 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.54 | $6,100.00 | $5,800.00 | $5,800.00 | $6,035.22 | $11,000 | $5,800.00 |
| 0395 | Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231) | GM | 0.14 | $2,800.00 | $2,200.00 | $2,200.00 | $2,736.24 | $4,350.00 | $2,200.00 |
| 0400 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.09 | $48,000 | $35,000 | $35,000 | $49,059 | $56,000 | $35,000 |
| 0405 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.09 | $48,000 | $35,000 | $35,000 | $49,059 | $56,000 | $35,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.