FDOT letting results, January 28, 2026
16 contracts let by Florida DOT on January 28, 2026, $98,080,687 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 16
- Low bids, total
- $98,080,687
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T3988 | SR 8 (I-10) FROM W OF OLD BAINBRIDGE RD TO W OF OLSON RD | District 3 | 3 | Anderson Columbia Co., Inc. | $14,399,889 | $17,644,184 | +23% | FDOT |
| T5875 | SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 730077 | District 5 | 6 | C.W. Roberts Contracting, Inc. | $12,582,375 | $13,653,497 | +9.0% | FDOT |
| T1922 | SR 684 (CORTEZ RD) FROM 86TH ST W TO W OF 30TH ST W | District 1 | 4 | Superior Asphalt, Inc. | $12,497,735 | $12,817,585 | +3.0% | FDOT |
| T2A56 | SR 202 AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF | District 2 | 5 | De Moya Contracting LLC | $10,949,338 | $12,108,205 | +11% | FDOT |
| T5874 | SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ... | District 5 | 5 | Masci General Contractors, Inc | $9,523,246 | $10,254,120 | +8.0% | FDOT |
| T7577 | SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RD | District 7 | 7 | Watson Civil Construction, Inc. | $9,471,911 | $9,518,859 | 0.0% | FDOT |
| T3929 | CR 274 OVER TENMILE CREEK BRIDGE NO. 470035 | District 3 | 7 | Anderson Columbia Co., Inc. | $5,763,181 | $6,237,905 | +8.0% | FDOT |
| T2A54 | SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF... | District 2 | 5 | Preferred Materials Inc. | $4,940,379 | $5,759,135 | +17% | FDOT |
| T3990 | SR 30 (US 98) FROM WAKULLA CO LINE TO TAYLOR CO LINE | District 3 | 5 | Anderson Columbia Co., Inc. | $4,358,438 | $4,776,153 | +10% | FDOT |
| T3954 | KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 484060 | District 3 | 3 | Murphree Bridge Corporation | $2,666,435 | $2,706,899 | +2.0% | FDOT |
| T2A49 | SR 228 (NORMANDY BLVD) FROM S OF MEMORIAL PARK RD TO SR... | District 2 | 5 | Preferred Materials Inc. | $2,497,014 | $2,725,137 | +9.0% | FDOT |
| T6618 | SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVE | District 6 | 5 | Weekley Asphalt Paving, Inc. | $2,189,486 | $2,227,843 | +2.0% | FDOT |
| T4749 | SR 862 (i-595) FROM SB I-95 OFF RAMP TO WB I-595 | District 4 | 3 | Cone & Graham, Inc. | $1,934,012 | $1,999,640 | +3.0% | FDOT |
| T4750 | SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RD | District 4 | 11 | Carr Construction, LLC | $1,856,551 | $1,874,958 | +1.0% | FDOT |
| T7579 | SR 600 (US 92 / HILLSBOROUGH AVE) FROM W OF N 39TH ST TO... | District 7 | 6 | Preferred Materials Inc. | $1,641,667 | $1,774,727 | +8.0% | FDOT |
| T7580 | SR 574 (W REYNOLDS ST) FROM E OF SR 39 TO W OF US 92 | District 7 | 4 | Aj General Construction Services, Inc. | $809,030 | $1,185,026 | +46% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.