FDOT letting results, January 28, 2026

16 contracts let by Florida DOT on January 28, 2026, $98,080,687 in low bids, a median of 5 bidders per contract.

Owner
Florida DOT
Contracts
16
Low bids, total
$98,080,687
Data through
28 OCT 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
T3988SR 8 (I-10) FROM W OF OLD BAINBRIDGE RD TO W OF OLSON RDDistrict 33Anderson Columbia Co., Inc.$14,399,889$17,644,184+23%FDOT
T5875SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 730077District 56C.W. Roberts Contracting, Inc.$12,582,375$13,653,497+9.0%FDOT
T1922SR 684 (CORTEZ RD) FROM 86TH ST W TO W OF 30TH ST WDistrict 14Superior Asphalt, Inc.$12,497,735$12,817,585+3.0%FDOT
T2A56SR 202 AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OFDistrict 25De Moya Contracting LLC$10,949,338$12,108,205+11%FDOT
T5874SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ...District 55Masci General Contractors, Inc$9,523,246$10,254,120+8.0%FDOT
T7577SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RDDistrict 77Watson Civil Construction, Inc.$9,471,911$9,518,8590.0%FDOT
T3929CR 274 OVER TENMILE CREEK BRIDGE NO. 470035District 37Anderson Columbia Co., Inc.$5,763,181$6,237,905+8.0%FDOT
T2A54SR 5 (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...District 25Preferred Materials Inc.$4,940,379$5,759,135+17%FDOT
T3990SR 30 (US 98) FROM WAKULLA CO LINE TO TAYLOR CO LINEDistrict 35Anderson Columbia Co., Inc.$4,358,438$4,776,153+10%FDOT
T3954KLONDIKE RD OVER UNNAMED BRANCH BRIDGE NO 484060District 33Murphree Bridge Corporation$2,666,435$2,706,899+2.0%FDOT
T2A49SR 228 (NORMANDY BLVD) FROM S OF MEMORIAL PARK RD TO SR...District 25Preferred Materials Inc.$2,497,014$2,725,137+9.0%FDOT
T6618SR 934 (71ST ST) FROM BAY DR E TO COLLINS AVEDistrict 65Weekley Asphalt Paving, Inc.$2,189,486$2,227,843+2.0%FDOT
T4749SR 862 (i-595) FROM SB I-95 OFF RAMP TO WB I-595District 43Cone & Graham, Inc.$1,934,012$1,999,640+3.0%FDOT
T4750SR 5 (US 1) FROM MIDWAY RD TO S OF EDWARDS RDDistrict 411Carr Construction, LLC$1,856,551$1,874,958+1.0%FDOT
T7579SR 600 (US 92 / HILLSBOROUGH AVE) FROM W OF N 39TH ST TO...District 76Preferred Materials Inc.$1,641,667$1,774,727+8.0%FDOT
T7580SR 574 (W REYNOLDS ST) FROM E OF SR 39 TO W OF US 92District 74Aj General Construction Services, Inc.$809,030$1,185,026+46%FDOT
FDOT contracts let on January 28, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy