FDOT contract T7577 bid tabulation
SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RD. Let by Florida DOT on January 28, 2026, Hernando, District 7. 7 bids received; low bid $9,471,911 by Watson Civil Construction, Inc..
- Owner
- Florida DOT
- Letting
- 28 JAN 2026
- Pay items
- 179
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Watson Civil Construction, Inc. | $9,471,911 | Low |
| 2 | Preferred Materials Inc. | $9,518,859 | 0.0% |
| 3 | C.W. Roberts Contracting, Inc. | $9,589,490 | +1.0% |
| 4 | Gosalia Concrete Constructors, Inc. | $9,767,819 | +3.0% |
| 5 | De Moya Contracting LLC | $10,321,933 | +9.0% |
| 6 | Ajax Paving Industries of Florida LLC | $10,969,113 | +16% |
| 7 | Commercial Industrial Corp. | $14,502,750 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Watson Civil Construction, Inc. | 2. Preferred Materials Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Gosalia Concrete Constructors, Inc. | 5. De Moya Contracting LLC | 6. Ajax Paving Industries of Florida LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $945,000 | $1,062,467 | $894,822 | $750,000 | $1,000,000 | $1,080,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $855,500 | $574,548 | $364,088 | $425,000 | $750,000 | $819,170 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $252,000 | $175,148 | $193,558 | $150,001 | $765,000 | $325,000 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $506,000 | $238,043 | $297,595 | $550,000 | $530,000 | $375,000 |
| 0025 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $16,500 | $1,267.00 | $32,567 | $8,998.63 | $20,000 | $17,471 |
| 0030 | Pedestrian escort/flagger (0102-5) | HR | 912 | $29.00 | $16.60 | $36.55 | $138.74 | $20.00 | $76.17 |
| 0035 | Traffic control officer (0102-14) | HR | 806 | $120.00 | $89.02 | $94.56 | $85.00 | $90.00 | $114.25 |
| 0040 | Work zone sign (0102-60) | ED | 30,656 | $0.33 | $0.21 | $0.22 | $0.21 | $0.19 | $0.21 |
| 0045 | Business sign (0102-61) | EACH | 3 | $47.00 | $50.07 | $51.04 | $45.00 | $45.00 | $48.96 |
| 0050 | Barrier mounted work zone sign- index 700-013 (0102-62-13) | ED | 736 | $1.00 | $0.72 | $0.74 | $0.65 | $0.65 | $0.71 |
| 0055 | Temporary barrier, F&I, low profile, concrete (0102-71-13) | LF | 3,023 | $41.00 | $36.72 | $38.74 | $20.00 | $20.00 | $43.52 |
| 0060 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 600 | $35.00 | $34.49 | $36.39 | $31.00 | $21.00 | $36.78 |
| 0065 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 2,710 | $22.00 | $31.16 | $32.87 | $5.00 | $18.00 | $22.85 |
| 0070 | Temporary barrier, relocate, low profile concrete (0102-71-23) | LF | 7,554 | $12.50 | $17.80 | $18.78 | $8.00 | $12.00 | $13.06 |
| 0075 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 540 | $13.50 | $17.80 | $18.78 | $15.00 | $12.00 | $14.15 |
| 0080 | Temporary barrier, relocate, free standing (0102-71-26) | LF | 2,380 | $8.20 | $15.58 | $16.44 | $5.00 | $10.00 | $8.70 |
| 0085 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 75,908 | $0.14 | $0.10 | $0.10 | $0.09 | $0.09 | $0.10 |
| 0090 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 5,012 | $0.05 | $0.03 | $0.03 | $0.03 | $0.03 | $0.03 |
| 0095 | Temporary separator, F&I remove (0102-75-1) | LF | 1,845 | $22.00 | $20.03 | $20.42 | $40.00 | $18.00 | $19.59 |
| 0100 | Arrow board / advance warning arrow panel (0102-76) | ED | 132 | $7.00 | $4.45 | $4.54 | $4.00 | $4.00 | $4.35 |
| 0105 | Temporary crash cushion, redirective option (0102-89-1) | LO | 18 | $860.00 | $918.00 | $935.84 | $400.00 | $1,800.00 | $1,088.10 |
| 0110 | Portable changeable message sign, temporary (0102-99) | ED | 1,792 | $15.00 | $10.01 | $10.21 | $10.00 | $9.00 | $9.79 |
| 0115 | Temporary signalization and maintenance, intersection (0102-104) | ED | 310 | $40.00 | $27.82 | $30.99 | $23.61 | $134.00 | $27.20 |
| 0120 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 310 | $35.00 | $22.25 | $24.79 | $23.61 | $1.00 | $21.76 |
| 0125 | Type III barricade (0102-115) | ED | 4,082 | $0.45 | $0.33 | $0.34 | $0.30 | $0.30 | $0.33 |
| 0130 | Portable regulatory, sign (0102-150-1) | ED | 176 | $7.00 | $5.56 | $5.67 | $5.00 | $5.00 | $5.44 |
| 0135 | Radar speed display unit (0102-150-2) | ED | 752 | $7.00 | $5.56 | $5.67 | $5.00 | $5.00 | $5.44 |
| 0140 | Removable tape, black, solid 6" (0102-913-11) | GM | 1.21 | $12,800 | $13,806 | $14,057 | $12,407 | $12,500 | $13,601 |
| 0145 | Removable tape, black, 10'-30', 6'-10', or 2'-4' skip (0102-913-12) | GM | 0.65 | $4,400.00 | $4,700.17 | $6,803.75 | $4,224.01 | $6,000.00 | $6,528.57 |
| 0150 | Removable tape, white, solid 6" (0102-913-21) | GM | 3.14 | $12,900 | $13,874 | $14,189 | $12,468 | $12,500 | $13,601 |
| 0155 | Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22) | GM | 0.65 | $4,400.00 | $4,700.17 | $6,803.75 | $4,224.01 | $6,000.00 | $6,528.57 |
| 0160 | Removable tape, white, 24" stop bar (0102-913-23) | LF | 846 | $15.00 | $15.58 | $8.99 | $14.00 | $8.00 | $8.70 |
| 0165 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 1,888 | $7.30 | $7.79 | $4.49 | $7.00 | $4.00 | $4.35 |
| 0170 | Removable tape, white, symbol or arrow (0102-913-29) | EACH | 62 | $516.00 | $556.36 | $449.46 | $500.00 | $400.00 | $435.24 |
| 0175 | Removable tape, yellow, solid, (0102-913-31) | GM | 1.83 | $13,000 | $13,886 | $14,099 | $12,480 | $12,500 | $13,601 |
| 0180 | Removable tape, yellow, 10'-30', 9', 6'-10', or 2'-4' skip (0102-913-32) | GM | 0.15 | $4,200.00 | $4,473.45 | $6,832.97 | $4,020.27 | $6,000.00 | $6,528.57 |
| 0185 | Artificial coverings /rolled erosion control products (0104-1) | SY | 235 | $6.80 | $8.01 | $11.12 | $6.00 | $6.00 | $6.53 |
| 0190 | Sediment barrier (0104-10-3) | LF | 1,952 | $1.30 | $1.45 | $1.47 | $2.45 | $3.00 | $0.98 |
| 0195 | Soil tracking prevention device (0104-15) | EACH | 2 | $5,900.00 | $1,462.00 | $2,975.71 | $4,400.00 | $4,200.00 | $6,300.92 |
| 0200 | Inlet protection system (0104-18) | EACH | 7 | $115.00 | $155.78 | $153.25 | $245.25 | $200.00 | $179.54 |
| 0205 | Litter removal (0107-1) | ACRE | 160.70 | $47.00 | $94.58 | $94.56 | $50.00 | $35.00 | $119.02 |
| 0210 | Mowing (0107-2) | ACRE | 131.12 | $130.00 | $139.09 | $139.05 | $50.00 | $50.00 | $145.65 |
| 0215 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $235,000 | $109,216 | $17,432 | $101,352 | $300,000 | $737,248 |
| 0220 | Removal of existing concrete (0110-4-10) | SY | 278 | $32.00 | $50.42 | $76.77 | $41.66 | $80.00 | $86.01 |
| 0225 | Regular excavation (0120-1) | CY | 1,373.20 | $25.00 | $13.52 | $36.86 | $61.80 | $30.00 | $47.94 |
| 0230 | Subsoil excavation (0120-4) | CY | 3,176.20 | $34.00 | $16.91 | $21.70 | $35.18 | $30.00 | $67.50 |
| 0235 | Embankment (0120-6) | CY | 4,886.70 | $28.00 | $23.04 | $29.35 | $44.91 | $45.00 | $61.79 |
| 0240 | Type B stabilization (0160-4) | SY | 8,457 | $24.00 | $31.27 | $14.60 | $44.03 | $30.00 | $26.07 |
| 0245 | Optional base, base group 07 (0285-707) | SY | 2,717 | $64.00 | $56.80 | $77.23 | $101.63 | $50.00 | $56.92 |
| 0250 | Optional base, base group 09 (0285-709) | SY | 509 | $78.00 | $65.69 | $75.63 | $99.71 | $80.00 | $95.13 |
| 0255 | Milling existing asphalt pavement, 1" avg depth (0327-70-1) | SY | 210 | $17.90 | $23.78 | $13.23 | $13.78 | $30.00 | $3.94 |
| 0260 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 3,078 | $9.70 | $6.51 | $8.26 | $8.59 | $10.00 | $8.51 |
| 0265 | Milling existing asphalt pavement, 4" avg depth (0327-70-7) | SY | 2,484 | $12.00 | $3.57 | $5.14 | $5.31 | $10.00 | $12.11 |
| 0270 | Milling existing asphalt pavement, 1 1/4" avg depth (0327-70-12) | SY | 177 | $18.10 | $28.21 | $15.70 | $16.34 | $50.00 | $9.96 |
| 0275 | Milling existing asphalt pavement, 1 3/4" avg depth (0327-70-13) | SY | 6,024 | $3.55 | $3.76 | $5.61 | $5.83 | $10.00 | $9.07 |
| 0280 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 7,533 | $4.55 | $3.44 | $4.92 | $5.09 | $10.00 | $12.30 |
| 0285 | Milling exist asphalt pavement and limerock 12.5" (0327-70113) | SY | 13,388 | $12.00 | $19.32 | $21.38 | $16.10 | $35.00 | $13.44 |
| 0290 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 165.20 | $206.00 | $250.32 | $192.25 | $205.49 | $250.00 | $310.64 |
| 0295 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 3,987.80 | $216.00 | $245.31 | $161.13 | $165.51 | $200.00 | $218.62 |
| 0300 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 1,959.20 | $208.00 | $261.74 | $169.32 | $173.95 | $180.00 | $213.01 |
| 0305 | Plain cement concrete 9.5" (0350-3-8) | SY | 14,179 | $148.00 | $174.95 | $217.97 | $199.00 | $119.00 | $164.21 |
| 0310 | Cleaning & sealing joints- concrete pavement (0350-5) | LF | 18,784 | $6.40 | $6.68 | $4.40 | $3.99 | $15.00 | $5.17 |
| 0315 | Grinding concrete pavement (0352-70) | SY | 14,179 | $7.05 | $7.39 | $5.08 | $4.79 | $15.00 | $5.21 |
| 0320 | Inlets, DT bot, type B, <10' (0425-1511) | EACH | 1 | $7,700.00 | $14,051 | $14,673 | $16,642 | $20,000 | $18,941 |
| 0325 | Inlets, DT bot, type B, >10' (0425-1512) | EACH | 1 | $11,000 | $17,391 | $24,786 | $16,642 | $20,000 | $23,060 |
| 0330 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 1 | $4,800.00 | $7,116.87 | $9,965.37 | $11,768 | $20,000 | $16,023 |
| 0335 | Inlets, DT bot, type F, <10' (0425-1561) | EACH | 1 | $6,200.00 | $8,649.20 | $10,823 | $12,541 | $20,000 | $16,862 |
| 0340 | Manholes, P-7, <10' (0425-2-41) | EACH | 1 | $5,600.00 | $12,154 | $10,961 | $12,687 | $20,000 | $16,997 |
| 0345 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 26 | $225.00 | $199.31 | $217.18 | $347.95 | $300.00 | $551.49 |
| 0350 | Pipe culvert, opt material, round, 36"S/CD (0430-175136) | LF | 16 | $778.00 | $488.74 | $1,388.53 | $425.73 | $400.00 | $947.48 |
| 0355 | Pipe culvert,optional material,other-elip/arch, (0430-175218) | LF | 172 | $246.00 | $307.40 | $353.90 | $368.42 | $400.00 | $305.32 |
| 0360 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 3 | $2,200.00 | $3,777.97 | $5,984.68 | $10,841 | $10,000 | $3,554.26 |
| 0365 | Underdrain, type V (0440-1-50) | LF | 282 | $77.00 | $105.75 | $122.98 | $110.46 | $105.00 | $81.61 |
| 0370 | Underdrain outlet pipe, 6" (0440-73-2) | LF | 90 | $64.00 | $73.52 | $106.25 | $311.56 | $60.00 | $41.35 |
| 0375 | Edgedrain draincrete, (0446-1-1) | LF | 3,073 | $39.00 | $37.83 | $56.47 | $83.84 | $38.00 | $55.72 |
| 0380 | Edgedrain outlet pipe, 4" (0446-71-1) | LF | 200 | $68.00 | $37.83 | $191.99 | $352.57 | $102.00 | $37.00 |
| 0385 | Concrete curb & gutter, type E (0520-1-7) | LF | 414 | $76.00 | $52.90 | $150.22 | $102.77 | $41.00 | $141.77 |
| 0390 | Curb-concrete pavement joint (0520-4) | LF | 423 | $5.15 | $18.55 | $16.94 | $12.90 | $10.00 | $15.18 |
| 0395 | Shoulder gutter- concrete (0520-6) | LF | 237 | $51.00 | $53.21 | $97.78 | $82.44 | $50.00 | $64.92 |
| 0400 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 48 | $181.00 | $140.20 | $231.84 | $157.27 | $150.00 | $203.32 |
| 0405 | Concrete ditch pavement, 6", reinforced (0524-1-49) | SY | 237 | $85.00 | $171.50 | $143.26 | $122.15 | $175.00 | $254.06 |
| 0410 | Detectable warnings (0527-2) | SF | 92 | $68.00 | $31.88 | $50.82 | $47.86 | $41.00 | $21.76 |
| 0415 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 3.80 | $409.00 | $286.85 | $211.65 | $987.48 | $200.00 | $841.74 |
| 0420 | Bedding stone (0530-74) | TN | 2.80 | $517.00 | $255.61 | $325.19 | $555.52 | $200.00 | $1,107.66 |
| 0425 | Performance turf, sod (0570-1-2) | SY | 23,503 | $5.60 | $3.20 | $4.86 | $5.88 | $6.00 | $5.73 |
| 0430 | Conduit, furnish & install, open trench (0630-2-11) | LF | 43 | $19.60 | $21.42 | $23.86 | $20.35 | $22.00 | $20.95 |
| 0435 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 88 | $36.00 | $38.95 | $43.39 | $34.37 | $32.50 | $38.08 |
| 0440 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 2 | $1,620.00 | $1,770.61 | $1,972.71 | $1,534.20 | $1,393.00 | $1,731.41 |
| 0445 | Traffic monitoring site vehicle sensor-non-weight, furnish & install (0695-1-1) | EACH | 4 | $2,800.00 | $3,008.98 | $3,352.44 | $4,033.55 | $3,011.00 | $2,942.37 |
| 0450 | Traffic monitoring site inductive loop assembly, & install, 2 loops (0695-6-12) | EACH | 4 | $2,450.00 | $2,642.73 | $2,944.38 | $2,050.62 | $2,400.00 | $2,584.23 |
| 0455 | Traffic monitoring site cabinet, F&I, type 3, 2 pane back, pedestal mount (0695-7162) | EACH | 1 | $7,000.00 | $7,587.57 | $8,453.64 | $7,104.94 | $8,301.60 | $7,528.41 |
| 0460 | Traffic monitoring site cabinet, remove existing cabinet (0695-7600) | EACH | 1 | $1,050.00 | $1,112.73 | $1,239.74 | $675.56 | $1,428.00 | $1,088.10 |
| 0465 | Raised pavement marker, type B (0706-1-3) | EACH | 4,197 | $4.70 | $5.01 | $5.62 | $4.50 | $5.00 | $5.44 |
| 0470 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 6.15 | $2,600.00 | $2,779.56 | $1,799.30 | $2,497.97 | $1,600.00 | $1,740.95 |
| 0475 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.17 | $3,450.00 | $3,689.24 | $2,010.76 | $3,315.50 | $1,800.00 | $1,958.57 |
| 0480 | Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123) | LF | 1,663 | $1.90 | $2.00 | $1.12 | $1.80 | $1.00 | $1.09 |
| 0485 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 178 | $2.00 | $2.11 | $2.25 | $1.90 | $2.00 | $2.18 |
| 0490 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 1,168 | $2.10 | $2.23 | $3.37 | $2.00 | $3.00 | $3.26 |
| 0495 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 2.33 | $540.00 | $582.42 | $1,125.10 | $523.42 | $1,000.00 | $1,088.10 |
| 0500 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.28 | $710.00 | $793.05 | $1,144.07 | $687.27 | $1,000.00 | $1,088.10 |
| 0505 | Painted pavement markings, standard, white, message or symbol (0710-11160) | EACH | 8 | $51.60 | $55.64 | $95.51 | $50.00 | $85.00 | $92.49 |
| 0510 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 30 | $51.60 | $55.64 | $50.56 | $50.00 | $45.00 | $48.96 |
| 0515 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 4.61 | $2,600.00 | $2,780.01 | $1,796.67 | $2,498.37 | $1,600.00 | $1,740.95 |
| 0520 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 73 | $1.95 | $2.06 | $3.37 | $1.85 | $3.00 | $3.26 |
| 0525 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 0.20 | $700.00 | $751.22 | $1,140.76 | $675.13 | $1,000.00 | $1,088.10 |
| 0530 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 |
| 0535 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.04 | $4,000.00 | $5,888.71 | $6,464.38 | $6,765.97 | $3,000.00 | $2,285.00 |
| 0540 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 9 | $585.00 | $637.94 | $648.79 | $323.95 | $500.00 | $623.82 |
| 0545 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 6 | $1,270.00 | $1,371.27 | $1,394.59 | $1,891.48 | $1,800.00 | $1,340.91 |
| 0550 | Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113) | EACH | 2 | $2,200.00 | $2,374.95 | $2,415.34 | $2,043.70 | $2,400.00 | $2,323.46 |
| 0555 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $357.00 | $389.46 | $396.08 | $337.78 | $500.00 | $380.83 |
| 0560 | Single column ground sign assembly, remove (0700-1600) | EACH | 17 | $255.00 | $278.18 | $282.91 | $84.44 | $35.00 | $272.02 |
| 0565 | Multi-column ground sign assembly, F&I ground mount, 30.0 SF (0700-2113) | EACH | 2 | $4,100.00 | $4,382.26 | $4,456.79 | $6,311.25 | $5,500.00 | $4,285.25 |
| 0570 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $6,500.00 | $7,024.31 | $7,143.77 | $7,007.41 | $8,500.00 | $6,868.81 |
| 0575 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 1 | $7,900.00 | $8,589.35 | $8,735.44 | $9,268.15 | $10,000 | $8,399.21 |
| 0580 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $1,550.00 | $1,669.09 | $1,697.48 | $1,125.93 | $1,500.00 | $1,632.14 |
| 0585 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 1 | $4,500.00 | $4,859.28 | $4,941.92 | $4,629.63 | $6,000.00 | $4,751.71 |
| 0590 | Sign panel, install, 51-100 SF (0700-3405) | EACH | 1 | $1,750.00 | $1,891.64 | $1,923.81 | $2,251.85 | $5,575.00 | $1,849.76 |
| 0595 | Sign panel, remove, UP to 12 SF (0700-3601) | EACH | 1 | $255.00 | $278.18 | $282.91 | $112.59 | $25.00 | $272.02 |
| 0600 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 2 | $280.00 | $306.00 | $311.21 | $450.37 | $750.00 | $299.23 |
| 0605 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 3 | $134.00 | $317.13 | $222.48 | $109.14 | $125.00 | $136.12 |
| 0610 | Profiled thermoplastic,standard- concrete surfaces, white, solid,6" (0701-17101) | GM | 0.27 | $15,300 | $16,314 | $13,687 | $14,662 | $12,000 | $13,057 |
| 0615 | Profiled thermoplastic,standard- concrete surfaces, yellow, solid,6" (0701-17201) | GM | 0.26 | $15,200 | $16,236 | $13,641 | $14,591 | $12,000 | $13,057 |
| 0620 | Object marker, type 1 (0705-10-1) | EACH | 2 | $320.00 | $166.91 | $556.21 | $271.11 | $350.00 | $281.45 |
| 0625 | Raised pavement marker, type B (0706-1-3) | EACH | 538 | $4.70 | $5.01 | $5.62 | $4.50 | $5.00 | $5.44 |
| 0630 | Painted pavement markings, standard, yellow, island nose (0710-11290) | SF | 40 | $5.20 | $5.56 | $11.24 | $5.00 | $10.00 | $10.88 |
| 0635 | Painted pavement markings, surface (0710-90) | LS | 1 | $13,000 | $13,958 | $15,282 | $12,544 | $10,000 | $10,881 |
| 0640 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 31 | $16.00 | $16.69 | $11.24 | $15.00 | $10.00 | $10.88 |
| 0645 | Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141) | GM | 0.06 | $2,600.00 | $3,278.57 | $5,417.68 | $2,455.36 | $4,500.00 | $4,896.43 |
| 0650 | Thermoplastic, standard, arrow (0711-11170) | EACH | 4 | $171.00 | $183.60 | $140.46 | $165.00 | $125.00 | $136.01 |
| 0655 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 28 | $10.50 | $11.13 | $8.99 | $10.00 | $8.00 | $8.70 |
| 0660 | Thermoplastic, preformed, white, 2-4 dotted guideline on concrete surfaces (0711-14141) | GM | 0.12 | $8,000.00 | $8,606.92 | $16,855 | $7,735.00 | $15,000 | $16,321 |
| 0665 | Thermoplastic, preformed, yellow, 2-4 dotted guideline on concrete surfaces (0711-14241) | GM | 0.04 | $6,900.00 | $9,836.57 | $19,263 | $6,630.00 | $15,000 | $16,321 |
| 0670 | Thermoplastic, preformed, black, 2-4 dotted guideline on concrete surfaces (0711-14341) | GM | 0.13 | $7,500.00 | $8,741.41 | $17,118 | $7,251.56 | $15,000 | $16,321 |
| 0675 | Thermoplastic, preformed, 24" white with 4" black contrast crosswalk on concrete pavement, 32" (0711-14526) | LF | 750 | $22.00 | $23.37 | $39.33 | $21.00 | $35.00 | $38.08 |
| 0680 | Thermoplastic, preformed, 24" white with 4" black contrast stop line on concrete 32" (0711-14527) | LF | 176 | $22.00 | $23.37 | $39.33 | $21.00 | $35.00 | $38.08 |
| 0685 | Thermoplastic, preformed, 12" white with 4" black contrast crosswalk on concrete pavement, 20" (0711-14528) | LF | 926 | $14.50 | $15.58 | $22.47 | $14.00 | $20.00 | $21.76 |
| 0690 | Thermoplastic, preformed, white with black contrast on concrete pavement, message symbol (0711-14560) | EACH | 2 | $750.00 | $806.73 | $1,348.38 | $725.00 | $1,200.00 | $1,305.71 |
| 0695 | Thermoplastic, preformed, white with black contrast, arrow on concrete surface (0711-14570) | EACH | 26 | $620.00 | $667.64 | $898.92 | $600.00 | $800.00 | $870.48 |
| 0700 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.36 | $6,250.00 | $6,699.84 | $6,667.83 | $6,021.10 | $6,000.00 | $6,528.57 |
| 0705 | Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131) | GM | 1.06 | $1,600.00 | $1,690.39 | $5,046.90 | $1,519.13 | $4,500.00 | $4,896.43 |
| 0710 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.43 | $6,200.00 | $6,632.17 | $6,757.62 | $5,960.28 | $6,000.00 | $6,528.57 |
| 0715 | Permanent tape, white, solid W/contrast, 6" primary line width, for concrete surfaces (0713-103121) | GM | 0.58 | $44,000 | $47,221 | $68,229 | $42,438 | $60,000 | $65,286 |
| 0720 | Permanent tape, white, 6-10 skip/dotted, 6" for concrete surfaces (0713-103141) | GM | 0.06 | $15,800 | $16,950 | $12,842 | $15,233 | $12,000 | $13,057 |
| 0725 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.44 | $11,000 | $11,840 | $13,453 | $10,641 | $12,000 | $13,057 |
| 0730 | Permanent tape, black, 6-10 dotted extension, 6" for concrete surfaces (0713-103341) | GM | 0.06 | $15,800 | $16,950 | $12,842 | $15,233 | $12,000 | $13,057 |
| 0735 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.44 | $11,000 | $11,760 | $13,362 | $10,569 | $12,000 | $13,057 |
| 0740 | Conduit, furnish & install, open trench (0630-2-11) | LF | 81 | $11.50 | $12.52 | $13.95 | $21.83 | $19.00 | $12.24 |
| 0745 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 297 | $25.50 | $27.82 | $30.99 | $34.37 | $30.50 | $27.20 |
| 0750 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 45 | $36.00 | $38.95 | $43.39 | $44.00 | $47.00 | $38.08 |
| 0755 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 14 | $1,620.00 | $1,770.61 | $1,972.71 | $1,550.90 | $2,454.00 | $1,731.41 |
| 0760 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $4,800.00 | $5,229.82 | $5,826.77 | $5,398.48 | $8,528.00 | $5,114.05 |
| 0765 | Electrical service wire, & install (0639-2-1) | LF | 57 | $20.40 | $22.25 | $24.79 | $15.05 | $14.00 | $21.76 |
| 0770 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $3,100.00 | $3,321.49 | $3,700.62 | $2,419.00 | $2,895.00 | $3,247.96 |
| 0775 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 3,213 | $3.10 | $3.34 | $3.72 | $2.45 | $3.05 | $3.26 |
| 0780 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 57 | $3.60 | $3.89 | $4.34 | $4.09 | $4.65 | $3.81 |
| 0785 | Load center, F&I, secondary voltage (0715-7-11) | EACH | 1 | $21,500 | $23,028 | $25,656 | $23,193 | $17,729 | $22,518 |
| 0790 | Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 15' arm length (0715-61252) | EACH | 5 | $10,000 | $10,923 | $12,170 | $8,856.79 | $9,478.00 | $10,681 |
| 0795 | Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266) | EACH | 3 | $11,500 | $12,568 | $14,002 | $10,760 | $10,775 | $12,289 |
| 0800 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 8 | $900.00 | $978.03 | $1,089.67 | $773.09 | $905.00 | $956.38 |
| 0805 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,589 | $13.20 | $14.35 | $15.99 | $19.19 | $22.00 | $14.04 |
| 0810 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 1,275 | $34.00 | $36.72 | $40.91 | $41.57 | $39.50 | $35.91 |
| 0815 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $10,800 | $11,759 | $13,102 | $13,415 | $12,519 | $11,499 |
| 0820 | Signal cable- repair/replace/other, furnish & install (0632-7-2) | LF | 2,354 | $6.70 | $7.23 | $8.06 | $7.81 | $8.50 | $7.07 |
| 0825 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $1,740.00 | $1,891.64 | $2,107.56 | $226.67 | $1,724.00 | $1,849.76 |
| 0830 | Signal cable, remove- outside intersection (0632-7-7) | LF | 2,374 | $1.30 | $1.39 | $1.55 | $1.91 | $4.55 | $1.36 |
| 0835 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 28 | $1,650.00 | $1,770.61 | $1,972.71 | $1,488.62 | $1,393.00 | $1,731.41 |
| 0840 | Aluminum signals pole, (0646-1-11) | EACH | 5 | $2,900.00 | $3,171.91 | $3,533.96 | $2,804.20 | $2,716.00 | $3,101.69 |
| 0845 | Aluminum signals pole, remove (0646-1-60) | EACH | 8 | $560.00 | $612.00 | $681.86 | $450.37 | $345.00 | $598.45 |
| 0850 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 2 | $1,150.00 | $1,226.73 | $1,366.75 | $951.73 | $1,001.00 | $1,199.57 |
| 0855 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 3 | $1,950.00 | $2,095.09 | $2,334.23 | $1,771.36 | $2,073.00 | $2,048.71 |
| 0860 | Loop detector inductive, F&I, type 11, 4 CH, SS, RM (0660-1111) | EACH | 2 | $750.00 | $819.95 | $913.54 | $1,169.38 | $630.00 | $801.80 |
| 0865 | Loop assembly, F&I, type B (0660-2102) | AS | 8 | $1,650.00 | $1,774.80 | $1,977.38 | $1,747.41 | $1,716.00 | $1,735.51 |
| 0870 | Loop assembly, F&I, type F (0660-2106) | AS | 12 | $2,100.00 | $2,247.71 | $2,504.27 | $2,143.70 | $1,518.00 | $2,197.95 |
| 0875 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $385.00 | $418.01 | $465.72 | $621.48 | $353.00 | $408.75 |
| 0880 | Traffic controller, modify (0671-2-40) | EACH | 1 | $3,600.00 | $3,894.55 | $4,339.08 | $3,044.44 | $2,248.00 | $3,808.33 |
| 0885 | Traffic signal controller cabinet, adjust/modify (0676-1500) | EACH | 1 | $4,600.00 | $5,007.27 | $5,578.82 | $3,308.64 | $3,181.00 | $4,896.43 |
| 0890 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $6,600.00 | $7,198.39 | $8,020.04 | $8,328.40 | $4,754.00 | $7,039.04 |
| 0895 | Internally illuminated sign, remove (0700-5-60) | EACH | 4 | $460.00 | $500.73 | $557.88 | $562.96 | $345.00 | $489.64 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of January 28, 2026. Compiled by Mirage Metrics.