Commercial Industrial Corp.: FDOT bid record
Commercial Industrial Corp. submitted 18 bids on Florida DOT contracts in the data, from 13 JUN 2018 to 20 MAY 2026, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $41,212,846
- Latest bid
- 20 MAY 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2019 | 5 | 1 | 20% |
| 2020 | 3 | 2 | 67% |
| 2021 | 3 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 2 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 9 | 2 | 22% |
| District 7 | 5 | 1 | 20% |
| District 1 | 1 | 0 | 0% |
| District 5 | 1 | 1 | 100% |
| StateWide | 1 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Regular excavation | 0120-1 | CY | 19 | 11 (58%) | $20.00 | $25.47 |
| Type B stabilization | 0160-4 | SY | 16 | 7 (44%) | $6.46 | $15.00 |
| Bedding stone | 0530-74 | TN | 16 | 7 (44%) | $113.00 | $155.00 |
| Riprap, rubble, F&I, ditch lining | 0530-3-4 | TN | 12 | 7 (58%) | $102.44 | $200.00 |
| Concrete class IV, bridge substructure | 0400-4-5 | CY | 9 | 7 (78%) | $964.00 | $1,700.00 |
| Removal of existing concrete | 0110-4-10 | SY | 13 | 6 (46%) | $16.36 | $33.96 |
| Mowing | 0107-2 | ACRE | 11 | 6 (55%) | $32.00 | $80.65 |
| Concrete class II, approach slabs | 0400-2-10 | CY | 10 | 6 (60%) | $443.50 | $700.00 |
| Sediment barrier | 0104-10-3 | LF | 18 | 5 (28%) | $1.96 | $2.60 |
| Embankment | 0120-6 | CY | 18 | 5 (28%) | $19.73 | $30.04 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 17 | 5 (29%) | $0.14 | $0.13 |
| Soil tracking prevention device | 0104-15 | EACH | 10 | 5 (50%) | $1,889.00 | $3,400.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anderson Columbia Co., Inc. | 8 | 5 of 8 |
| Superior Construction Company Southeast, LLC | 7 | 2 of 7 |
| Vecellio & Grogan, Inc. | 7 | 3 of 7 |
| Gosalia Concrete Constructors, Inc. | 6 | 6 of 6 |
| GDB-US Constructors, Inc. | 5 | 1 of 5 |
| Ajax Paving Industries of Florida LLC | 5 | 3 of 5 |
| C.W. Roberts Contracting, Inc. | 4 | 3 of 4 |
| Leware Construction Company of Florida, Inc. | 3 | 0 of 3 |
| Sema Construction, Inc. | 3 | 0 of 3 |
| Watson Civil Construction, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 MAY 2026 | T2A68 | District 2 | CR 357 OVER SHIRED CREEK, BRIDGE NO 300043 | 3 of 4 | $12,180,269 | +39% |
| 29 APR 2026 | T2809 | District 2 | CAMP GRADE RD AND SR 51 OVER STEINHATCHEE RIVER BRIDGE AND.. | 2 of 3 | $13,183,867 | +58% |
| 28 JAN 2026 | T7577 | District 7 | SR 50 (US 98 / CORTEZ BLVD) AT MONDON HILL RD | 7 of 7 | $14,502,750 | +53% |
| 28 AUG 2024 | T9040 | StateWide | SR 93 (I-75) AT PUNTA GORDA NB AND SB WEIGH STATIONS | 6 of 6 | $15,417,685 | +11% |
| 12 JUN 2024 | T3915 | District 3 | SR 8 (I-10) AT JEFFERSON COUNTY WB REST AREA | 3 of 3 | $9,435,206 | +18% |
| 24 MAY 2023 | T5784 | District 5 | SR 93 (I-75) | 1 of 3 | $30,905,947 | Low, 20% under the second |
| 28 APR 2021 | T2805 | District 2 | DRAYTON ISLAND RD | 3 of 4 | $5,487,737 | +36% |
| 27 JAN 2021 | T7465 | District 7 | N TURKEY OAK DR | 3 of 5 | $1,272,380 | +7.0% |
| 27 JAN 2021 | T7468 | District 7 | SR 45/US 41/BROAD ST | 3 of 5 | $9,281,584 | +1.0% |
| 20 MAY 2020 | T2774 | District 2 | CR 200A | 1 of 4 | $1,066,490 | Low, 17% under the second |
| 29 APR 2020 | T7444 | District 7 | SR 93A (I-75) | 6 of 10 | $11,414,909 | +14% |
| 25 MAR 2020 | T2773 | District 2 | SR 200 (US 301) | 1 of 6 | $3,684,895 | Low, 13% under the second |
| 04 DEC 2019 | T2752 | District 2 | CR 231 | 2 of 5 | $6,559,223 | +2.0% |
| 30 OCT 2019 | T2751 | District 2 | CR 339 | 3 of 6 | $4,280,461 | +8.0% |
| 28 AUG 2019 | T1750 | District 1 | SR 60 (HURRICANE IRMA) | 4 of 5 | $3,214,709 | +20% |
| 12 JUN 2019 | T7434 | District 7 | WITHLACOOCHEE-DUNNELLON TRAIL CONNECTOR | 1 of 4 | $5,555,515 | Low, 6.0% under the second |
| 27 FEB 2019 | T2732 | District 2 | SR 20 | 3 of 11 | $24,835,073 | +5.0% |
| 13 JUN 2018 | T2710 | District 2 | EDISON AVE | 4 of 4 | $3,829,612 | +21% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.