FDOT contract T2809 bid tabulation
CAMP GRADE RD AND SR 51 OVER STEINHATCHEE RIVER BRIDGE AND.. Let by Florida DOT on April 29, 2026, Lafayette, District 2. 3 bids received; low bid $8,355,509 by Anderson Columbia Co., Inc..
- Owner
- Florida DOT
- Letting
- 29 APR 2026
- Pay items
- 111
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $8,355,509 | Low |
| 2 | Commercial Industrial Corp. | $13,183,867 | +58% |
| 3 | Superior Construction Company Southeast, LLC | $15,954,092 | +91% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Anderson Columbia Co., Inc. | 2. Commercial Industrial Corp. | 3. Superior Construction Company Southeast, LLC |
|---|---|---|---|---|---|---|
| 0005 | Removal of existing structures/bridges (0110-3) | SF | 1 | $40,000 | $220,500 | $250,000 |
| 0010 | Removal of existing structures/bridges (0110-3) | SF | 1 | $50,000 | $350,000 | $450,000 |
| 0015 | Removal of existing structures/bridges bridge no. 334001 (0110-3) | SF | 1 | $75,000 | $120,000 | $300,000 |
| 0020 | Concrete class II, approach slabs (0400-2-10) | CY | 122.20 | $775.00 | $1,600.00 | $1,400.00 |
| 0025 | Concrete class II, cast-in-place topping with shrinkage admixture (0400-2-47) | CY | 145.50 | $1,100.00 | $1,800.02 | $3,000.00 |
| 0030 | Concrete class IV, bridge substructure (0400-4-5) | CY | 147 | $2,000.00 | $4,200.00 | $5,000.00 |
| 0035 | Conc class IV, bulkhead (0400-4-8) | CY | 7.20 | $1,650.00 | $4,500.00 | $6,200.00 |
| 0040 | Bridge deck grooving (0400-7-1) | SY | 507 | $22.00 | $30.00 | $22.00 |
| 0045 | Bridge deck planing (0400-9-1) | SY | 507 | $20.00 | $30.00 | $25.00 |
| 0050 | Composite neoprene pads (0400-147) | CF | 17.90 | $1,700.00 | $2,500.00 | $2,700.00 |
| 0055 | Plain neoprene bearing pads (0400-148) | CF | 10.50 | $1,156.00 | $2,000.00 | $1,400.00 |
| 0060 | Reinforcing steel - bridge superstructure (0415-1-4) | LB | 30,512 | $1.75 | $2.50 | $1.60 |
| 0065 | Reinforcing steel- bridge substructure (0415-1-5) | LB | 15,213 | $3.50 | $5.00 | $1.60 |
| 0070 | Reinforcing steel- bulkhead (0415-1-8) | LB | 370 | $3.50 | $10.00 | $1.90 |
| 0075 | Reinforcing steel- approach slabs (0415-1-9) | LB | 21,297 | $1.75 | $2.25 | $1.60 |
| 0080 | Prestressed beam: florida slab beam, beam depth 12" carbon steel, width 48-51" (0450-8-11) | LF | 1,025 | $330.00 | $375.00 | $400.00 |
| 0085 | Preformed pile holes, 24" to 29" drill/punch size (0455-15-14) | LF | 1,190 | $45.00 | $250.00 | $300.00 |
| 0090 | Pile inspection, driven pile (0455-20-1) | EACH | 61 | $480.00 | $1,200.00 | $500.00 |
| 0095 | Steel piling, HP 14 X 89 (0455-35-6) | LF | 3,060 | $175.00 | $270.00 | $199.00 |
| 0097 | Anchor bar, steel (0455-87) | EACH | 38 | $4,850.00 | $50.00 | $9,000.00 |
| 0100 | Pile redrive (0455-115) | EACH | 23 | $1,000.00 | $3,500.00 | $1,795.00 |
| 0105 | Sheet piling steel, F&I (0455-133-3) | SF | 3,126 | $80.00 | $80.00 | $75.00 |
| 0110 | Load test (dynamic), data collection and analysis (0455-137) | EACH | 61 | $1,750.00 | $1,800.00 | $1,300.00 |
| 0115 | Load test (dynamic), test (0455-137-2) | EACH | 61 | $200.00 | $2,200.00 | $150.00 |
| 0120 | Test piles - steel, HP 14 X 89 (0455-144-6) | LF | 1,195 | $212.00 | $425.00 | $500.00 |
| 0125 | Bridge deck expansion joint, construction, F&I poured joint with backer rod (0458-1-11) | LF | 166 | $80.00 | $100.00 | $70.00 |
| 0130 | Structural steel rehab- bolts, nuts, washers & plates (0460-1-13) | LB | 200 | $5.50 | $1,200.00 | $315.00 |
| 0135 | Structural steel - rehabilitation, miscellaneous (0460-1-15) | LB | 3,000 | $22.00 | $20.00 | $35.00 |
| 0140 | Structural steel - rehabilitate historic bridge elements, project 437426-1-52-01 bridge no. 334026 (0460-1100) | LS | 1 | $355,000 | $200,000 | $225,000 |
| 0145 | Struct steel, carbon (0460-2-1) | LB | 1 | $6,000.00 | $20,000 | $60,000 |
| 0150 | Struct steel, carbon bridge no. 334026 (0460-2-1) | LB | 1 | $110,000 | $450,000 | $450,000 |
| 0155 | Struct steel, low alloy 43742615201. bridge no. 334026 (0460-2-2) | LB | 1 | $1,100,000 | $450,000 | $1,255,000 |
| 0160 | Metal traffic railing, steel and rail (0460-71-2) | LF | 450 | $1,000.00 | $400.00 | $360.00 |
| 0165 | Treated timber, structural (0470-1) | MB | 34 | $5,000.00 | $12,200 | $18,000 |
| 0170 | Concrete traffic railing- 36" single-slope (0521-5-13) | LF | 320 | $190.00 | $160.00 | $150.00 |
| 0175 | Riprap, sand-cement bags (0530-1100) | CY | 8.50 | $725.00 | $980.00 | $1,350.00 |
| 0180 | Riprap- rubble, bank and shore (0530-3-3) | TN | 688.40 | $140.00 | $180.00 | $167.00 |
| 0185 | Bedding stone (0530-74) | TN | 240.10 | $150.00 | $200.00 | $191.00 |
| 0190 | Conduit, furnish & install, embedded concrete barriers and traffic railings (0630-2-16) | LF | 960 | $20.00 | $30.00 | $25.00 |
| 0195 | Junction box, furnish & install, embedded (0635-3-13) | EACH | 4 | $650.00 | $1,200.00 | $1,750.00 |
| 0200 | Mobilization (0101-1) | LS | 1 | $40,000 | $750,000 | $670,070 |
| 0205 | Mobilization (0101-1) | LS | 1 | $725,000 | $400,000 | $925,335 |
| 0210 | Maintenance of traffic (0102-1) | DA | 1 | $9,500.00 | $120,000 | $24,165 |
| 0215 | Maintenance of traffic (0102-1) | DA | 1 | $46,000 | $350,000 | $105,455 |
| 0220 | Special detour- temporary bridge, project 445148-1-52-01 (0102-2142) | LS | 1 | $325,000 | $700,000 | $898,345 |
| 0225 | Special detour- temporary pavement (0102-2200) | SY | 1 | $115,000 | $250,000 | $221,485 |
| 0230 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $191,000 | $400,000 | $137,555 |
| 0235 | Work zone sign (0102-60) | ED | 58,840 | $0.22 | $0.40 | $0.20 |
| 0240 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 1,930 | $33.00 | $80.00 | $31.00 |
| 0245 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 1,730 | $16.00 | $40.00 | $15.00 |
| 0250 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 42,196 | $0.10 | $0.10 | $0.10 |
| 0255 | Temporary crash cushion, redirective option (0102-89-1) | LO | 20 | $1,050.00 | $2,500.00 | $1,800.00 |
| 0260 | Portable changeable message sign, temporary (0102-99) | ED | 7,158 | $10.00 | $15.00 | $10.00 |
| 0265 | Type III barricade (0102-115) | ED | 9,240 | $0.22 | $0.35 | $0.30 |
| 0270 | Temporary traffic signals for lane closures on way roadways (0102-120) | ED | 320 | $95.00 | $150.00 | $85.00 |
| 0275 | Radar speed display unit (0102-150-2) | ED | 320 | $5.50 | $8.00 | $5.00 |
| 0280 | Temporary raised rumble per day, includes all sets and relocations (0102-909) | DA | 400 | $27.00 | $20.00 | $1.00 |
| 0285 | Temporary work structure (0103-1100) | LS | 1 | $55,000 | $200,000 | $98,555 |
| 0290 | Sediment barrier (0104-10-3) | LF | 1,546 | $4.28 | $6.00 | $10.00 |
| 0295 | Floating turbidity barrier (0104-11) | LF | 268 | $30.50 | $18.00 | $25.00 |
| 0300 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 2,365 | $9.50 | $12.00 | $15.00 |
| 0305 | Soil tracking prevention device (0104-15) | EACH | 4 | $1,200.00 | $3,500.00 | $7,500.00 |
| 0310 | Litter removal (0107-1) | ACRE | 48.06 | $100.00 | $25.00 | $500.00 |
| 0315 | Mowing (0107-2) | ACRE | 41.18 | $100.00 | $25.00 | $635.00 |
| 0320 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $20,000 | $350,000 | $750,000 |
| 0325 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $60,000 | $350,000 | $1,146,320 |
| 0330 | Removal of existing concrete (0110-4-10) | SY | 8 | $87.00 | $250.00 | $80.00 |
| 0335 | Tree protection barrier (0110-21) | LF | 75 | $12.00 | $30.00 | $20.00 |
| 0340 | Regular excavation (0120-1) | CY | 680.50 | $25.00 | $18.00 | $28.80 |
| 0345 | Embankment (0120-6) | CY | 2,512.60 | $22.00 | $30.00 | $46.10 |
| 0350 | Type B stabilization (0160-4) | SY | 4,543 | $20.00 | $12.00 | $20.00 |
| 0355 | Optional base, base group 06 (0285-706) | SY | 2,580 | $27.00 | $35.00 | $27.00 |
| 0360 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 2,830 | $4.62 | $8.00 | $5.00 |
| 0365 | Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53) | TN | 308.90 | $245.00 | $300.00 | $308.00 |
| 0370 | Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83) | TN | 446 | $185.00 | $325.00 | $312.00 |
| 0375 | Miscellaneous asphalt (0339-1) | TN | 26.20 | $550.00 | $400.00 | $650.00 |
| 0380 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 12 | $6,700.00 | $9,800.00 | $7,505.00 |
| 0385 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 491 | $123.00 | $160.00 | $180.00 |
| 0390 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 55 | $165.00 | $250.00 | $215.00 |
| 0395 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 6 | $1,750.00 | $3,500.00 | $3,400.00 |
| 0400 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 2 | $2,100.00 | $4,500.00 | $4,750.00 |
| 0405 | Sheet piling steel, temporary- critical (0455-133-2) | SF | 11,733 | $16.14 | $32.00 | $60.00 |
| 0410 | Sheet piling steel, F&I (0455-133-3) | SF | 1,343 | $66.00 | $120.00 | $90.00 |
| 0415 | Shoulder gutter- concrete (0520-6) | LF | 709 | $80.25 | $80.00 | $47.00 |
| 0420 | Shoulder concrete barrier, 38" or 44" height (0521-72-40) | LF | 18 | $1,325.00 | $500.00 | $1,000.00 |
| 0425 | Concrete slope pavement,non reinforced, 4" (0524-2-2) | SY | 732 | $140.00 | $150.00 | $275.00 |
| 0430 | Riprap, sand-cement bags (0530-1100) | CY | 11 | $865.00 | $1,200.00 | $835.00 |
| 0435 | Guardrail -roadway, general/low speed TL-2 (0536-1-0) | LF | 116 | $17.00 | $40.00 | $22.00 |
| 0440 | Guardrail -roadway, general (0536-1-1) | LF | 514 | $25.00 | $40.00 | $23.50 |
| 0445 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-2 (0536-8111) | EACH | 1 | $2,830.00 | $3,500.00 | $2,300.00 |
| 0450 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 3 | $3,375.00 | $3,500.00 | $2,500.00 |
| 0455 | Guardrail removal (0536-73) | LF | 237 | $5.00 | $20.00 | $2.00 |
| 0460 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 6 | $3,275.00 | $3,500.00 | $2,375.00 |
| 0465 | Performance turf, sod (0570-1-2) | SY | 11,299 | $3.20 | $6.00 | $9.00 |
| 0470 | Raised pavement marker, type B (0706-1-3) | EACH | 2,092 | $5.50 | $6.00 | $5.00 |
| 0475 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 1.06 | $1,950.00 | $2,000.00 | $1,800.00 |
| 0480 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 92 | $5.50 | $60.00 | $5.00 |
| 0485 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 1.04 | $1,950.00 | $2,800.00 | $1,800.00 |
| 0490 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $127.00 | $127.00 | $127.00 |
| 0495 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $64,016 | $64,016 | $64,016 |
| 0500 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 0.72 | $28,000 | $3,500.00 | $5,500.00 |
| 0505 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $500.00 | $600.00 | $455.00 |
| 0510 | Single column ground sign assembly, remove (0700-1600) | EACH | 5 | $50.00 | $100.00 | $25.00 |
| 0515 | Object marker, type 1 (0705-10-1) | EACH | 3 | $300.00 | $350.00 | $260.00 |
| 0520 | Raised pavement marker, type B (0706-1-3) | EACH | 80 | $5.50 | $7.00 | $5.00 |
| 0525 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,750.00 | $12,000 | $2,500.00 |
| 0530 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 10 | $16.00 | $200.00 | $15.00 |
| 0535 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.55 | $6,750.00 | $8,000.00 | $6,500.00 |
| 0540 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.53 | $6,750.00 | $4,500.00 | $6,500.00 |
| 0545 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.04 | $49,123 | $50,000 | $45,000 |
| 0550 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.04 | $49,123 | $50,000 | $45,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of April 29, 2026. Compiled by Mirage Metrics.