Superior Construction Company Southeast, LLC: FDOT bid record

Superior Construction Company Southeast, LLC submitted 109 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 28 OCT 2026, and was the low bidder on 17 of them (16%). When it was not low, its total sat a median +22% above the low bid.

Owner
Florida DOT
Low bid volume
$503,754,212
Latest bid
28 OCT 2026
Data through
28 OCT 2026
109Bids
17Low bids
16Win rate, percent
+22%Median gap to the low bid when not low, 92 bids

By year

YearBidsLow bidsWin rate
201814429%
20191100%
202014214%
202118317%
202213538%
20236117%
20247114%
20251218%
20261400%
Superior Construction Company Southeast, LLC, FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 2481327%
District 33013%
District 511327%
District 71100%
District 1400%
District 4400%
District 6100%
Superior Construction Company Southeast, LLC, FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Work zone sign0102-60ED10866 (61%)$0.22$0.25
Raised pavement marker, type B0706-1-3EACH9361 (66%)$5.00$5.00
Channelizing device- types I, II, VP, drum, or LCD0102-74-1ED10558 (55%)$0.10$0.13
Thermoplastic, standard-other surfaces, white, solid, 6"0711-16101GM8757 (66%)$5,200.00$5,220.00
Portable changeable message sign, temporary0102-99ED10254 (53%)$11.00$12.00
Conduit, furnish & install, directional bore0630-2-12LF9454 (57%)$26.88$30.82
Thermoplastic, standard-other surfaces, yellow, solid, 6"0711-16201GM8554 (64%)$5,016.00$5,200.00
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH10149 (49%)$900.00$1,150.00
Guardrail end treatment- parallel approach terminal0536-85-24EACH7048 (69%)$3,000.00$3,352.68
Permanent tape, white, solid, 6" for concrete bridges0713-103101GM7244 (61%)$30,000$33,000
Guardrail -roadway, general0536-1-1LF6244 (71%)$22.50$25.93
Conduit, furnish & install, open trench0630-2-11LF10243 (42%)$14.00$16.54
Superior Construction Company Southeast, LLC, FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Superior Construction Company Southeast, LLC, FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T3970District 3HANNA MILL POND RD OVER HANNA POND BRIDGE NO 5040432 of 5$5,266,922+1.0%
30 SEP 2026T3937District 3CR 278 (PEACOCK BRIDGE RD) OVER CHIPOLA RIVER, BRIDGE NO 5300264 of 4$10,159,071+35%
29 JUL 2026T3920District 3CR 65 (ROPING RD) OVER BEE BRANCH, BRIDGE NO 5241786 of 6$1,345,716+40%
29 JUL 2026T7619District 7MULTIUSE TRAIL AT SR 60 (W COURTNEY CAMPBELL CAUSEWAY)2 of 6$2,081,188+28%
10 JUN 2026T5884District 5SR 400 FROM MP 22.660 TO MP 23.4755 of 6$44,597,522+17%
20 MAY 2026T2A68District 2CR 357 OVER SHIRED CREEK, BRIDGE NO 3000434 of 4$14,447,636+65%
29 APR 2026T2809District 2CAMP GRADE RD AND SR 51 OVER STEINHATCHEE RIVER BRIDGE AND..3 of 3$15,954,092+91%
25 MAR 2026T1920District 1SR 684 FROM SR 789 (GULF DR) TO W OF 123 ST W3 of 6$129,085,398+5.0%
25 MAR 2026T3939District 3CR 173 (BETHEL RD) OVER GUM CREEK NO 2, BRIDGE NO 6100263 of 3$2,174,836+76%
25 MAR 2026T3951District 3SR 20 OVER ECONFINA CREEK, BRIDGE NO 460037 AND 4600344 of 4$18,747,903+27%
25 FEB 2026T2A37District 2SR 228 FROM HART BRIDGE TO BEACH BLVD2 of 5$18,727,378+9.0%
25 FEB 2026T3928District 3SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 4644194 of 6$7,845,936+40%
28 JAN 2026T3929District 3CR 274 OVER TENMILE CREEK BRIDGE NO. 4700356 of 7$10,251,428+78%
28 JAN 2026T5875District 5SR 5 (US 1) OVER PELLICER CREEK, BRIDE NOS 730076 AND 7300772 of 6$13,653,497+9.0%
03 DEC 2025T2A48District 2SR A1A (MAYPORT ROAD) FROM ATLANTIC BLVD TO DUTTON ISLAND..5 of 5$13,410,519+39%
03 DEC 2025T2A53District 2SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO...5 of 8$28,928,363+45%
03 DEC 2025T4729District 4SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET7 of 8$153,624,888+51%
24 SEP 2025T2A24District 2SR 23 (FIRST COAST XWAY) FROM SR 9 (I-95) TO E OF CR 22093 of 8$216,496,489+5.0%
11 JUN 2025T2A25District 2SR A1A FROM GATE 5 NAVAL STATION MAYPORT TO S OF US COAST...4 of 5$1,779,332+20%
11 JUN 2025T2A26District 2SR A1A FROM S OF OCEAN SANDS TO S OF CARCABA RD1 of 6$3,740,629Low, 13% under the second
30 APR 2025T2A28District 2SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...2 of 8$13,776,274+3.0%
30 APR 2025T4711District 4SR 838 AND SR 836 (SUNRISE BLVD) OVER INTRACOASTAL WATER...4 of 4$74,809,160+73%
26 FEB 2025T2A16District 2SR 55 (US 221) AT TWO PINES CREEK BRIDGE NO.380011 AND....3 of 5$16,950,241+23%
29 JAN 2025T2994District 2SR 21 (BLANDING BLVD) FROM S OF WELLS RD TO THE DUVAL CO LIN3 of 4$9,067,888+13%
29 JAN 2025T7502District 7SR 60 (USB 41 / SR 685 / W KENNEDY BLVD) FROM W OF S WOOD...2 of 2$28,000,000+22%
Superior Construction Company Southeast, LLC: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy