FDOT contract T2994 bid tabulation

SR 21 (BLANDING BLVD) FROM S OF WELLS RD TO THE DUVAL CO LIN. Let by Florida DOT on January 29, 2025, Clay, District 2. 4 bids received; low bid $8,019,579 by Coxwell, J.B. Contracting, Inc..

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
173
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Coxwell, J.B. Contracting, Inc.$8,019,579Low
2Hubbard Construction Company$8,872,773+11%
3Superior Construction Company Southeast, LLC$9,067,888+13%
4Watson Civil Construction, Inc.$9,236,153+15%
FDOT contract T2994: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Coxwell, J.B. Contracting, Inc.2. Hubbard Construction Company3. Superior Construction Company Southeast, LLC4. Watson Civil Construction, Inc.
0005Bridge deck expansion joint, rehabilitation, poured joint backer rod (0458-1-21)LF66$205.00$200.00$110.00$108.00
0010Mobilization (0101-1)LS1$909,835$637,000$741,000$720,000
0015Mobilization (0101-1)LS1$606,660$250,000$165,760$200,000
0020Maintenance of traffic (0102-1)DA1$1,187,385$1,697,000$700,000$2,453,000
0025Pedestrian or bicycle special detour (0102-4-1)SY1$2,800.00$35,000$10,000$11,000
0030Traffic control officer (0102-14)HR140$114.00$85.00$200.00$105.00
0035Pedestrian escort operation (0102-25100)HR60$107.00$40.00$400.00$120.00
0040Work zone sign (0102-60)ED27,550$0.27$0.26$0.25$0.37
0045Temporary barrier, F&I, low profile, concrete (0102-71-13)LF2,460$52.95$43.00$45.00$38.00
0050Temporary barrier, relocate, low profile concrete (0102-71-23)LF2,570$18.50$15.00$25.00$13.00
0055Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED44,620$0.10$0.09$0.10$0.14
0060Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD58,420$0.05$0.05$0.05$0.08
0065Arrow board / advance warning arrow panel (0102-76)ED205$5.50$5.15$5.00$7.50
0070Portable changeable message sign, temporary (0102-99)ED1,780$9.85$9.26$9.00$14.00
0075Temporary signalization and maintenance, intersection (0102-104)ED340$100.61$91.00$24.00$120.00
0080Temporary traffic detection and maintenance, intersection (0102-107-1)ED565$36.50$33.00$15.00$30.00
0085Type III barricade (0102-115)ED4,575$0.27$0.26$0.25$0.41
0090Temporary traffic signals for lane closures on way roadways (0102-120)ED120$225.35$210.58$620.00$2,000.00
0095Removable tape, white, solid 6" (0102-913-21)GM0.28$14,512$13,646$13,500$14,500
0100Removable tape, white, 10'-30', 6'-10', or 2'-4' skip, 6" wide (0102-913-22)GM0.11$6,990.00$6,327.43$6,500.00$6,700.00
0105Removable tape, yellow, solid, (0102-913-31)GM0.30$14,512$13,322$13,500$15,000
0110Artificial coverings /rolled erosion control products (0104-1)SY10$93.00$2.15$210.00$13.00
0115Sediment barrier (0104-10-3)LF1,623$6.50$1.86$15.00$1.70
0120Inlet protection system (0104-18)EACH24$130.00$150.00$400.00$200.00
0125Litter removal (0107-1)ACRE51.34$205.00$125.00$1,000.00$160.00
0130Mowing (0107-2)ACRE36.42$215.00$600.00$700.00$290.00
0135Clearing & grubbing (0110-1-1)ACRE1$150,975$251,000$2,195,400$460,000
0140Removal of existing concrete (0110-4-10)SY1,688$79.00$37.62$100.00$33.00
0145Regular excavation (0120-1)CY1,789.40$23.00$112.68$70.00$25.00
0150Subsoil excavation (0120-4)CY223.10$100.00$71.85$75.75$98.00
0155Embankment (0120-6)CY318.30$67.00$207.11$105.00$15.00
0160Flowable fill (0121-70)CY57.50$413.00$289.83$485.00$945.00
0165Type B stabilization (0160-4)SY4,486$42.00$23.14$25.50$37.00
0170Optional base, base group 09 (0285-709)SY4,164$49.00$124.19$46.50$70.00
0175Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY5,926$8.00$11.75$7.55$4.60
0180Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY29,744$2.80$11.70$2.65$2.00
0185Superpave asphaltic concrete, traffic C, PG76-22 (0334-1-53)TN1,172.20$229.00$367.50$216.25$216.00
0190Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN3,185.80$222.25$343.10$209.85$210.00
0195Concrete class NS, gravity index 400-011 (0400-0-11)CY27$1,375.00$1,380.33$3,815.00$1,700.00
0200Inlets, curb, type P-5, <10' (0425-1351)EACH2$12,535$10,647$18,485$13,000
0205Inlets, curb, type P-6, <10' (0425-1361)EACH1$13,920$7,682.15$43,565$14,000
0210Inlets, curb, type P-6, partial (0425-1365)EACH1$6,515.00$6,233.58$10,345$6,400.00
0215Manholes, J-7, partial (0425-2-73)EACH1$5,345.00$7,399.05$13,850$9,200.00
0220Manholes, J-8, <10' (0425-2-91)EACH1$37,400$20,817$36,620$25,000
0225Manholes, J-8, partial (0425-2-93)EACH1$4,050.00$6,264.50$8,900.00$8,300.00
0230Special drainage structure, utility conflict manhole (0425-100-24)EACH2$16,400$11,359$37,900$32,000
0235Pipe culvert,optional material,round, 15"S/CD (0430-175115)LF10$465.00$447.86$455.00$245.00
0240Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF66$256.00$307.53$485.00$445.00
0245Pipe culvert, opt material, round, 42"S/CD (0430-175142)LF4$3,000.00$7,049.17$3,350.00$1,700.00
0250Pipe culvert,optional material,other-elip/arch, (0430-175218)LF93$286.00$229.41$410.00$300.00
0255Mitered end section, optional round, 18" SD (0430-984125)EACH1$3,475.00$3,608.28$5,050.00$3,700.00
0260Trench drain, standard (0436-1-1)LF70$975.00$647.94$615.00$650.00
0265Underdrain outlet pipe, 6" (0440-73-2)LF4$716.00$365.48$930.00$350.00
0270Pipe handrail - guiderail, aluminum (0515-1-2)LF82$105.00$98.23$70.50$81.00
0275Concrete curb & gutter, type E (0520-1-7)LF1,099$45.50$40.57$41.50$83.00
0280Concrete curb & gutter, type F (0520-1-10)LF505$53.50$41.12$53.75$80.00
0285Valley gutter- concrete (0520-3)LF66$89.00$46.81$70.50$107.00
0290Traffic separator concrete- type I, 4' wide (0520-5-11)LF62$170.00$115.58$110.00$100.00
0295Concrete traffic separator, special- variable width (0520-70)SY1,214$178.00$197.14$87.00$117.00
0300Concrete sidewalk and driveways, 4" thick (0522-1)SY864$78.00$66.83$64.00$92.00
0305Concrete sidewalk and driveways, 6" thick (0522-2)SY195$125.00$76.39$78.50$100.00
0310Detectable warnings (0527-2)SF595$86.00$53.04$38.50$62.00
0315Performance turf, sod (0570-1-2)SY1,027$26.50$10.15$20.00$21.00
0320Electrical power service- contribution in aid of construction (ciac), clay electric (DO not bid) (0639-8151)LS1$10,915$10,915$10,915$10,915
0325Raised pavement marker, type B (0706-1-3)EACH2,645$4.84$4.50$4.50$4.75
0330Painted pavement markings, standard, white, solid, 6" (0710-11101)GM5.00$1,612.50$1,500.30$1,500.00$1,600.00
0335Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102)GM0.48$1,720.00$1,616.84$1,600.00$1,700.00
0340Painted pavement markings, standard, white, solid for interchange markings, 12" (0710-11103)GM0.24$2,150.00$2,016.81$2,000.00$2,050.00
0345Painted pavement markings, standard, white, solid for crosswalk and roundabout, 12" (0710-11123)LF2,586$1.08$1.00$1.00$1.10
0350Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124)LF1,251$2.15$2.00$2.00$2.15
0355Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF1,246$3.23$3.00$3.00$3.20
0360Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM3.33$860.00$799.76$800.00$845.00
0365Painted pavement marking, standard,white, 3'-9' skip drop line and approach to toll 12" wide, (0710-11133)GM0.55$1,720.00$1,594.20$1,600.00$1,700.00
0370Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM0.43$860.00$805.62$800.00$830.00
0375Painted pavement markings, standard, white, message or symbol (0710-11160)EACH79$91.50$85.00$85.00$89.50
0380Painted pavement markings, standard, white, arrows (0710-11170)EACH179$43.00$40.00$40.00$42.10
0385Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM3.51$1,612.50$1,500.43$1,500.00$1,600.00
0390Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224)LF863$2.15$2.00$2.00$2.15
0395Painted pavement markings, standard, yellow, skip, 6" (0710-11231)GM0.04$860.00$744.19$800.00$790.00
0400Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241)GM0.10$860.00$816.33$800.00$775.00
0405Initial contingency amount, DO not bid (0999-25)LS1$60,682$60,682$60,682$60,682
0410Initial contingency amount, DO not bid (0999-25)LS1$22,186$22,186$22,186$22,186
0415Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH31$534.00$502.02$400.00$520.00
0420Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH13$2,200.00$2,067.68$2,200.00$2,000.00
0425Single column ground sign assembly, F&I ground mount, 30.0 SF (0700-1113)EACH4$2,318.00$2,177.78$2,500.00$2,300.00
0430Single column ground sign assembly, remove (0700-1600)EACH17$32.50$30.30$50.00$89.00
0435Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH2$2,825.00$2,654.55$2,628.00$3,500.00
0440Sign panel, remove, 51-100 SF (0700-3605)EACH1$409.00$383.84$380.00$360.00
0445Overhead static sign furnish & install, cantilever, 40 FT (0700-4113)EACH1$105,905$99,511$98,516$118,000
0450Overhead static sign shallow foundation removal, cantilever (0700-4611)EACH1$9,245.00$8,686.87$8,600.00$7,400.00
0455Tubular marker, 36" white post (0704-1-3)EACH9$201.00$188.89$125.00$190.00
0460Tubular marker, 36" yellow (0704-1-4)EACH14$201.00$188.89$125.00$190.00
0465Raised pavement marker, type B (0706-1-3)EACH1,065$5.40$5.00$5.00$5.30
0470Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF46$10.75$10.00$10.00$10.60
0475Painted pavement markings, surface (0710-90)LS1$32,250$30,000$30,000$32,000
0480Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102)GM0.12$6,450.00$6,206.90$6,000.00$6,000.00
0485Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.24$10,750$10,084$10,000$10,200
0490Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF1,807$4.30$4.00$4.00$4.25
0495Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF1,025$5.38$5.00$5.00$5.30
0500Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF500$6.45$6.00$6.00$6.35
0505Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM0.28$3,225.00$3,032.49$3,000.00$3,100.00
0510Thermoplastic, standard, message or symbol (0711-11160)EACH40$215.00$200.00$200.00$211.00
0515Thermoplastic, standard, arrow (0711-11170)EACH103$86.00$80.00$80.00$85.00
0520Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF272$5.40$5.00$5.00$5.30
0525Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.09$3,225.00$3,103.45$3,000.00$3,000.00
0530Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF419$21.50$20.00$20.00$21.00
0535Thermoplastic, preformed, color route shield (0711-14660)EACH2$2,690.00$2,500.00$2,500.00$2,700.00
0540Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM2.32$5,590.00$5,200.00$5,200.00$5,500.00
0545Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.28$6,450.00$5,957.45$6,000.00$6,300.00
0550Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM1.12$3,225.00$2,989.32$3,000.00$3,200.00
0555Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.33$6,450.00$6,000.00$6,000.00$6,400.00
0560Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM1.53$5,590.00$5,196.60$5,200.00$5,500.00
0565Thermoplastic, standard-other surfaces, yellow, skip, 6" (0711-16231)GM0.04$3,225.00$2,790.70$3,000.00$3,000.00
0570Permanent tape, white, solid, 6" for concrete bridges (0713-103101)GM0.04$32,250$32,432$30,000$30,800
0575Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181)GM0.11$10,750$9,909.91$10,500$10,500
0580Permanent tape, yellow, solid, for concrete bridges (0713-103201)GM0.04$32,250$32,432$31,500$31,000
0585Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381)GM0.09$10,750$9,782.61$10,500$10,400
0590Conduit, furnish & install, open trench (0630-2-11)LF941$24.50$22.00$17.00$28.50
0595Conduit, furnish & install, directional bore (0630-2-12)LF77$74.00$67.00$41.35$27.00
0600Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH34$1,015.00$915.00$1,580.00$2,450.00
0605Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF8,211$2.25$2.00$2.55$2.90
0610Luminaire & bracket arm- galv steel, furnish & install new luminaire and arm on new/existing pole (0715-5-32)EACH1$3,840.00$3,461.00$2,700.00$1,650.00
0615Load center, F&I, secondary voltage (0715-7-11)EACH1$14,265$12,869$22,500$39,000
0620Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH8$1,800.00$1,625.00$1,980.00$2,500.00
0625Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 12' arm length (0715-61342)EACH11$14,855$13,393$9,680.00$12,100
0630Light pole complete, F&I, standard pole standard foundation, 40' mounting height, 15' arm length (0715-61352)EACH6$11,015$9,938.00$9,800.00$10,500
0635Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366)EACH1$12,485$11,262$11,850$13,500
0640Light pole complete, remove pole and foundation (0715-69000)EACH3$3,032.00$2,735.00$1,090.00$1,200.00
0645Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH18$708.00$639.00$950.00$945.00
0650Itsfm subsurface documentation- project length (0611-1-1)MI0.23$3,660.00$3,300.00$3,100.00$1,900.00
0655Itsfm location documentation- intersection (0611-2-1)EACH1$2,715.00$2,447.00$2,515.00$1,900.00
0660Conduit, furnish & install, open trench (0630-2-11)LF863$30.50$28.00$17.00$49.00
0665Conduit, furnish & install, directional bore (0630-2-12)LF2,336$49.00$44.00$41.35$50.00
0670Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI3$6,917.00$6,241.00$12,600$23,000
0675Fiber optic cable, F&I, underground,2-12 fibers (0633-1121)LF937$4.60$4.00$7.75$5.25
0680Fiber optic cable, remove, underground (0633-1620)LF532$1.20$1.00$1.50$1.45
0685Fiber optic connection, install, splice (0633-2-31)EACH36$55.00$50.00$58.00$62.00
0690Fiber optic connection hardware, F&I, splice (0633-3-11)EACH3$1,440.00$1,298.00$1,485.00$1,700.00
0695Fiber optic connection hardware, F&I, splice tray (0633-3-12)EACH3$61.00$55.00$71.00$70.00
0700Fiber optic connection hardware, F&I, buffer tube fan out kit (0633-3-14)EACH1$104.00$94.00$155.00$120.00
0705Fiber optic connection hardware, F&I, preterminated patch panel (0633-3-15)EACH1$2,310.00$2,084.00$1,785.00$2,650.00
0710Fiber optic connection hardware, F&I, connector panel (0633-3-17)EACH1$122.00$110.00$230.00$140.00
0715Fiber optic cable locator (0633-6)DA340$366.00$330.00$365.00$415.00
0720Span wire assembly, F&I, two point, other type (0634-4154)PI1$5,500.00$4,961.00$18,900$22,000
0725Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH32$1,015.00$915.00$1,580.00$1,400.00
0730Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH4$2,280.00$2,055.00$2,870.00$3,700.00
0735Electrical power service, F&I, underground, meter by contractor (0639-1122)AS1$5,985.00$5,396.00$5,460.00$6,500.00
0740Electrical service wire, & install (0639-2-1)LF10$5.00$4.00$13.00$9.10
0745Electrical service disconnect, F&I, pole mount (0639-3-11)EACH1$1,615.00$1,455.00$2,385.00$2,200.00
0750Prestressed concrete pole, type P-II service pole (0641-2-12)EACH1$2,125.00$1,918.00$2,560.00$2,800.00
0755Aluminum signals pole, (0646-1-11)EACH7$3,930.00$3,543.00$2,915.00$3,000.00
0760Aluminum signals pole, remove (0646-1-60)EACH4$970.00$874.00$525.00$330.00
0765Steel strain pole, F&I, type PS- VIII (0649-1-15)EACH4$62,200$56,109$68,000$71,000
0770Steel mast arm assembly, and install, single arm 40' (0649-21-3)EACH1$60,585$54,660$82,200$67,000
0775Steel mast arm assembly, and install, single arm 78' (0649-21-21)EACH3$101,930$91,957$114,300$105,000
0780Steel mast arm assembly, remove, shallow foundation- bolt on attachment (0649-26-3)EACH4$7,895.00$7,120.00$11,100$3,000.00
0785Vehicular traffic signal, furnish & install aluminum, 1 section, 1 way (0650-1-11)AS3$1,205.00$1,086.00$1,220.00$1,350.00
0790Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS28$2,175.00$1,959.00$1,920.00$1,900.00
0795Vehicular traffic signal, furnish & install aluminum, 5 section cluster, 1 way (0650-1-19)AS1$3,205.00$2,890.00$3,200.00$3,100.00
0800Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS6$1,100.00$994.00$1,120.00$1,050.00
0805Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS3$2,215.00$1,996.00$2,050.00$2,100.00
0810Vehicle detection system- microwave, furnish & install cabinet equipment (0660-3-11)EACH4$10,125$9,132.00$8,480.00$10,000
0815Vehicle detection system- microwave, furnish & install, above ground equipment (0660-3-12)EACH11$13,585$12,255$12,800$9,500.00
0820Vehicle detection system- avi, bluetooth relocate, cabinet equipment (0660-6421)EACH1$1,940.00$1,749.00$1,170.00$3,000.00
0825Vehicle detection system- avi, bluetooth relocate, above ground equipment (0660-6422)EACH1$10,960$9,886.00$1,111.00$3,000.00
0830Pedestrian detector, furnish & install, standard (0665-1-11)EACH9$410.00$370.00$445.00$280.00
0835Traffic controller assembly, F&I, NEMA (0670-5110)AS1$46,150$41,633$53,600$84,000
0840ITS CCTV camera, relocate (0682-1400)EACH1$4,740.00$4,274.00$2,025.00$450.00
0845ITS CCTV camera, adjust/modify (0682-1500)EACH1$2,440.00$2,200.00$1,860.00$450.00
0850Managed field ethernet switch, furnish & install (0684-1-1)EACH1$4,600.00$4,152.00$5,670.00$6,000.00
0855Uninterruptible power supply, furnish and install, online/double conversion (0685-1-12)EACH1$8,630.00$7,785.00$7,070.00$8,800.00
0860Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH7$1,345.00$1,213.00$1,010.00$777.00
0865Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH4$5,750.00$5,188.00$6,385.00$8,300.00
FDOT contract T2994: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way