Coxwell, J.B. Contracting, Inc.: FDOT bid record
Coxwell, J.B. Contracting, Inc. submitted 35 bids on Florida DOT contracts in the data, from 31 JAN 2018 to 25 MAR 2026, and was the low bidder on 10 of them (29%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $79,993,779
- Latest bid
- 25 MAR 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 1 | 17% |
| 2019 | 5 | 1 | 20% |
| 2020 | 2 | 1 | 50% |
| 2021 | 3 | 0 | 0% |
| 2022 | 5 | 1 | 20% |
| 2023 | 4 | 2 | 50% |
| 2024 | 1 | 0 | 0% |
| 2025 | 7 | 4 | 57% |
| 2026 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Portable changeable message sign, temporary | 0102-99 | ED | 32 | 14 (44%) | $10.19 | $12.00 |
| Regular excavation | 0120-1 | CY | 31 | 14 (45%) | $20.00 | $25.47 |
| Inlet protection system | 0104-18 | EACH | 29 | 14 (48%) | $110.00 | $150.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 34 | 13 (38%) | $0.11 | $0.13 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 50 | 12 (24%) | $1,037.50 | $1,150.00 |
| Work zone sign | 0102-60 | ED | 34 | 12 (35%) | $0.23 | $0.25 |
| Litter removal | 0107-1 | ACRE | 31 | 10 (32%) | $107.00 | $52.98 |
| Mowing | 0107-2 | ACRE | 31 | 10 (32%) | $161.00 | $80.65 |
| Type B stabilization | 0160-4 | SY | 25 | 10 (40%) | $17.00 | $15.00 |
| Painted pavement markings, standard, yellow, solid, 6" | 0710-11201 | GM | 27 | 9 (33%) | $1,573.00 | $1,350.00 |
| Arrow board / advance warning arrow panel | 0102-76 | ED | 25 | 9 (36%) | $5.38 | $5.90 |
| Sediment barrier | 0104-10-3 | LF | 33 | 8 (24%) | $4.00 | $2.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Watson Civil Construction, Inc. | 19 | 10 of 19 |
| Superior Construction Company Southeast, LLC | 18 | 7 of 18 |
| Hubbard Construction Company | 13 | 3 of 13 |
| Anderson Columbia Co., Inc. | 7 | 5 of 7 |
| Maer Homes, LLC | 6 | 2 of 6 |
| Vecellio & Grogan, Inc. | 5 | 2 of 5 |
| R.B. Baker Construction Company, A Division of Reeves Constr | 4 | 3 of 4 |
| American Lighting and Signalization, LLC. | 4 | 2 of 4 |
| Petticoat-Schmitt Civil Contractors, Inc. | 3 | 0 of 3 |
| Sema Construction, Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 MAR 2026 | T2A62 | District 2 | SR A1A (ATLANTIC AVE) FROM CENTRE ST TO S FLETCHER AVE | 4 of 5 | $8,098,835 | +61% |
| 28 JAN 2026 | T2A56 | District 2 | SR 202 AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF | 2 of 5 | $12,108,205 | +11% |
| 03 DEC 2025 | T2A48 | District 2 | SR A1A (MAYPORT ROAD) FROM ATLANTIC BLVD TO DUTTON ISLAND.. | 1 of 5 | $9,645,577 | Low, 4.0% under the second |
| 03 DEC 2025 | T2A53 | District 2 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | 6 of 8 | $35,725,945 | +79% |
| 24 SEP 2025 | T2A24 | District 2 | SR 23 (FIRST COAST XWAY) FROM SR 9 (I-95) TO E OF CR 2209 | 8 of 8 | $263,463,042 | +28% |
| 11 JUN 2025 | T2A25 | District 2 | SR A1A FROM GATE 5 NAVAL STATION MAYPORT TO S OF US COAST... | 1 of 5 | $1,482,455 | Low, 3.0% under the second |
| 11 JUN 2025 | T2A26 | District 2 | SR A1A FROM S OF OCEAN SANDS TO S OF CARCABA RD | 2 of 6 | $4,242,712 | +13% |
| 30 APR 2025 | T2A28 | District 2 | SR 5A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO... | 1 of 8 | $13,385,441 | Low, 3.0% under the second |
| 29 JAN 2025 | T2994 | District 2 | SR 21 (BLANDING BLVD) FROM S OF WELLS RD TO THE DUVAL CO LIN | 1 of 4 | $8,019,579 | Low, 11% under the second |
| 04 DEC 2024 | T2A10 | District 2 | SR 228 (POST ST) FROM CASSAT AVE TO OLD ROOSEVELT BLVD | 2 of 4 | $7,349,636 | +14% |
| 06 DEC 2023 | T2961 | District 2 | CLET HARVEY RD, OVER MUD LAKE SWAMP, BRIDGE NO 274091 | 2 of 2 | $4,192,910 | +19% |
| 14 JUN 2023 | T2932 | District 2 | SR 8 (I-10) | 1 of 2 | $8,815,756 | Low, 3.0% under the second |
| 14 JUN 2023 | T2958 | District 2 | SR 15 (US 17) | 2 of 3 | $3,806,276 | 0.0% |
| 17 MAY 2023 | T2930 | District 2 | SR 105 (HECKSHER DR) | 1 of 1 | $4,453,655 | Low |
| 15 JUN 2022 | T2844 | District 2 | SR 5 (US 1/PHILIPS HWY) | 2 of 2 | $22,062,887 | +11% |
| 08 JUN 2022 | T2853 | District 2 | SR 202 (J TURNER BUTLER BLVD) | 1 of 3 | $17,135,161 | Low, 14% under the second |
| 25 MAY 2022 | T2843 | District 2 | SR 312 | 3 of 4 | $13,358,521 | +10% |
| 27 APR 2022 | T2823 | District 2 | I-295 (SR 9A) | 3 of 4 | $33,665,999 | +10% |
| 26 JAN 2022 | T2818 | District 2 | SR 116 (WONDERWOOD EXPRESSWAY) | 2 of 4 | $27,608,692 | -5.0% |
| 09 JUN 2021 | T2855 | District 2 | SR 103 (LANE AVE) | 4 of 4 | $9,963,986 | +26% |
| 26 MAY 2021 | T2814 | District 2 | SR 212 (US 90/BEACH BLVD) | 2 of 3 | $8,266,770 | +12% |
| 28 APR 2021 | T2791 | District 2 | SR 211 | 2 of 2 | $2,688,493 | +53% |
| 29 APR 2020 | T2771 | District 2 | SR 9A (I-295) | 1 of 2 | $6,443,949 | Low, 8.0% under the second |
| 25 MAR 2020 | T2764 | District 2 | SR 15 (US 17) | 4 of 4 | $1,443,994 | +51% |
| 25 SEP 2019 | T2749 | District 2 | SR 202 (J TURNER BUTLER BLVD) | 2 of 3 | $12,736,554 | +7.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.