FDOT letting results, December 3, 2025
16 contracts let by Florida DOT on December 3, 2025, $204,773,736 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 16
- Low bids, total
- $204,773,736
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T4729 | SR A1A (JIMMY BUFFETT MEMORIAL HWY) OVER SEBASTIAN INLET | District 4 | 8 | Webber, LLC | $101,965,262 | $114,287,000 | +12% | FDOT |
| T2A52 | SR 8 (I-10) FROM SR 10 (US 90) TO SR 51 (US 129) | District 2 | 1 | Anderson Columbia Co., Inc. | $27,456,289 | FDOT | ||
| T2A53 | SR 5A (SR A1A / AVENIDA MENENDEZ) FROM BRIDGE OF LIONS TO... | District 2 | 8 | Vecellio & Grogan, Inc. | $19,965,843 | $24,305,013 | +22% | FDOT |
| T3993 | SR 97 (ATMORE HWY) FROM SR 95 (US 29) TO ALABAMA STATE LINE | District 3 | 4 | Anderson Columbia Co., Inc. | $14,277,297 | $14,542,198 | +2.0% | FDOT |
| T2A48 | SR A1A (MAYPORT ROAD) FROM ATLANTIC BLVD TO DUTTON ISLAND.. | District 2 | 5 | Coxwell, J.B. Contracting, Inc. | $9,645,577 | $10,020,888 | +4.0% | FDOT |
| T7559 | SR 400 (I-4) FROM E OF TAMPA BYPASS CANAL TO W OF I-75 | District 7 | 5 | Watson Civil Construction, Inc. | $8,564,850 | $8,700,867 | +2.0% | FDOT |
| T6615 | SR 5 (US 1 / BISCAYNE BLVD) FROM S OF NE 38TH ST TO NE 61... | District 6 | 8 | General Asphalt Company, LLC | $6,267,634 | $6,286,721 | 0.0% | FDOT |
| T2A51 | SR 5 (US 1 / PHILIPS HWY) FROM BAYARD BLVD TO BUSINESS PA... | District 2 | 5 | Duval Asphalt Products, Inc. | $4,135,348 | $4,195,664 | +1.0% | FDOT |
| T3994 | SR 69 FROM S OF NE VAN LEROP RD TO JACKSON CO LINE | District 3 | 5 | Anderson Columbia Co., Inc. | $2,851,686 | $3,178,875 | +11% | FDOT |
| T4717 | SR 736 (DAVIE BLVD) FROM SR 9 (I-95) TO SR 5 (US 1) | District 4 | 8 | Rtech Engineering, LLC | $2,258,253 | $2,299,999 | +2.0% | FDOT |
| T7572 | SR 93 (I-275) FROM WILLOW AVE TO W OF GREEN ST | District 7 | 5 | Preferred Materials Inc. | $1,565,698 | $2,213,001 | +41% | FDOT |
| T6620 | SR A1A (COLLINS AVE) FROM S OF SR 826 TO N OF 178 ST | District 6 | 5 | Aum Construction Inc. | $1,437,565 | $1,468,745 | +2.0% | FDOT |
| T3969 | SR 20 FROM SR 75 (US 231) TO CALHOUN CO LINE | District 3 | 5 | Roberts and Roberts, Inc. | $1,393,732 | $1,599,589 | +15% | FDOT |
| T3958 | VICTORIA AVE OVER TIDAL BRANCH, BRIDGE NO 514060 | District 3 | 2 | Murphree Bridge Corporation | $1,165,588 | $1,228,880 | +5.0% | FDOT |
| T3A01 | SR 83 (US 331) AT ROCK HILL RD | District 3 | 2 | Ingram Signalization, Inc. | $954,614 | $1,575,177 | +65% | FDOT |
| T6614 | SR 817 (NW 27 AVE) FRM SESAME ST TO DUNAD AVE | District 6 | 6 | Horsepower Electric, Inc. | $868,500 | $869,745 | 0.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.