Ingram Signalization, Inc.: FDOT bid record
Ingram Signalization, Inc. submitted 22 bids on Florida DOT contracts in the data, from 27 FEB 2019 to 29 JUL 2026, and was the low bidder on 19 of them (86%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $20,357,649
- Latest bid
- 29 JUL 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 1 | 100% |
| 2020 | 2 | 1 | 50% |
| 2022 | 4 | 4 | 100% |
| 2023 | 4 | 4 | 100% |
| 2024 | 2 | 2 | 100% |
| 2025 | 6 | 4 | 67% |
| 2026 | 3 | 3 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 3 | 19 | 18 | 95% |
| StateWide | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 7 | 6 (86%) | $32.00 | $30.82 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 7 | 4 (57%) | $12.00 | $16.54 |
| Litter removal | 0107-1 | ACRE | 7 | 4 (57%) | $100.00 | $52.98 |
| Sediment barrier | 0104-10-3 | LF | 7 | 3 (43%) | $6.00 | $2.60 |
| Pull & splice box, F&I, 13" X 24" cover size | 0635-2-11 | EACH | 6 | 3 (50%) | $1,400.00 | $1,150.00 |
| Mowing | 0107-2 | ACRE | 7 | 2 (29%) | $100.00 | $80.65 |
| Removal of existing concrete | 0110-4-10 | SY | 5 | 2 (40%) | $100.00 | $33.96 |
| Work zone sign | 0102-60 | ED | 7 | 1 (14%) | $0.65 | $0.25 |
| Inlet protection system | 0104-18 | EACH | 7 | 1 (14%) | $300.00 | $150.00 |
| Portable changeable message sign, temporary | 0102-99 | ED | 6 | 1 (17%) | $40.00 | $12.00 |
| Type III barricade | 0102-115 | ED | 6 | 1 (17%) | $1.50 | $0.34 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| American Lighting and Signalization, LLC. | 2 | 0 of 2 |
| Chinchor Electric Inc. | 2 | 1 of 2 |
| Signal Technology and Installation Corp. | 2 | 0 of 2 |
| Traffic Control Devices, Inc. | 2 | 0 of 2 |
| Contact Network LLC | 1 | 0 of 1 |
| United Signs & Signals, Inc. | 1 | 0 of 1 |
| Bill Smith Electric | 1 | 1 of 1 |
| New Era Electric Inc | 1 | 0 of 1 |
| Webber Infrastructure Management, Inc. | 1 | 1 of 1 |
| H. G. Harders & Son, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 JUL 2026 | T3A16 | District 3 | SR 276 (KYNESVILLE RD / PENN AVE) AT CR 167 (SOUTH ST) | 1 of 1 | $998,652 | Low |
| 29 APR 2026 | T3997 | District 3 | SR 10 (US 90 / W TENNESSEE ST) FROM CALLARK ST TO W BREVARD | 1 of 4 | $964,114 | Low, 11% under the second |
| 25 MAR 2026 | T3962 | District 3 | SR 75 (US 231) AT CR 388 | 1 of 2 | $1,187,507 | Low, 4.0% under the second |
| 03 DEC 2025 | T3A01 | District 3 | SR 83 (US 331) AT ROCK HILL RD | 1 of 2 | $954,614 | Low, 65% under the second |
| 30 JUL 2025 | T3A07 | District 3 | SR 300 OVER ST GEORGE SOUND (BRIDGE NO 490100) | 3 of 4 | $198,695 | +107% |
| 28 MAY 2025 | T3857 | District 3 | SR 10 (US 90) AT E SPENCER FIELD RD | 1 of 1 | $1,223,760 | Low |
| 28 MAY 2025 | T3900 | District 3 | SR 10 (US 90) AT CR 197 (CHUMUCKLA HWY) | 1 of 1 | $1,130,042 | Low |
| 30 APR 2025 | T3963 | District 3 | SR 291 (N DAVIS HWY) AT LANGLEY AVE | 1 of 2 | $1,168,510 | Low, 23% under the second |
| 29 JAN 2025 | T9045 | StateWide | SR 10 (US 90) AT PENSACOLA WEIGH STATION | 2 of 3 | $556,753 | +9.0% |
| 13 NOV 2024 | T3911 | District 3 | SR 10 (US 90) AT NORTH/SOUTH AIRPORT RD | 1 of 1 | $960,717 | Low |
| 28 AUG 2024 | T3840 | District 3 | SR 10 (US 90) AT SR 69 (PORTER AVE) | 1 of 1 | $2,093,575 | Low |
| 27 SEP 2023 | T3868 | District 3 | SR 30 (US 98) (EMERALD COAST PKWY) | 1 of 1 | $1,298,401 | Low |
| 27 SEP 2023 | T3874 | District 3 | SR 390 (BECK AVENUE) AT 19TH ST INTERSECTION | 1 of 1 | $988,409 | Low |
| 26 JUL 2023 | T3855 | District 3 | SR 30 (US 98 / NAVARRE PKWY), AT SUNRISE DR | 1 of 1 | $958,894 | Low |
| 25 JAN 2023 | T3832 | District 3 | SR 30 (US 98) | 1 of 1 | $391,274 | Low |
| 07 DEC 2022 | T3842 | District 3 | SR 30A (US 98) (PANAMA CITY BEACH PKWY) | 1 of 1 | $851,756 | Low |
| 26 OCT 2022 | T3826 | District 3 | SR 75 (US 231) | 1 of 1 | $942,554 | Low |
| 05 OCT 2022 | T3818 | District 3 | SR 30 (US 98) (18TH ST) | 1 of 1 | $287,504 | Low |
| 30 MAR 2022 | T9029 | StateWide | SR 8 (I-10) | 1 of 2 | $2,718,412 | Low, 4.0% under the second |
| 10 JUN 2020 | T3749 | District 3 | SR 30 (US 98) FRONT BEACH RD SAFETY PROJECT | 1 of 1 | $755,462 | Low |
| 25 MAR 2020 | T9021 | StateWide | SNEADS WEIGH STATION | 2 of 3 | $1,808,141 | +13% |
| 27 FEB 2019 | T3656 | District 3 | SR 69 (PEAR ST) | 1 of 4 | $483,492 | Low, 1.0% under the second |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.