| 0005 | Mobilization (0101-1) | LS | 1 | $185,000 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $55,000 |
| 0015 | Pedestrian or bicycle special detour (0102-4-1) | SY | 1 | $10,000 |
| 0020 | Traffic control officer (0102-14) | HR | 32 | $110.00 |
| 0025 | Work zone sign (0102-60) | ED | 9,665 | $1.34 |
| 0030 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 14,453 | $0.20 |
| 0035 | Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8) | FD | 24,780 | $0.62 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 95 | $25.00 |
| 0045 | Portable changeable message sign, temporary (0102-99) | ED | 537 | $30.00 |
| 0050 | Temporary signalization and maintenance, intersection (0102-104) | ED | 165 | $10.00 |
| 0055 | Temporary traffic detection and maintenance, intersection (0102-107-1) | ED | 165 | $10.00 |
| 0060 | Type III barricade (0102-115) | ED | 50 | $10.00 |
| 0065 | Removable tape, white, 12" crosswalk (0102-913-24) | LF | 263 | $40.00 |
| 0070 | Sediment barrier (0104-10-3) | LF | 119 | $10.00 |
| 0075 | Inlet protection system (0104-18) | EACH | 4 | $200.00 |
| 0080 | Litter removal (0107-1) | ACRE | 4.05 | $250.00 |
| 0085 | Mowing (0107-2) | ACRE | 2.36 | $500.00 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $5,000.00 |
| 0095 | Removal of existing concrete (0110-4-10) | SY | 50 | $150.00 |
| 0100 | Regular excavation (0120-1) | CY | 16.90 | $180.00 |
| 0105 | Borrow excavation, truck measure (0120-2-2) | CY | 5.10 | $600.00 |
| 0110 | Concrete curb & gutter, type E (0520-1-7) | LF | 82 | $175.00 |
| 0115 | Concrete curb, type B (0520-2-2) | LF | 76 | $170.00 |
| 0120 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 120 | $300.00 |
| 0125 | Detectable warnings (0527-2) | SF | 242 | $50.00 |
| 0130 | Performance turf, sod (0570-1-2) | SY | 107 | $10.00 |
| 0135 | Electrical power service- contribution in aid of construction (ciac), FPL (DO not bid) (0639-8130) | LS | 1 | $1,110.00 |
| 0140 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 |
| 0145 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 12 | $1,200.00 |
| 0150 | Single column ground sign assembly, remove (0700-1600) | EACH | 4 | $100.00 |
| 0155 | Tubular marker, 36" white post (0704-1-3) | EACH | 4 | $310.00 |
| 0160 | Tubular marker, 36" yellow (0704-1-4) | EACH | 3 | $310.00 |
| 0165 | Object marker, type 1 (0705-10-1) | EACH | 3 | $340.00 |
| 0170 | Raised pavement marker, type B (0706-1-3) | EACH | 113 | $16.00 |
| 0175 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 64 | $10.00 |
| 0180 | Thermoplastic, standard, solid, 8" for interchange and urban island (0711-11102) | GM | 0.02 | $30,000 |
| 0185 | Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123) | LF | 764 | $15.00 |
| 0190 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 47 | $20.00 |
| 0195 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 149 | $24.00 |
| 0200 | Thermoplastic, standard, arrow (0711-11170) | EACH | 5 | $300.00 |
| 0205 | Thermoplastic, standard, yield line (0711-11180) | LF | 33 | $50.00 |
| 0210 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 19 | $20.00 |
| 0215 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 0.00 | $300,000 |
| 0220 | Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125) | LF | 684 | $30.00 |
| 0225 | Thermoplastic, preformed, white, message (0711-14160) | EACH | 1 | $400.00 |
| 0230 | Thermoplastic, preformed, white, arrow (0711-14170) | EACH | 1 | $300.00 |
| 0235 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.02 | $30,000 |
| 0240 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.02 | $30,000 |
| 0245 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 844 | $10.00 |
| 0250 | Itsfm subsurface documentation- project length (0611-1-1) | MI | 0.06 | $4,000.00 |
| 0255 | Itsfm location documentation- intersection (0611-2-1) | EACH | 1 | $3,000.00 |
| 0260 | Conduit, furnish & install, open trench (0630-2-11) | LF | 209 | $17.00 |
| 0265 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 396 | $37.00 |
| 0270 | Conduit, furnish & install, aboveground (0630-2-14) | LF | 20 | $20.00 |
| 0275 | Signal cable- new or reconstructed intersection, furnish & install (0632-7-1) | PI | 1 | $10,000 |
| 0280 | Signal cable, remove- intersection (0632-7-6) | PI | 1 | $400.00 |
| 0285 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 19 | $1,570.00 |
| 0290 | Electrical power service, F&I, underground, meter by contractor (0639-1122) | AS | 1 | $2,800.00 |
| 0295 | Electrical service wire, & install (0639-2-1) | LF | 85 | $30.00 |
| 0300 | Prestressed concrete pole, type P-II service pole (0641-2-12) | EACH | 1 | $2,500.00 |
| 0305 | Prestressed concrete pole, shallow pole removal- pole 30' and greater (0641-2-70) | EACH | 2 | $7,000.00 |
| 0310 | Aluminum signals pole, (0646-1-11) | EACH | 6 | $3,500.00 |
| 0315 | Aluminum signals pole, remove (0646-1-60) | EACH | 3 | $500.00 |
| 0320 | Steel mast arm assembly, and install, double arm 78'-60' (0649-21-25) | EACH | 2 | $166,000 |
| 0325 | Vehicular traffic signal, furnish & install 3 section, 1 way (0650-1-34) | AS | 6 | $2,200.00 |
| 0330 | Vehicular traffic signal, furnish & install 4 section, 1 way (0650-1-36) | AS | 2 | $3,650.00 |
| 0335 | Vehicular traffic signal, furnish & install 5 section straight, 1 way (0650-1-38) | AS | 2 | $2,950.00 |
| 0340 | Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11) | AS | 4 | $1,500.00 |
| 0345 | Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12) | AS | 2 | $2,500.00 |
| 0350 | Vehicle detection system- furnish & install cabinet equipment (0660-4-11) | EACH | 1 | $52,000 |
| 0355 | Vehicle detection system- furnish & install above ground equipment (0660-4-12) | EACH | 2 | $15,200 |
| 0360 | Signal priority and preemption system, furnish and install, detector (0663-1122) | EACH | 1 | $7,800.00 |
| 0365 | Signal priority and preemption system, furnish and install, cabinet electronics (0663-1123) | EACH | 1 | $10,000 |
| 0370 | Pedestrian detector, furnish & install, standard (0665-1-11) | EACH | 8 | $650.00 |
| 0375 | Traffic controller assembly, F&I, NEMA, 1 preemption (0670-5111) | AS | 1 | $55,000 |
| 0380 | Traffic controller assembly, remove controller with (0670-5600) | AS | 1 | $1,000.00 |
| 0385 | ITS CCTV camera, F&I, dome PTZ enclosure - pressurized, IP, definition (0682-1113) | EACH | 1 | $6,000.00 |
| 0390 | Managed field ethernet switch, furnish & install (0684-1-1) | EACH | 1 | $5,500.00 |
| 0395 | Uninterruptible power supply, furnish and install, line interactive with cabinet (0685-1-13) | EACH | 1 | $15,000 |
| 0400 | Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22) | EACH | 4 | $5,000.00 |