FDOT letting results, January 25, 2023

19 contracts let by Florida DOT on January 25, 2023, $142,800,243 in low bids, a median of 4 bidders per contract.

Owner
Florida DOT
Contracts
19
Low bids, total
$142,800,243
Data through
28 OCT 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
T7493SR 400 (I-4)District 74Hubbard Construction Company$35,735,836$36,459,949+2.0%FDOT
T1849SR 683District 13Superior Asphalt, Inc.$30,246,721$30,346,9140.0%FDOT
T5777GALAXY WAYDistrict 59JR. Davis Construction Co., Inc.$22,896,706$23,570,000+3.0%FDOT
T2884SR 115District 21Duval Asphalt Products, Inc.$16,475,781FDOT
T3847SR 30 (US 98)District 32C.W. Roberts Contracting, Inc.$8,306,085$9,792,562+18%FDOT
T6552SR 909 (W DIXIE HWY)District 65Bacallao Construction & Engineering Development, LLC D/B/A B$5,851,269$6,388,000+9.0%FDOT
T1846SR 90 (US 41)District 13Ajax Paving Industries of Florida LLC$3,477,042$4,007,662+15%FDOT
T5779SR 500 (US 192)District 52Chinchor Electric Inc.$3,457,186$3,865,194+12%FDOT
T3823SR 8 (I-10)District 33Collins Land Services, Inc$2,199,429$2,276,127+3.0%FDOT
T4637SR 7 (US 441)District 45Weekley Asphalt Paving, Inc.$2,144,351$2,239,900+4.0%FDOT
T6570SR 25/US 27/NW 36TH STDistrict 64Florida Engineering & Development Corp$1,901,127$1,912,759+1.0%FDOT
T6571SR 932 (NW-NE 103 ST)District 65Bacallao Construction & Engineering Development, LLC D/B/A B$1,857,275$2,074,194+12%FDOT
T5781SR 15/SR 600/US 17/US 92District 54P & S Paving, Inc.$1,838,831$2,134,280+16%FDOT
T4634SR 822 (SHERIDAN ST)District 44Florida Engineering & Development Corp$1,746,923$1,749,2570.0%FDOT
T5780SR 509 (NASA BLVD)District 56Chinchor Electric Inc.$1,654,943$1,937,827+17%FDOT
T5778SR 527District 52Chinchor Electric Inc.$1,617,324$2,596,732+61%FDOT
T4636SR 838 (SUNRISE BLVD)District 44Aum Construction Inc.$798,900$939,406+18%FDOT
T3832SR 30 (US 98)District 31Ingram Signalization, Inc.$391,274FDOT
T2903SR 45 (US 41)District 21Blacktip Services Incorporated$203,240FDOT
FDOT contracts let on January 25, 2023, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy