FDOT letting results, January 25, 2023
19 contracts let by Florida DOT on January 25, 2023, $142,800,243 in low bids, a median of 4 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 19
- Low bids, total
- $142,800,243
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T7493 | SR 400 (I-4) | District 7 | 4 | Hubbard Construction Company | $35,735,836 | $36,459,949 | +2.0% | FDOT |
| T1849 | SR 683 | District 1 | 3 | Superior Asphalt, Inc. | $30,246,721 | $30,346,914 | 0.0% | FDOT |
| T5777 | GALAXY WAY | District 5 | 9 | JR. Davis Construction Co., Inc. | $22,896,706 | $23,570,000 | +3.0% | FDOT |
| T2884 | SR 115 | District 2 | 1 | Duval Asphalt Products, Inc. | $16,475,781 | FDOT | ||
| T3847 | SR 30 (US 98) | District 3 | 2 | C.W. Roberts Contracting, Inc. | $8,306,085 | $9,792,562 | +18% | FDOT |
| T6552 | SR 909 (W DIXIE HWY) | District 6 | 5 | Bacallao Construction & Engineering Development, LLC D/B/A B | $5,851,269 | $6,388,000 | +9.0% | FDOT |
| T1846 | SR 90 (US 41) | District 1 | 3 | Ajax Paving Industries of Florida LLC | $3,477,042 | $4,007,662 | +15% | FDOT |
| T5779 | SR 500 (US 192) | District 5 | 2 | Chinchor Electric Inc. | $3,457,186 | $3,865,194 | +12% | FDOT |
| T3823 | SR 8 (I-10) | District 3 | 3 | Collins Land Services, Inc | $2,199,429 | $2,276,127 | +3.0% | FDOT |
| T4637 | SR 7 (US 441) | District 4 | 5 | Weekley Asphalt Paving, Inc. | $2,144,351 | $2,239,900 | +4.0% | FDOT |
| T6570 | SR 25/US 27/NW 36TH ST | District 6 | 4 | Florida Engineering & Development Corp | $1,901,127 | $1,912,759 | +1.0% | FDOT |
| T6571 | SR 932 (NW-NE 103 ST) | District 6 | 5 | Bacallao Construction & Engineering Development, LLC D/B/A B | $1,857,275 | $2,074,194 | +12% | FDOT |
| T5781 | SR 15/SR 600/US 17/US 92 | District 5 | 4 | P & S Paving, Inc. | $1,838,831 | $2,134,280 | +16% | FDOT |
| T4634 | SR 822 (SHERIDAN ST) | District 4 | 4 | Florida Engineering & Development Corp | $1,746,923 | $1,749,257 | 0.0% | FDOT |
| T5780 | SR 509 (NASA BLVD) | District 5 | 6 | Chinchor Electric Inc. | $1,654,943 | $1,937,827 | +17% | FDOT |
| T5778 | SR 527 | District 5 | 2 | Chinchor Electric Inc. | $1,617,324 | $2,596,732 | +61% | FDOT |
| T4636 | SR 838 (SUNRISE BLVD) | District 4 | 4 | Aum Construction Inc. | $798,900 | $939,406 | +18% | FDOT |
| T3832 | SR 30 (US 98) | District 3 | 1 | Ingram Signalization, Inc. | $391,274 | FDOT | ||
| T2903 | SR 45 (US 41) | District 2 | 1 | Blacktip Services Incorporated | $203,240 | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.