JR. Davis Construction Co., Inc.: FDOT bid record

JR. Davis Construction Co., Inc. submitted 16 bids on Florida DOT contracts in the data, from 13 JUN 2018 to 28 OCT 2026, and was the low bidder on 5 of them (31%). When it was not low, its total sat a median +16% above the low bid.

Owner
Florida DOT
Low bid volume
$151,644,290
Latest bid
28 OCT 2026
Data through
28 OCT 2026
16Bids
5Low bids
31Win rate, percent
+16%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
201811100%
2019100%
20203133%
2021100%
2022100%
202311100%
2024100%
20254250%
2026300%
JR. Davis Construction Co., Inc., FDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 514429%
District 12150%
JR. Davis Construction Co., Inc., FDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Disputes review board, meeting- DO not bid0999-20-1DA1010 (100%)$3,900.00$3,900.00
Disputes review board, hearing- DO not bid0999-20-2EACH1010 (100%)$5,125.00$4,500.00
Conduit, furnish & install, open trench0630-2-11LF429 (21%)$14.25$16.54
Concrete sidewalk and driveways, 4" thick0522-1SY137 (54%)$43.00$65.00
Manholes, P-8, <10'0425-2-61EACH117 (64%)$5,800.00$6,325.37
Inlet protection system0104-18EACH166 (38%)$99.88$150.00
Pull & splice box, F&I, 13" X 24" cover size0635-2-11EACH425 (12%)$1,305.00$1,150.00
Regular excavation0120-1CY155 (33%)$7.97$25.47
Embankment0120-6CY155 (33%)$13.25$30.04
Removal of existing concrete0110-4-10SY145 (36%)$13.82$33.96
Permanent tape, white, solid, 6" for concrete bridges0713-103101GM95 (56%)$36,950$33,000
Permanent tape, yellow, solid, for concrete bridges0713-103201GM95 (56%)$36,000$33,000
JR. Davis Construction Co., Inc., FDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Masci General Contractors, Inc107 of 10
Hubbard Construction Company92 of 9
Ranger Construction Industries, Inc.83 of 8
Sema Construction, Inc.62 of 6
Watson Civil Construction, Inc.64 of 6
Southland Construction, Inc.43 of 4
Prince Contracting, LLC.32 of 3
Granite Construction Company of California30 of 3
Middlesex Corporation (the)30 of 3
Thalle Construction Co., Inc.20 of 2
JR. Davis Construction Co., Inc., FDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 OCT 2026T5914District 5SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD)3 of 4$23,710,015+16%
20 MAY 2026T5882District 5ELLIS RD FROM J RODES BLVD TO WICKHAM RD9 of 10$47,032,063+47%
28 JAN 2026T5874District 5SR 426 (FAIRBANKS AVE / ALOMA AVE) FROM S PARK AVE TO N ...2 of 5$10,254,120+8.0%
11 JUN 2025T5851District 5SR 500 (US 441) FROM N OF SR 50 TO SR 414 INTERCHANGE RAMPS1 of 5$35,181,705Low, 10% under the second
28 MAY 2025T5854District 5SR 500 (E IRLO BRONSON MEMORIAL HWY) FROM CR 532 (NOVA RD)..1 of 5$11,154,437Low, 18% under the second
30 APR 2025T5793District 5SR 9 (I-95) FROM MP 18.355 TO MP 19.5523 of 7$65,285,773+8.0%
29 JAN 2025T5843District 5SR 530 (US 192/VINE ST) FROM BAMBOO LN TO MAIN ST (US 441)5 of 5$33,999,401+31%
24 APR 2024T5824District 5SR 46 (W 1ST ST) FROM E OF I-4 TO SR 15 (US 17/92)7 of 7$21,746,796+30%
25 JAN 2023T5777District 5GALAXY WAY1 of 9$22,896,706Low, 3.0% under the second
15 JUN 2022T5724District 5SR 400 (I-4)4 of 5$87,998,445+6.0%
27 JAN 2021T5711District 5SR 519 (FISKE BLVD)3 of 4$9,616,161+10%
29 JUL 2020T5699District 5SR 5185 of 5$9,127,447+38%
10 JUN 2020T1754District 1SR 25 (US 27)2 of 9$45,948,895+3.0%
29 APR 2020T1751District 1SR 542 (DUNDEE RD)1 of 5$43,563,143Low, 10% under the second
24 APR 2019T5642District 5SR 466 of 8$21,465,901+20%
13 JUN 2018T5590District 5SR 9 (I-95)1 of 6$38,848,299Low, 1.0% under the second
JR. Davis Construction Co., Inc.: latest FDOT bids in the data

How this record was read

FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

  • Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy