FDOT contract T5914 bid tabulation

SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD). Let by Florida DOT on October 28, 2026, Brevard, District 5. 4 bids received; low bid $20,411,474 by Masci General Contractors, Inc.

Owner
Florida DOT
Letting
28 OCT 2026
Pay items
102
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Masci General Contractors, Inc$20,411,474Low
2MJC Land Development, LLC$20,537,298+1.0%
3JR. Davis Construction Co., Inc.$23,710,015+16%
4Timothy Rose Contracting, Inc.$70,803,189+247%
FDOT contract T5914: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Masci General Contractors, Inc2. MJC Land Development, LLC3. JR. Davis Construction Co., Inc.4. Timothy Rose Contracting, Inc.
0005Mobilization (0101-1)LS1$928,334$710,000$2,300,000$6,926,839
0010Maintenance of traffic (0102-1)DA1$398,772$75,000$570,000$1,152,485
0015Special detour- temporary pavement (0102-2200)SY1$35,724$47,000$45,000$44,398
0020Special detour- temporary earthwork/base (0102-2300)CY1$15,500$25,000$10,000$11,693
0025Traffic control officer (0102-14)HR1,080$90.00$80.00$155.00$150.00
0030Work zone sign (0102-60)ED3,960$0.28$0.25$0.30$0.42
0035Temporary barrier, F&I, anchored (0102-71-15)LF804$55.00$38.00$45.00$84.19
0040Temporary barrier, relocate, anchored (0102-71-25)LF384$19.00$17.00$18.00$39.97
0045Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED33,660$0.15$0.10$0.15$0.18
0050Temporary raised/retroreflective pavement marker, type B (0102-78-2)EACH583$3.27$4.50$6.50$10.20
0055Temporary crash cushion, redirective option (0102-89-1)LO2$1,581.00$1,300.00$1,750.00$4,188.61
0060Portable changeable message sign, temporary PCMS will BE placed 14 days prior to construction (0102-99)ED358$14.00$11.00$13.00$20.00
0065Portable regulatory, sign (0102-150-1)ED660$7.00$4.50$5.00$8.00
0070Radar speed display unit (0102-150-2)ED660$7.00$4.50$5.00$8.00
0075Sediment barrier (0104-10-3)LF11,643$1.53$4.50$4.75$3.62
0080Floating turbidity barrier (0104-11)LF98$35.00$56.00$20.00$24.28
0085Staked turbidity barrier- nylon reinforced PVC (0104-12)LF5,913$7.00$9.00$12.00$10.12
0090Inlet protection system (0104-18)EACH52$145.00$145.00$165.00$607.05
0095Litter removal (0107-1)ACRE185.78$59.00$120.00$70.00$92.00
0100Mowing (0107-2)ACRE185.78$125.00$83.00$110.00$180.00
0105Clearing & grubbing (0110-1-1)ACRE1$718,350$435,000$1,222,000$8,834,244
0110Regular excavation (0120-1)CY8,284.30$11.50$8.50$6.00$82.82
0115Subsoil excavation (0120-4)CY10,455.60$35.87$15.00$30.00$597.75
0120Embankment (0120-6)CY46,943.50$19.25$35.00$24.00$140.20
0125Type B stabilization (0160-4)SY39,057$12.35$20.10$12.00$46.18
0130Optional base, base group 04 (0285-704)SY16,818$23.70$22.00$19.00$103.02
0135Optional base, base group 10 (0285-710)SY18,488$39.82$31.00$24.00$162.68
0140Optional base, base group 11 (0285-711)SY1,774$42.41$63.00$73.00$152.06
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY182$7.00$6.00$21.00$36.07
0150Milling existing asphalt pavement, 3/4" avg depth (0327-70-19)SY5,365$2.75$6.00$5.00$5.27
0155Superpave asphaltic conc, traffic B (0334-1-12)TN2,682.20$145.29$160.00$165.00$419.48
0160Superpave asphaltic conc, traffic E (0334-1-15)TN3,905.90$144.78$182.00$167.00$407.39
0165Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55)TN3,254.30$158.69$182.00$210.00$758.48
0170Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25)TN1,050.60$219.24$315.00$370.00$416.36
0175Miscellaneous asphalt (0339-1)TN58.60$559.50$225.00$400.00$797.09
0180Inlets, DT bot, type D, <10' (0425-1541)EACH11$15,789$13,675$14,600$18,824
0185Manholes, P-8, <10' (0425-2-61)EACH2$14,473$6,100.00$6,400.00$15,539
0190Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224)LF26$458.00$504.00$335.00$347.06
0195Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF628$328.00$152.00$170.00$370.63
0200Pipe culvert,optional material,round, 24"S/CD (0430-175124)LF399$399.00$180.00$230.00$366.41
0202Pipe culvert,optional material,round, jack & bore, 18" storm and cross drain (0430-185118)LF94$1,411.00$2,450.00$1,900.00$2,976.87
0205Straight concrete endwalls, single, 0 degrees, round (0430-524100)EACH5$5,500.00$9,100.00$8,700.00$12,268
0210Pipe filling and plugging- place out of service (0430-830)CY7.60$400.00$1,700.00$1,300.00$704.85
0215Mitered end section, optional round, 18" CD (0430-982125)EACH6$3,887.00$5,975.00$3,050.00$5,800.07
0220Mitered end section, optional round, 24" CD (0430-982129)EACH5$3,992.00$7,375.00$4,100.00$6,101.23
0225Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629)EACH4$4,118.00$6,425.00$4,300.00$7,722.66
0230Riprap, rubble, F&I, ditch lining (0530-3-4)TN238.50$321.50$290.00$274.00$339.30
0235Sound/noise barrier-inc foundation, permanent (0534-72101)SF190,075$53.00$55.70$60.00$115.50
0240Guardrail -roadway, general (0536-1-1)LF1,122$32.00$28.00$27.70$49.35
0245Special guardrail post- post for shallow mount (0536-7-3)EACH10$258.00$63.00$61.00$600.00
0250Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122)EACH1$2,998.00$4,100.00$3,980.00$8,349.97
0255Guardrail removal (0536-73)LF495$5.00$2.00$2.00$6.00
0260Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$1,887.00$1,500.00$1,440.00$3,189.99
0265Guardrail end treatment- parallel approach terminal (0536-85-24)EACH3$3,558.00$3,700.00$3,650.00$5,399.98
0270Anti-graffiti coating, (0563-3)SF172,795$1.95$0.40$0.50$3.67
0275Performance turf (0570-1-1)SY101,668$4.00$3.40$4.00$8.93
0280Conduit, furnish & install, open trench (0630-2-11)LF947$12.50$14.75$11.20$21.80
0281Fiber optic cable locator (0633-6)DA165$174.00$56.00$166.00$452.16
0285Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH3$1,577.00$1,500.00$1,520.00$2,983.85
0290Pull & splice box, F&I, 24" X 36" cover size (0635-2-12)EACH2$2,284.00$3,400.00$2,370.00$4,300.15
0295Electrical service wire, & install (0639-2-1)LF947$5.98$8.00$5.80$25.62
0300Painted pavement markings, standard, white, solid, 6" (0710-11101)GM0.76$4,845.51$1,700.00$1,860.00$1,631.99
0305Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM0.25$5,370.83$1,690.00$1,870.00$1,631.99
0310Disputes review board, meeting- DO not bid (0999-20-1)DA7$4,800.00$4,800.00$4,800.00$4,800.00
0315Disputes review board, hearing- DO not bid (0999-20-2)EACH2$5,750.00$5,750.00$5,750.00$5,750.00
0320Initial contingency amount, DO not bid (0999-25)LS1$150,000$150,000$150,000$150,000
0325Ground-in rumble strips, 8" sinusoidal (0546-72-3)GM2.80$8,546.51$3,500.00$3,320.00$8,368.75
0330Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH4$630.00$650.00$540.00$816.00
0335Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH3$2,310.00$2,950.00$1,040.00$3,192.59
0340Single column ground sign assembly, relocate (0700-1500)EACH2$330.75$245.00$630.00$357.00
0345Single column ground sign assembly, remove (0700-1600)EACH7$36.75$29.00$125.00$102.00
0350Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH1$14,280$13,600$8,900.00$26,275
0355Multi-column ground sign assembly, relocate (0700-2500)EACH2$10,500$3,500.00$6,900.00$10,302
0360Multi-column ground sign assembly, remove (0700-2600)EACH2$2,100.00$1,375.00$1,990.00$2,519.39
0365Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203)EACH6$1,890.00$1,575.00$2,280.00$5,044.65
0370Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205)EACH1$6,090.00$4,375.00$5,900.00$12,107
0375Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206)EACH3$8,400.00$5,675.00$10,700$17,152
0380Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207)EACH2$630.00$9,075.00$13,700$24,214
0385Sign panel, remove, 21-30 SF (0700-3603)EACH5$420.00$270.00$1,250.00$2,421.43
0390Sign panel, remove, 51-100 SF (0700-3605)EACH1$630.00$1,170.00$930.00$4,842.86
0395Sign panel, remove, 101-200 SF (0700-3606)EACH3$630.00$1,460.00$1,560.00$4,842.86
0400Sign panel, remove, 201-300 SF (0700-3607)EACH1$630.00$1,754.69$3,430.00$7,062.52
0405Overhead static sign furnish & install, cantilever, 31- 40 FT (0700-4113)EACH2$146,475$136,000$134,470$309,500
0410Overhead static sign deep foundation removal, cantilever (0700-4612)EACH1$26,250$10,800$18,600$58,518
0415Raised pavement marker, type B (0706-1-3)EACH598$6.30$5.50$6.60$10.20
0420Painted pavement markings, surface (0710-90)LS1$15,383$8,170.00$16,200$13,849
0425Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.11$108,224$28,900$15,000$17,748
0430Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101)GM2.80$7,350.00$8,500.00$7,800.00$10,229
0435Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131)GM2.63$4,200.00$3,520.00$4,420.00$3,569.99
0440Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133)GM1$11,550$4,080.00$12,200$4,283.99
0445Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201)GM0.25$7,350.00$8,440.00$7,700.00$10,229
0450Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1)SF642$5.72$5.00$6.50$7.75
0455Conduit, furnish & install, open trench (0630-2-11)LF5,536$11.12$14.00$10.45$26.13
0460Conduit, furnish & install, directional bore (0630-2-12)LF170$25.25$62.00$21.25$50.74
0465Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH26$1,111.00$1,480.00$1,090.00$2,983.85
0470Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF23,165$2.85$2.30$2.40$6.63
0475Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF5,850$4.28$4.50$4.40$8.94
0480Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31)EACH21$2,711.00$2,280.00$2,550.00$5,024.03
0485Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51)EACH21$358.00$340.00$374.00$411.97
0490Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442)EACH26$14,422$680.00$13,800$20,096
0495Light pole complete, remove pole and foundation (0715-69000)EACH21$842.00$11,900$870.00$3,114.90
0500Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH47$915.00$1,340.00$950.00$2,009.61
FDOT contract T5914: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy