FDOT contract T5914 bid tabulation
SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD). Let by Florida DOT on October 28, 2026, Brevard, District 5. 4 bids received; low bid $20,411,474 by Masci General Contractors, Inc.
- Owner
- Florida DOT
- Letting
- 28 OCT 2026
- Pay items
- 102
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Masci General Contractors, Inc | $20,411,474 | Low |
| 2 | MJC Land Development, LLC | $20,537,298 | +1.0% |
| 3 | JR. Davis Construction Co., Inc. | $23,710,015 | +16% |
| 4 | Timothy Rose Contracting, Inc. | $70,803,189 | +247% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Masci General Contractors, Inc | 2. MJC Land Development, LLC | 3. JR. Davis Construction Co., Inc. | 4. Timothy Rose Contracting, Inc. |
|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $928,334 | $710,000 | $2,300,000 | $6,926,839 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $398,772 | $75,000 | $570,000 | $1,152,485 |
| 0015 | Special detour- temporary pavement (0102-2200) | SY | 1 | $35,724 | $47,000 | $45,000 | $44,398 |
| 0020 | Special detour- temporary earthwork/base (0102-2300) | CY | 1 | $15,500 | $25,000 | $10,000 | $11,693 |
| 0025 | Traffic control officer (0102-14) | HR | 1,080 | $90.00 | $80.00 | $155.00 | $150.00 |
| 0030 | Work zone sign (0102-60) | ED | 3,960 | $0.28 | $0.25 | $0.30 | $0.42 |
| 0035 | Temporary barrier, F&I, anchored (0102-71-15) | LF | 804 | $55.00 | $38.00 | $45.00 | $84.19 |
| 0040 | Temporary barrier, relocate, anchored (0102-71-25) | LF | 384 | $19.00 | $17.00 | $18.00 | $39.97 |
| 0045 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 33,660 | $0.15 | $0.10 | $0.15 | $0.18 |
| 0050 | Temporary raised/retroreflective pavement marker, type B (0102-78-2) | EACH | 583 | $3.27 | $4.50 | $6.50 | $10.20 |
| 0055 | Temporary crash cushion, redirective option (0102-89-1) | LO | 2 | $1,581.00 | $1,300.00 | $1,750.00 | $4,188.61 |
| 0060 | Portable changeable message sign, temporary PCMS will BE placed 14 days prior to construction (0102-99) | ED | 358 | $14.00 | $11.00 | $13.00 | $20.00 |
| 0065 | Portable regulatory, sign (0102-150-1) | ED | 660 | $7.00 | $4.50 | $5.00 | $8.00 |
| 0070 | Radar speed display unit (0102-150-2) | ED | 660 | $7.00 | $4.50 | $5.00 | $8.00 |
| 0075 | Sediment barrier (0104-10-3) | LF | 11,643 | $1.53 | $4.50 | $4.75 | $3.62 |
| 0080 | Floating turbidity barrier (0104-11) | LF | 98 | $35.00 | $56.00 | $20.00 | $24.28 |
| 0085 | Staked turbidity barrier- nylon reinforced PVC (0104-12) | LF | 5,913 | $7.00 | $9.00 | $12.00 | $10.12 |
| 0090 | Inlet protection system (0104-18) | EACH | 52 | $145.00 | $145.00 | $165.00 | $607.05 |
| 0095 | Litter removal (0107-1) | ACRE | 185.78 | $59.00 | $120.00 | $70.00 | $92.00 |
| 0100 | Mowing (0107-2) | ACRE | 185.78 | $125.00 | $83.00 | $110.00 | $180.00 |
| 0105 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $718,350 | $435,000 | $1,222,000 | $8,834,244 |
| 0110 | Regular excavation (0120-1) | CY | 8,284.30 | $11.50 | $8.50 | $6.00 | $82.82 |
| 0115 | Subsoil excavation (0120-4) | CY | 10,455.60 | $35.87 | $15.00 | $30.00 | $597.75 |
| 0120 | Embankment (0120-6) | CY | 46,943.50 | $19.25 | $35.00 | $24.00 | $140.20 |
| 0125 | Type B stabilization (0160-4) | SY | 39,057 | $12.35 | $20.10 | $12.00 | $46.18 |
| 0130 | Optional base, base group 04 (0285-704) | SY | 16,818 | $23.70 | $22.00 | $19.00 | $103.02 |
| 0135 | Optional base, base group 10 (0285-710) | SY | 18,488 | $39.82 | $31.00 | $24.00 | $162.68 |
| 0140 | Optional base, base group 11 (0285-711) | SY | 1,774 | $42.41 | $63.00 | $73.00 | $152.06 |
| 0145 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 182 | $7.00 | $6.00 | $21.00 | $36.07 |
| 0150 | Milling existing asphalt pavement, 3/4" avg depth (0327-70-19) | SY | 5,365 | $2.75 | $6.00 | $5.00 | $5.27 |
| 0155 | Superpave asphaltic conc, traffic B (0334-1-12) | TN | 2,682.20 | $145.29 | $160.00 | $165.00 | $419.48 |
| 0160 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 3,905.90 | $144.78 | $182.00 | $167.00 | $407.39 |
| 0165 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 3,254.30 | $158.69 | $182.00 | $210.00 | $758.48 |
| 0170 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 1,050.60 | $219.24 | $315.00 | $370.00 | $416.36 |
| 0175 | Miscellaneous asphalt (0339-1) | TN | 58.60 | $559.50 | $225.00 | $400.00 | $797.09 |
| 0180 | Inlets, DT bot, type D, <10' (0425-1541) | EACH | 11 | $15,789 | $13,675 | $14,600 | $18,824 |
| 0185 | Manholes, P-8, <10' (0425-2-61) | EACH | 2 | $14,473 | $6,100.00 | $6,400.00 | $15,539 |
| 0190 | Pipe culvert, optional material, other shape - ellip/arch, 24"SD (0430-174224) | LF | 26 | $458.00 | $504.00 | $335.00 | $347.06 |
| 0195 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 628 | $328.00 | $152.00 | $170.00 | $370.63 |
| 0200 | Pipe culvert,optional material,round, 24"S/CD (0430-175124) | LF | 399 | $399.00 | $180.00 | $230.00 | $366.41 |
| 0202 | Pipe culvert,optional material,round, jack & bore, 18" storm and cross drain (0430-185118) | LF | 94 | $1,411.00 | $2,450.00 | $1,900.00 | $2,976.87 |
| 0205 | Straight concrete endwalls, single, 0 degrees, round (0430-524100) | EACH | 5 | $5,500.00 | $9,100.00 | $8,700.00 | $12,268 |
| 0210 | Pipe filling and plugging- place out of service (0430-830) | CY | 7.60 | $400.00 | $1,700.00 | $1,300.00 | $704.85 |
| 0215 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 6 | $3,887.00 | $5,975.00 | $3,050.00 | $5,800.07 |
| 0220 | Mitered end section, optional round, 24" CD (0430-982129) | EACH | 5 | $3,992.00 | $7,375.00 | $4,100.00 | $6,101.23 |
| 0225 | Mitered end sect, optional - elliptical / arch, 24" SD (0430-984629) | EACH | 4 | $4,118.00 | $6,425.00 | $4,300.00 | $7,722.66 |
| 0230 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 238.50 | $321.50 | $290.00 | $274.00 | $339.30 |
| 0235 | Sound/noise barrier-inc foundation, permanent (0534-72101) | SF | 190,075 | $53.00 | $55.70 | $60.00 | $115.50 |
| 0240 | Guardrail -roadway, general (0536-1-1) | LF | 1,122 | $32.00 | $28.00 | $27.70 | $49.35 |
| 0245 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 10 | $258.00 | $63.00 | $61.00 | $600.00 |
| 0250 | Guardrail transition to rigid barrier, F&I- index 536- 002, approach TL-3 (0536-8122) | EACH | 1 | $2,998.00 | $4,100.00 | $3,980.00 | $8,349.97 |
| 0255 | Guardrail removal (0536-73) | LF | 495 | $5.00 | $2.00 | $2.00 | $6.00 |
| 0260 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 2 | $1,887.00 | $1,500.00 | $1,440.00 | $3,189.99 |
| 0265 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 3 | $3,558.00 | $3,700.00 | $3,650.00 | $5,399.98 |
| 0270 | Anti-graffiti coating, (0563-3) | SF | 172,795 | $1.95 | $0.40 | $0.50 | $3.67 |
| 0275 | Performance turf (0570-1-1) | SY | 101,668 | $4.00 | $3.40 | $4.00 | $8.93 |
| 0280 | Conduit, furnish & install, open trench (0630-2-11) | LF | 947 | $12.50 | $14.75 | $11.20 | $21.80 |
| 0281 | Fiber optic cable locator (0633-6) | DA | 165 | $174.00 | $56.00 | $166.00 | $452.16 |
| 0285 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 3 | $1,577.00 | $1,500.00 | $1,520.00 | $2,983.85 |
| 0290 | Pull & splice box, F&I, 24" X 36" cover size (0635-2-12) | EACH | 2 | $2,284.00 | $3,400.00 | $2,370.00 | $4,300.15 |
| 0295 | Electrical service wire, & install (0639-2-1) | LF | 947 | $5.98 | $8.00 | $5.80 | $25.62 |
| 0300 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 0.76 | $4,845.51 | $1,700.00 | $1,860.00 | $1,631.99 |
| 0305 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 0.25 | $5,370.83 | $1,690.00 | $1,870.00 | $1,631.99 |
| 0310 | Disputes review board, meeting- DO not bid (0999-20-1) | DA | 7 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 0315 | Disputes review board, hearing- DO not bid (0999-20-2) | EACH | 2 | $5,750.00 | $5,750.00 | $5,750.00 | $5,750.00 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $150,000 | $150,000 | $150,000 | $150,000 |
| 0325 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 2.80 | $8,546.51 | $3,500.00 | $3,320.00 | $8,368.75 |
| 0330 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 4 | $630.00 | $650.00 | $540.00 | $816.00 |
| 0335 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 3 | $2,310.00 | $2,950.00 | $1,040.00 | $3,192.59 |
| 0340 | Single column ground sign assembly, relocate (0700-1500) | EACH | 2 | $330.75 | $245.00 | $630.00 | $357.00 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 7 | $36.75 | $29.00 | $125.00 | $102.00 |
| 0350 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 1 | $14,280 | $13,600 | $8,900.00 | $26,275 |
| 0355 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 2 | $10,500 | $3,500.00 | $6,900.00 | $10,302 |
| 0360 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 2 | $2,100.00 | $1,375.00 | $1,990.00 | $2,519.39 |
| 0365 | Sign panel, furnish & install overhead mount, 21-30 SF (0700-3203) | EACH | 6 | $1,890.00 | $1,575.00 | $2,280.00 | $5,044.65 |
| 0370 | Sign panel, furnish & install overhead mount, 51-100 SF (0700-3205) | EACH | 1 | $6,090.00 | $4,375.00 | $5,900.00 | $12,107 |
| 0375 | Sign panel, furnish & install overhead mount, 101-200 SF (0700-3206) | EACH | 3 | $8,400.00 | $5,675.00 | $10,700 | $17,152 |
| 0380 | Sign panel, furnish & install overhead mount, 201-300 SF (0700-3207) | EACH | 2 | $630.00 | $9,075.00 | $13,700 | $24,214 |
| 0385 | Sign panel, remove, 21-30 SF (0700-3603) | EACH | 5 | $420.00 | $270.00 | $1,250.00 | $2,421.43 |
| 0390 | Sign panel, remove, 51-100 SF (0700-3605) | EACH | 1 | $630.00 | $1,170.00 | $930.00 | $4,842.86 |
| 0395 | Sign panel, remove, 101-200 SF (0700-3606) | EACH | 3 | $630.00 | $1,460.00 | $1,560.00 | $4,842.86 |
| 0400 | Sign panel, remove, 201-300 SF (0700-3607) | EACH | 1 | $630.00 | $1,754.69 | $3,430.00 | $7,062.52 |
| 0405 | Overhead static sign furnish & install, cantilever, 31- 40 FT (0700-4113) | EACH | 2 | $146,475 | $136,000 | $134,470 | $309,500 |
| 0410 | Overhead static sign deep foundation removal, cantilever (0700-4612) | EACH | 1 | $26,250 | $10,800 | $18,600 | $58,518 |
| 0415 | Raised pavement marker, type B (0706-1-3) | EACH | 598 | $6.30 | $5.50 | $6.60 | $10.20 |
| 0420 | Painted pavement markings, surface (0710-90) | LS | 1 | $15,383 | $8,170.00 | $16,200 | $13,849 |
| 0425 | Thermoplastic, standard, solid, 12" for interchange markings (0711-11103) | GM | 0.11 | $108,224 | $28,900 | $15,000 | $17,748 |
| 0430 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 2.80 | $7,350.00 | $8,500.00 | $7,800.00 | $10,229 |
| 0435 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 2.63 | $4,200.00 | $3,520.00 | $4,420.00 | $3,569.99 |
| 0440 | Thermoplastic, standard-open graded asphalt surfaces, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-15133) | GM | 1 | $11,550 | $4,080.00 | $12,200 | $4,283.99 |
| 0445 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 0.25 | $7,350.00 | $8,440.00 | $7,700.00 | $10,229 |
| 0450 | Thermoplastic, remove existing thermoplastic pavement markings- surface to remain (0711-17-1) | SF | 642 | $5.72 | $5.00 | $6.50 | $7.75 |
| 0455 | Conduit, furnish & install, open trench (0630-2-11) | LF | 5,536 | $11.12 | $14.00 | $10.45 | $26.13 |
| 0460 | Conduit, furnish & install, directional bore (0630-2-12) | LF | 170 | $25.25 | $62.00 | $21.25 | $50.74 |
| 0465 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 26 | $1,111.00 | $1,480.00 | $1,090.00 | $2,983.85 |
| 0470 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 23,165 | $2.85 | $2.30 | $2.40 | $6.63 |
| 0475 | Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13) | LF | 5,850 | $4.28 | $4.50 | $4.40 | $8.94 |
| 0480 | Luminaire & bracket arm- aluminum, furnish & install new luminaire and arm on new/existing pole (0715-5-31) | EACH | 21 | $2,711.00 | $2,280.00 | $2,550.00 | $5,024.03 |
| 0485 | Luminaire & bracket arm, luminaire and arm; pole remains (0715-5-51) | EACH | 21 | $358.00 | $340.00 | $374.00 | $411.97 |
| 0490 | Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 12' arm length (0715-61442) | EACH | 26 | $14,422 | $680.00 | $13,800 | $20,096 |
| 0495 | Light pole complete, remove pole and foundation (0715-69000) | EACH | 21 | $842.00 | $11,900 | $870.00 | $3,114.90 |
| 0500 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 47 | $915.00 | $1,340.00 | $950.00 | $2,009.61 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of October 28, 2026. Compiled by Mirage Metrics.