Timothy Rose Contracting, Inc.: FDOT bid record
Timothy Rose Contracting, Inc. submitted 18 bids on Florida DOT contracts in the data, from 27 MAR 2024 to 28 OCT 2026, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $71,697,623
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 5 | 2 | 40% |
| 2025 | 7 | 2 | 29% |
| 2026 | 6 | 1 | 17% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 10 | 2 | 20% |
| District 5 | 5 | 2 | 40% |
| District 1 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 17 | 10 (59%) | $0.01 | $0.13 |
| Sediment barrier | 0104-10-3 | LF | 16 | 9 (56%) | $1.80 | $2.60 |
| Performance turf, sod | 0570-1-2 | SY | 17 | 8 (47%) | $4.64 | $5.00 |
| Concrete sidewalk and driveways, 6" thick | 0522-2 | SY | 14 | 6 (43%) | $93.59 | $86.00 |
| Channelizing device- pedestrian LCD (longitudinal channelizing device) | 0102-74-8 | FD | 13 | 6 (46%) | $0.05 | $0.07 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 29 | 5 (17%) | $32.12 | $30.82 |
| Single column ground sign assembly, remove | 0700-1600 | EACH | 15 | 5 (33%) | $27.73 | $53.75 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 5 | 5 (100%) | $4,800.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 5 | 5 (100%) | $5,750.00 | $4,500.00 |
| Raised pavement marker, type B | 0706-1-3 | EACH | 29 | 4 (14%) | $4.71 | $5.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 26 | 4 (15%) | $19.41 | $16.54 |
| Detectable warnings | 0527-2 | SF | 14 | 4 (29%) | $40.00 | $35.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ranger Construction Industries, Inc. | 15 | 6 of 15 |
| Ohla USA Inc | 14 | 7 of 14 |
| C.W. Roberts Contracting, Inc. | 12 | 5 of 12 |
| Halley Engineering Contractors, Inc. | 9 | 4 of 9 |
| Preferred Materials Inc. | 6 | 0 of 6 |
| Watson Civil Construction, Inc. | 3 | 0 of 3 |
| Carr Construction, LLC | 3 | 1 of 3 |
| Florida Engineering & Development Corp | 3 | 1 of 3 |
| Masci General Contractors, Inc | 3 | 2 of 3 |
| Ajax Paving Industries of Florida LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | T5914 | District 5 | SR 9 (I-95) FROM VIERA BLVD TO SR 519 (FISKE BLVD) | 4 of 4 | $70,803,189 | +247% |
| 26 AUG 2026 | T4764 | District 4 | SR 512 FROM E OF I-95 TO W OF 106TH AVE | 2 of 9 | $2,456,988 | +7.0% |
| 20 MAY 2026 | T5882 | District 5 | ELLIS RD FROM J RODES BLVD TO WICKHAM RD | 2 of 10 | $36,850,784 | +16% |
| 29 APR 2026 | T4738 | District 4 | SR 5 (US 1 / FEDERAL HWY) FROM SR A1A (SE DIXIE HWY) TO SE.. | 4 of 7 | $19,453,372 | +22% |
| 25 MAR 2026 | T5876 | District 5 | SR 9 (I-95) FROM INDIAN RIVER CO LINE TO BABCOCK ST | 1 of 6 | $26,645,998 | Low, 1.0% under the second |
| 25 FEB 2026 | T4739 | District 4 | SR 9 (I-95) FROM N OF GLADES TO N OF SR 91 (FLORIDA TPK) | 3 of 5 | $6,257,205 | +22% |
| 29 OCT 2025 | T4727 | District 4 | SR A1A (NE OCEAN BLVD) FROM NE SHORE VILLAGE TER TO SR 732 ( | 13 of 13 | $8,512,920 | +74% |
| 30 APR 2025 | T5850 | District 5 | SR 5 (US 1) FROM N OF CENTURY OAKS CR TO N OF MYERS DR | 2 of 7 | $7,562,013 | +6.0% |
| 26 MAR 2025 | T4699 | District 4 | CR 510 (85TH ST) FROM CR 512 TO 87TH ST | 1 of 4 | $24,890,809 | Low, 9.0% under the second |
| 26 MAR 2025 | T5837 | District 5 | SR 5 FROM MYERS DR TO CRANE CREEK BRIDGE, NO 700006 | 1 of 3 | $10,009,766 | Low, 6.0% under the second |
| 26 FEB 2025 | T1892 | District 1 | SR 60 FROM W OF SADDLEBAG LAKE RD TO E OF TIGER LAKE RD | 2 of 5 | $13,776,955 | +4.0% |
| 29 JAN 2025 | T1897 | District 1 | SR 15 (US 441/US 98) AT 28TH ST, FROM NW 3RD ST TO N 120TH.. | 4 of 4 | $22,351,752 | +79% |
| 29 JAN 2025 | T4709 | District 4 | SR 716 (PORT ST LUCIE BLVD) AND SR 5 (US 1/NW FEDERAL HWY) | 2 of 4 | $7,298,995 | +7.0% |
| 04 DEC 2024 | T4675 | District 4 | SR 5 (US 1) FROM N OF SE FISCHER ST TO N OF SE DECKER AVE | 1 of 4 | $7,514,766 | Low, 2.0% under the second |
| 25 SEP 2024 | T4700 | District 4 | SR 70 (OKEECHOBEE RD)FROM IDEAL HOLDING RD TO W OF KINGS HWY | 4 of 5 | $18,881,706 | +12% |
| 31 JUL 2024 | T4683 | District 4 | SR 607 (EMERSON AVE) FROM N OF SR 614 (INDRIO RD) TO S OF... | 5 of 6 | $7,728,000 | +20% |
| 27 MAR 2024 | T1889 | District 1 | SR 17 FROM 5TH AVE TO CROOKED LAKE DR | 1 of 6 | $2,636,284 | Low, 12% under the second |
| 27 MAR 2024 | T4667 | District 4 | SR 5 (US 1) FROM DAVIS ST TO S END OF BRIDGE NO 700224 | 2 of 4 | $6,236,133 | +9.0% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.