FDOT contract T4709 bid tabulation

SR 716 (PORT ST LUCIE BLVD) AND SR 5 (US 1/NW FEDERAL HWY). Let by Florida DOT on January 29, 2025, St Lucie, District 4. 4 bids received; low bid $6,811,256 by Ranger Construction Industries, Inc..

Owner
Florida DOT
Letting
29 JAN 2025
Pay items
139
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ranger Construction Industries, Inc.$6,811,256Low
2Timothy Rose Contracting, Inc.$7,298,995+7.0%
3C.W. Roberts Contracting, Inc.$7,634,494+12%
4Ohla USA Inc$7,850,920+15%
FDOT contract T4709: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ranger Construction Industries, Inc.2. Timothy Rose Contracting, Inc.3. C.W. Roberts Contracting, Inc.4. Ohla USA Inc
0005Mobilization (0101-1)LS1$408,000$230,718$510,000$392,500
0010Mobilization (0101-1)LS1$272,000$233,087$385,000$392,500
0015Maintenance of traffic (0102-1)DA1$390,165$227,909$213,000$424,000
0020Maintenance of traffic (0102-1)DA1$271,190$244,216$162,000$424,000
0025Traffic control officer (0102-14)HR404$86.20$88.17$75.00$87.92
0030Work zone sign (0102-60)ED39,000$0.25$0.24$0.25$0.20
0035Temporary barrier, F&I, low profile, concrete (0102-71-13)LF1,587$55.20$60.87$60.00$52.00
0040Channelizing device- types I, II, VP, drum, or LCD (0102-74-1)ED72,980$0.15$0.14$0.15$0.10
0045Channelizing device- pedestrian LCD (longitudinal channelizing device) (0102-74-8)FD14,800$0.05$0.06$0.05$0.10
0050Arrow board / advance warning arrow panel (0102-76)ED952$6.15$6.29$7.00$7.00
0055Portable changeable message sign, temporary (0102-99)ED1,576$11.70$11.99$12.75$10.00
0060Temporary signalization and maintenance, intersection (0102-104)ED2,380$17.25$31.93$17.00$25.00
0065Temporary traffic detection and maintenance, intersection (0102-107-1)ED2,380$9.20$24.83$9.00$21.00
0070Type III barricade (0102-115)ED952$0.35$0.38$0.50$0.20
0075Removable tape, white, 12" crosswalk (0102-913-24)LF3,150$5.15$11.23$5.25$6.00
0080Sediment barrier (0104-10-3)LF7,733$2.95$2.28$8.50$0.01
0085Inlet protection system (0104-18)EACH124$107.90$188.09$131.75$200.00
0090Litter removal (0107-1)ACRE14.51$287.40$279.16$1,000.00$80.00
0095Mowing (0107-2)ACRE8.13$1,440.00$375.89$2,000.00$200.00
0100Monitor existing structures- vibration monitoring (0108-2)LS1$1,310.00$59,483$4,500.00$0.01
0105Monitor existing structures- vibration monitoring (0108-2)LS1$875.00$17,868$4,500.00$0.01
0110Clearing & grubbing (0110-1-1)ACRE1$89,400$294,783$90,000$300,000
0115Clearing & grubbing (0110-1-1)ACRE1$59,690$98,643$19,000$300,000
0120Removal of existing concrete (0110-4-10)SY5,943$15.50$39.70$55.75$35.00
0125Tree root and branch pruning (0110-22)EACH1$5,750.00$5,877.85$5,700.00$4,000.00
0130Type B stabilization (0160-4)SY832$28.30$33.75$32.00$0.01
0135Optional base, base group 09 (0285-709)SY706$50.00$56.42$112.00$117.00
0140Milling existing asphalt pavement, 3" avg depth (0327-70-4)SY1,971$7.80$6.25$7.80$9.00
0145Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6)SY118,018$2.50$2.98$4.00$2.80
0150Superpave asphaltic conc, traffic C (0334-1-13)TN385.10$249.60$250.17$330.00$195.00
0155Asphalt concrete friction course,traffic C, FC-12.5, PG (0337-7-83)TN9,991.10$177.80$188.92$206.00$205.00
0160Miscellaneous asphalt (0339-1)TN6.80$382.50$777.77$1,160.00$700.00
0165Plain cement concrete 6" (0350-3-1)SY140$93.60$161.21$266.00$73.00
0170Concrete class NS, gravity index 400-011 (0400-0-11)CY1.20$3,370.00$3,829.55$2,320.00$2,500.00
0175Manhole, adjust (0425-5)EACH79$100.00$917.67$930.00$950.00
0180Valve boxes, adjust (0425-6)EACH2$100.00$859.66$930.00$950.00
0185Pipe culvert,optional material,round, 18"S/CD (0430-175118)LF304$215.90$334.46$208.00$210.00
0190Cleaning & sealing existing pipe joint, 15" storm sewer (0430-821-23)EACH6$2,070.00$740.19$2,800.00$950.00
0195Cleaning & sealing existing pipe joint, 18" storm sewer (0430-821-25)EACH6$2,180.00$468.67$3,000.00$1,000.00
0200PVC pipe for back of sidewalk, (0430-963-1)LF36$121.00$95.65$92.00$95.00
0205Mitered end sect, replace (0430-990)EACH2$7,470.00$1,502.10$3,000.00$3,100.00
0210Pipe liner, cured in place, 18" (0431-1118)LF404$201.40$146.22$310.00$212.00
0215Pipe handrail - guiderail, aluminum (0515-1-2)LF138$68.10$55.25$54.00$60.00
0220Pedestrian/ bicycle railing, aluminum only,42" type 1 (0515-2311)LF128$185.20$111.68$109.00$162.00
0225Concrete curb & gutter, type F (0520-1-10)LF5,505$46.40$65.11$73.00$33.00
0230Concrete curb, type D (0520-2-4)LF154$33.35$28.53$56.00$30.00
0235Concrete sidewalk and driveways, 4" thick (0522-1)SY2,479$86.20$71.79$72.00$70.00
0240Concrete sidewalk and driveways, 6" thick (0522-2)SY2,159$189.40$100.23$98.50$162.00
0245Concrete ditch pavement, non reinforced, 4" (0524-1-2)SY3$402.50$1,211.77$463.00$45.00
0250Detectable warnings (0527-2)SF1,614$50.60$40.92$58.00$45.00
0255Guardrail -roadway, general (0536-1-1)LF228$29.65$24.69$24.00$26.00
0260Pipe rail for guardrail (0536-6)LF289$25.30$24.69$24.00$22.00
0265Guardrail removal (0536-73)LF221$2.85$4.82$3.50$2.50
0270Guardrail end treatment- trailing anchorage (0536-85-20)EACH2$1,740.00$1,904.43$1,850.00$1,600.00
0275Guardrail end treatment- parallel approach terminal (0536-85-24)EACH1$4,010.00$4,643.51$4,500.00$3,400.00
0280Performance turf, sod (0570-1-2)SY2,263$20.05$5.48$21.00$9.00
0285Painted pavement markings, standard, white, solid, 6" (0710-11101)GM6.63$0.01$1,514.21$2,000.00$1,500.00
0290Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125)LF24$0.01$1.62$2.30$3.00
0295Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131)GM3.33$0.01$405.37$560.00$800.00
0300Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141)GM1.35$0.01$405.37$790.00$800.00
0305Painted pavement markings, standard, white, arrows (0710-11170)EACH89$0.01$37.42$40.00$45.00
0310Painted pavement markings, standard, yellow, solid, 6" (0710-11201)GM4.33$0.01$1,514.71$2,000.00$1,500.00
0315Temporary portable access surfaces and curb ramps (0922-102-40)ED10,255$0.01$1.18$2.00$0.01
0320Partnering, DO not bid (0999-16)LS1$6,000.00$6,000.00$6,000.00$6,000.00
0325Initial contingency amount, DO not bid (0999-25)LS1$27,845$27,845$27,845$27,845
0330Initial contingency amount, DO not bid (0999-25)LS1$22,155$22,155$22,155$22,155
0335Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111)EACH94$603.50$617.18$520.00$525.00
0340Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112)EACH51$1,720.00$1,880.91$1,650.00$1,500.00
0345Single column ground sign assembly, remove (0700-1600)EACH119$57.50$29.39$57.00$50.00
0350Multi-column ground sign assembly, F&I ground mount, 20.0 SF (0700-2112)EACH1$6,270.00$7,993.88$4,750.00$5,500.00
0355Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114)EACH3$7,870.00$8,111.43$5,400.00$6,700.00
0360Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115)EACH1$10,900$13,519$8,700.00$9,500.00
0365Multi-column ground sign assembly, remove (0700-2600)EACH5$1,350.00$1,469.46$1,100.00$1,100.00
0370Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101)EACH1$357.50$411.45$265.00$310.00
0375Sign panel, furnish & install overhead mount, UP to 12 SF (0700-3201)EACH1$1,050.00$822.90$2,600.00$2,000.00
0380Sign panel, remove, UP to 12 SF (0700-3601)EACH1$126.40$58.78$57.00$110.00
0385Retroreflective sign strip- furnish and install, 5' (0700-13-15)EACH19$168.90$117.56$85.00$145.00
0390Object marker, type 1 (0705-10-1)EACH16$402.50$205.72$235.00$350.00
0395Raised pavement marker, type B (0706-1-3)EACH2,218$4.30$5.61$4.25$5.00
0400Painted pavement markings, durable paint, yellow, island nose (0710-12290)SF25$4.60$8.73$4.50$10.00
0405Painted pavement markings, surface (0710-90)LS1$32,100$15,747$32,000$25,000
0410Painted pavement markings, surface (0710-90)LS1$21,300$26,817$21,500$15,000
0415Thermoplastic, standard, solid, 12" for interchange markings (0711-11103)GM0.13$10,900$14,489$10,000$11,500
0420Thermoplastic, standard, solid, 12" for crosswalk and roundabout (0711-11123)LF4,421$3.60$2.74$3.75$5.00
0425Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124)LF64$5.45$4.99$5.50$7.00
0430Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125)LF1,194$7.25$7.48$7.30$9.00
0435Thermoplastic, standard, 2-4 dotted guideline/ 6-10 gap extension, 6" (0711-11141)GM1.35$2,870.00$2,868.78$2,900.00$4,400.00
0440Thermoplastic, standard, message or symbol (0711-11160)EACH42$86.20$137.20$86.00$250.00
0445Thermoplastic, standard, arrow (0711-11170)EACH138$64.40$112.26$65.00$90.00
0450Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224)LF109$5.10$4.99$5.00$7.00
0455Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241)GM0.35$2,810.00$2,868.78$2,800.00$4,300.00
0460Thermoplastic, preformed, white, solid, 24" for crosswalk (0711-14125)LF1,748$19.05$22.45$19.25$20.00
0465Thermoplastic, preformed, white, message (0711-14160)EACH36$341.50$343.01$340.00$300.00
0470Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101)GM6.63$5,550.00$7,733.23$5,600.00$5,800.00
0475Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102)GM0.08$6,730.00$7,982.69$6,800.00$5,900.00
0480Thermoplastic, standard-other surfaces, white, skip, 6",10-30 or 3-9 lane drop (0711-16131)GM8.28$1,390.00$2,868.78$1,400.00$4,400.00
0485Thermoplastic, standard-other surfaces white, skip, 12"- approach to toll plaza or 3-9 lane drop (0711-16133)GM0.07$2,490.00$3,622.14$2,500.00$7,100.00
0490Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201)GM4.33$5,200.00$7,733.23$5,250.00$5,800.00
0495Green-colored pavement markings, bike lane (0714-10)SF3,500$9.20$10.42$9.25$13.50
0500Conduit, furnish & install, open trench (0630-2-11)LF388$22.70$29.56$23.00$25.00
0505Conduit, furnish & install, directional bore (0630-2-12)LF139$32.75$29.86$33.00$25.00
0510Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH65$2,440.00$1,467.53$2,500.00$1,200.00
0515Electrical power service, F&I, underground, meter by contractor (0639-1122)AS2$6,870.00$25,304$7,000.00$21,500
0520Electrical power service, remove underground (0639-1620)AS2$832.00$1,040.52$830.00$880.00
0525Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12)LF2,339$2.55$3.61$2.50$3.00
0530Lighting conductors, F&I, insulated, no 4 to no 2 (0715-1-13)LF2,329$2.85$6.62$2.90$6.00
0535Lighting conductors, remove & dispose, contractor owns (0715-1-60)LF509$0.45$1.77$0.50$1.50
0540Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, cobra head (0715-11211)EACH16$1,850.00$1,773.61$1,850.00$1,500.00
0545Luminaire, F&I- replace existing luminaire on existing pole/arm, roadway, pole top (0715-11213)EACH4$1,840.00$1,773.61$1,870.00$1,500.00
0550Light pole complete, F&I, standard pole standard foundation, 30' mounting height, 12' arm length (0715-61142)EACH1$11,200$12,448$11,350$7,800.00
0555Light pole complete, F&I, standard pole standard foundation, 35' mounting height, 12' arm length (0715-61242)EACH3$11,500$12,803$11,600$8,200.00
0560Light pole complete, F&I, standard pole standard foundation, 45' mounting height, 0' arm length (0715-61400)EACH2$13,000$14,793$13,000$9,200.00
0565Light pole complete, F&I, utility conflict pole standard foundation, 30' mounting height, 16' arm length (0715-65166)EACH2$12,700$13,749$12,800$8,900.00
0570Light pole complete, F&I, utility conflict pole standard foundation, 35' mounting height, 16' arm length (0715-65266)EACH1$13,200$14,340$13,400$9,500.00
0575Light pole complete, F&I, utility conflict pole standard foundation, 40' mounting height, 16' arm length (0715-65366)EACH1$13,700$15,579$13,900$9,800.00
0580Light pole complete, remove pole and foundation (0715-69000)EACH1$1,430.00$3,405.34$1,450.00$2,900.00
0585Pole cable distribution system, furnish and install, conventional (0715-500-1)EACH27$1,250.00$1,040.52$1,250.00$900.00
0590Conduit, furnish & install, open trench (0630-2-11)LF276$26.45$21.28$26.75$17.00
0595Conduit, furnish & install, directional bore (0630-2-12)LF1,493$37.95$41.39$38.00$34.00
0600Signal cable- new or reconstructed intersection, furnish & install (0632-7-1)PI4$13,900$14,898$14,000$12,000
0605Signal cable, remove- intersection (0632-7-6)PI4$2,820.00$4,907.00$2,800.00$4,000.00
0610Fiber optic cable locator (0633-6)DA476$82.80$532.08$83.00$430.00
0615Pull & splice box, F&I, 13" X 24" cover size (0635-2-11)EACH51$2,010.00$1,486.74$2,000.00$1,200.00
0620Aluminum signals pole, (0646-1-11)EACH24$3,610.00$2,926.46$3,600.00$2,400.00
0625Aluminum signals pole, furnish install pedestrian detector post (0646-1-12)EACH4$1,430.00$2,778.67$1,450.00$2,300.00
0630Aluminum signals pole, remove (0646-1-60)EACH6$665.50$555.73$670.00$450.00
0635Vehicular traffic signal, furnish & install aluminum, 3 section, 1 way (0650-1-14)AS5$2,470.00$2,069.21$2,500.00$1,700.00
0640Vehicular traffic signal, remove- poles to remain (0650-1-60)AS1$332.00$354.73$330.00$285.00
0645Vehicular traffic signal, relocate- includes removal reinstallation (0650-1-70)AS6$1,210.00$1,389.33$1,200.00$1,100.00
0650Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- black with reflect border (0650-2102)EACH8$584.00$945.92$590.00$765.00
0655Vehicular signal auxiliaries, repair/replace/retrofit- & install, backplate- flexible required (0650-2109)EACH17$584.00$945.92$590.00$770.00
0660Pedestrian signal, furnish & install LED countdown, 1 way (0653-1-11)AS20$1,230.00$1,478.01$1,250.00$1,200.00
0665Pedestrian signal, furnish & install LED countdown, 2 ways (0653-1-12)AS4$2,530.00$2,542.18$2,500.00$2,100.00
0670Pedestrian signal, remove ped signal- pole/pedestal to remain (0653-1-60)AS22$82.80$307.43$83.00$250.00
0675Pedestrian detector, furnish & install, standard (0665-1-11)EACH28$370.00$277.87$370.00$225.00
0680Pedestrian detector, remove- pole/pedestal to remain (0665-1-60)EACH22$41.65$118.25$42.00$100.00
0685Traffic controller, modify (0671-2-40)EACH4$3,680.00$1,182.41$3,700.00$1,000.00
0690Internally illuminated sign, furnish & install, overhead mount, 12-18 SF (0700-5-22)EACH1$7,280.00$5,019.33$7,300.00$4,000.00
0695Internally illuminated sign, remove (0700-5-60)EACH1$332.00$396.11$330.00$320.00
FDOT contract T4709: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.

Every contract let that day: FDOT letting of January 29, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy