FDOT contract T1892 bid tabulation
SR 60 FROM W OF SADDLEBAG LAKE RD TO E OF TIGER LAKE RD. Let by Florida DOT on February 26, 2025, Polk, District 1. 5 bids received; low bid $13,238,320 by Ajax Paving Industries of Florida LLC.
- Owner
- Florida DOT
- Letting
- 26 FEB 2025
- Pay items
- 111
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ajax Paving Industries of Florida LLC | $13,238,320 | Low |
| 2 | Timothy Rose Contracting, Inc. | $13,776,955 | +4.0% |
| 3 | C.W. Roberts Contracting, Inc. | $14,937,008 | +13% |
| 4 | Preferred Materials Inc. | $16,633,183 | +26% |
| 5 | Hubbard Construction Company | $16,814,506 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ajax Paving Industries of Florida LLC | 2. Timothy Rose Contracting, Inc. | 3. C.W. Roberts Contracting, Inc. | 4. Preferred Materials Inc. | 5. Hubbard Construction Company |
|---|---|---|---|---|---|---|---|---|
| 0005 | Mobilization (0101-1) | LS | 1 | $492,600 | $346,681 | $949,063 | $1,282,860 | $771,482 |
| 0010 | Maintenance of traffic (0102-1) | DA | 1 | $901,450 | $206,169 | $403,481 | $766,000 | $985,251 |
| 0015 | Traffic control officer (0102-14) | HR | 520 | $108.11 | $83.20 | $95.96 | $105.00 | $115.95 |
| 0020 | Work zone sign (0102-60) | ED | 29,165 | $0.23 | $0.24 | $0.25 | $0.20 | $0.23 |
| 0025 | Business sign (0102-61) | EACH | 5 | $27.03 | $49.92 | $51.58 | $45.00 | $44.64 |
| 0030 | Temporary barrier, F&I, free standing (0102-71-16) | LF | 3,760 | $24.05 | $39.94 | $41.26 | $36.00 | $40.28 |
| 0035 | Channelizing device- types I, II, VP, drum, or LCD (0102-74-1) | ED | 142,705 | $0.13 | $0.01 | $0.11 | $0.10 | $0.11 |
| 0040 | Arrow board / advance warning arrow panel (0102-76) | ED | 600 | $5.52 | $5.55 | $5.73 | $5.00 | $5.44 |
| 0045 | Temporary crash cushion, redirective option (0102-89-1) | LO | 6 | $1,202.40 | $1,386.74 | $1,432.68 | $2,568.00 | $3,025.23 |
| 0050 | Portable changeable message sign, temporary (0102-99) | ED | 1,818 | $12.13 | $11.09 | $11.46 | $10.00 | $10.89 |
| 0055 | Type III barricade (0102-115) | ED | 17,518 | $0.29 | $0.31 | $0.32 | $0.30 | $0.27 |
| 0060 | Portable regulatory, sign (0102-150-1) | ED | 970 | $0.11 | $5.55 | $5.73 | $5.00 | $7.62 |
| 0065 | Radar speed display unit (0102-150-2) | ED | 970 | $0.11 | $5.55 | $5.73 | $5.00 | $7.62 |
| 0067 | Removable tape, white, solid 6" (0102-913-21) | GM | 0.05 | $16,547 | $16,641 | $13,951 | $12,234 | $14,278 |
| 0070 | Sediment barrier (0104-10-3) | LF | 10,062 | $0.90 | $1.28 | $1.41 | $2.25 | $0.97 |
| 0075 | Inlet protection system (0104-18) | EACH | 29 | $90.00 | $94.30 | $146.76 | $130.00 | $91.16 |
| 0080 | Litter removal (0107-1) | ACRE | 1,563.25 | $28.00 | $29.95 | $30.48 | $27.00 | $28.96 |
| 0085 | Mowing (0107-2) | ACRE | 1,073.71 | $72.00 | $77.65 | $79.03 | $70.00 | $75.07 |
| 0090 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $82,822 | $226,518 | $86,846 | $238,035 | $100,807 |
| 0095 | Clearing & grubbing (0110-1-1) | ACRE | 1 | $83,848 | $63,738 | $130,689 | $161,980 | $177,421 |
| 0100 | Regular excavation (0120-1) | CY | 1,670.30 | $57.68 | $18.30 | $53.28 | $55.45 | $70.57 |
| 0105 | Embankment (0120-6) | CY | 1,997.80 | $46.81 | $26.37 | $62.72 | $73.90 | $30.24 |
| 0110 | Type B stabilization (0160-4) | SY | 9,796 | $18.75 | $8.60 | $20.11 | $37.45 | $7.06 |
| 0115 | Optional base, base group 09 (0285-709) | SY | 7,885 | $27.25 | $26.28 | $35.22 | $53.75 | $28.23 |
| 0120 | Milling existing asphalt pavement, 3" avg depth (0327-70-4) | SY | 18,686 | $2.71 | $4.40 | $4.34 | $4.15 | $7.71 |
| 0125 | Milling existing asphalt pavement, 1 1/2" avg depth (0327-70-6) | SY | 16,113 | $5.22 | $8.51 | $9.93 | $9.05 | $14.06 |
| 0130 | Milling existing asphalt pavement, 3 3/4" avg depth (0327-70-20) | SY | 200,329 | $2.83 | $5.17 | $4.98 | $5.00 | $10.00 |
| 0135 | Asphalt pavement grooving (0328-1) | SY | 15,989 | $2.36 | $3.24 | $3.14 | $2.70 | $5.10 |
| 0140 | Superpave asphaltic conc, traffic E (0334-1-15) | TN | 2,030.20 | $172.72 | $177.76 | $180.27 | $185.95 | $199.31 |
| 0145 | Superpave asphaltic concrete, traffic E, PG76-22 (0334-1-55) | TN | 35,689.90 | $152.26 | $173.46 | $165.53 | $170.90 | $170.45 |
| 0150 | Asphalt concrete friction course, inc bit, FC-5, PG 76-22 (0337-7-25) | TN | 8,301.80 | $227.45 | $252.69 | $238.29 | $295.45 | $260.53 |
| 0155 | Asphalt concrete friction course,traffic E, FC-12.5, PG (0337-7-88) | TN | 2,947.70 | $196.05 | $235.16 | $232.88 | $302.85 | $292.78 |
| 0160 | Miscellaneous asphalt (0339-1) | TN | 11.40 | $1,043.60 | $582.68 | $867.45 | $836.25 | $1,036.16 |
| 0165 | Inlets, DT bot, type C,<10' (0425-1521) | EACH | 3 | $6,124.25 | $3,870.12 | $13,159 | $10,950 | $8,064.58 |
| 0170 | Inlets, gutter, type S, <10' (0425-1701) | EACH | 9 | $8,995.47 | $5,959.20 | $14,692 | $13,419 | $9,072.66 |
| 0175 | Pipe culvert,optional material,round, 18"S/CD (0430-175118) | LF | 857 | $151.30 | $120.79 | $198.79 | $223.55 | $201.61 |
| 0180 | Mitered end section, optional round, 18" CD (0430-982125) | EACH | 2 | $4,170.29 | $2,862.51 | $6,029.77 | $5,308.40 | $5,040.37 |
| 0185 | Concrete curb & gutter, type E (0520-1-7) | LF | 535 | $56.09 | $35.83 | $61.31 | $48.25 | $42.17 |
| 0190 | Traffic separator concrete- type I, 4' wide (0520-5-11) | LF | 116 | $78.32 | $76.33 | $74.85 | $58.50 | $94.26 |
| 0195 | Shoulder gutter- concrete (0520-6) | LF | 823 | $67.68 | $36.70 | $75.45 | $51.95 | $43.76 |
| 0200 | Concrete traffic railing- 32" F-shape (0521-5100) | LF | 47 | $2,757.81 | $494.81 | $2,822.37 | $567.10 | $2,116.95 |
| 0202 | Concrete sidewalk and driveways, 6" thick (0522-2) | SY | 155 | $81.91 | $82.29 | $135.68 | $140.70 | $91.59 |
| 0205 | Riprap, rubble, F&I, ditch lining (0530-3-4) | TN | 16.50 | $2,955.23 | $174.25 | $482.64 | $988.70 | $504.04 |
| 0210 | Bedding stone (0530-74) | TN | 8.90 | $285.03 | $125.73 | $446.26 | $1,173.70 | $705.65 |
| 0215 | Guardrail -roadway, general (0536-1-1) | LF | 265 | $30.39 | $30.53 | $31.10 | $27.55 | $30.30 |
| 0220 | Rub rail for guardrail, single sided rub rail (0536-5-1) | LF | 265 | $18.59 | $18.65 | $19.02 | $16.85 | $18.53 |
| 0225 | Special guardrail post- post for shallow mount (0536-7-3) | EACH | 6 | $118.56 | $277.35 | $121.34 | $107.50 | $118.22 |
| 0230 | Guardrail transition to rigid barrier, F&I- index 536- 001, approach TL-3 (0536-8112) | EACH | 1 | $3,301.59 | $3,313.70 | $3,378.89 | $2,992.95 | $3,291.99 |
| 0235 | Guardrail transition to rigid barrier, F&I- index 536- 001, trailing (0536-8113) | EACH | 1 | $1,442.92 | $1,448.90 | $1,476.70 | $1,306.05 | $1,438.72 |
| 0240 | Guardrail removal (0536-73) | LF | 326 | $2.37 | $3.66 | $2.43 | $2.15 | $2.36 |
| 0245 | Guardrail end treatment- trailing anchorage (0536-85-20) | EACH | 1 | $1,522.40 | $1,527.66 | $1,558.04 | $1,380.10 | $1,517.98 |
| 0250 | Guardrail end treatment- parallel approach terminal (0536-85-24) | EACH | 1 | $3,543.31 | $3,556.45 | $3,626.26 | $3,212.05 | $3,533.01 |
| 0255 | Performance turf, sod (0570-1-2) | SY | 44,887 | $5.31 | $4.09 | $6.43 | $3.80 | $8.30 |
| 0256 | Performance turf, sod and shoulder treatment index (0570-1-3) | SY | 414 | $11.57 | $9.56 | $16.58 | $3.80 | $44.38 |
| 0260 | Raised pavement marker, type B (0706-1-3) | EACH | 6,140 | $4.96 | $4.99 | $5.70 | $5.00 | $5.02 |
| 0265 | Painted pavement markings, standard, white, solid, 6" (0710-11101) | GM | 25.98 | $1,075.54 | $1,081.65 | $1,539.77 | $1,350.25 | $1,088.06 |
| 0270 | Painted pavement markings, standard, white, solid for interchange and urban island, (0710-11102) | GM | 0.55 | $1,323.75 | $1,331.27 | $1,726.22 | $1,513.75 | $1,327.12 |
| 0275 | Painted pavement markings, standard, white, solid for diagonal or chevron, 18" (0710-11124) | LF | 962 | $1.65 | $1.66 | $2.28 | $2.00 | $1.67 |
| 0280 | Painted pavement markings, standard, white, solid for stop line or crosswalk, 24" (0710-11125) | LF | 352 | $2.21 | $2.22 | $3.42 | $3.00 | $2.23 |
| 0285 | Painted pavement markings, standard, white, skip, 10-30 or skip, 6" wide (0710-11131) | GM | 12.40 | $496.41 | $499.23 | $798.50 | $700.25 | $502.04 |
| 0290 | Painted pavement markings, standard, white, 2-4 dotted guideline/ 6-10 dotted 6" (0710-11141) | GM | 0.05 | $661.87 | $665.63 | $903.58 | $792.45 | $631.70 |
| 0295 | Painted pavement markings, standard, white, arrows (0710-11170) | EACH | 166 | $27.58 | $27.73 | $39.91 | $35.00 | $27.90 |
| 0300 | Painted pavement markings, standard, yellow, solid, 6" (0710-11201) | GM | 11.63 | $1,075.54 | $1,081.65 | $1,540.01 | $1,350.45 | $1,087.71 |
| 0305 | Painted pavement markings, standard, yellow, solid for diagonal or chevron, 18" (0710-11224) | LF | 705 | $1.65 | $1.66 | $2.28 | $2.00 | $1.67 |
| 0310 | Painted pavement markings, standard, yellow, 2-4 dotted guideline/6-10 dotted extension, 6" (0710-11241) | GM | 1.35 | $661.87 | $665.63 | $799.44 | $701.05 | $665.73 |
| 0315 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 |
| 0320 | Initial contingency amount, DO not bid (0999-25) | LS | 1 | $50,000 | $50,000 | $50,000 | $50,000 | $50,000 |
| 0325 | Ground-in rumble strips, 8" sinusoidal (0546-72-3) | GM | 19.09 | $1,314.18 | $1,394.56 | $2,615.10 | $1,837.20 | $2,200.03 |
| 0330 | Single column ground sign assembly, F&I ground mount, than 12 SF (0700-1111) | EACH | 142 | $466.62 | $565.79 | $581.58 | $510.00 | $555.26 |
| 0335 | Single column ground sign assembly, F&I ground mount, 20.0 SF (0700-1112) | EACH | 28 | $1,813.53 | $1,996.90 | $2,052.63 | $1,800.00 | $1,959.75 |
| 0340 | Single column ground sign assembly, relocate (0700-1500) | EACH | 10 | $341.97 | $554.70 | $570.18 | $500.00 | $544.38 |
| 0345 | Single column ground sign assembly, remove (0700-1600) | EACH | 41 | $38.61 | $27.73 | $28.51 | $25.00 | $27.22 |
| 0350 | Multi-column ground sign assembly, F&I ground mount, 50.0 SF (0700-2114) | EACH | 2 | $6,184.10 | $7,211.05 | $7,412.29 | $6,500.00 | $7,076.87 |
| 0355 | Multi-column ground sign assembly, F&I ground mount, 100.0 SF (0700-2115) | EACH | 2 | $8,833.80 | $10,539 | $10,833 | $9,500.00 | $10,343 |
| 0360 | Multi-column ground sign assembly, relocate (0700-2500) | EACH | 1 | $5,846.55 | $5,546.96 | $5,701.76 | $5,000.00 | $5,443.75 |
| 0365 | Multi-column ground sign assembly, remove (0700-2600) | EACH | 4 | $882.50 | $1,996.90 | $2,052.64 | $1,800.00 | $1,959.75 |
| 0370 | Sign panel, furnish & install ground mount, UP to 12 SF (0700-3101) | EACH | 7 | $261.44 | $277.35 | $285.09 | $250.00 | $272.19 |
| 0375 | Sign panel, relocate, UP to 12 SF (0700-3501) | EACH | 2 | $110.31 | $138.67 | $142.55 | $125.00 | $136.10 |
| 0380 | Retroreflective sign strip- furnish and install, 5' (0700-13-15) | EACH | 165 | $95.97 | $138.67 | $142.54 | $125.00 | $136.09 |
| 0385 | Enhanced highway sign solar powered, remove - mount (0700-142902) | EACH | 2 | $1,323.75 | $2,527.19 | $570.18 | $500.00 | $735.57 |
| 0390 | Tubular marker, 36" yellow (0704-1-4) | EACH | 42 | $259.23 | $194.15 | $256.58 | $225.00 | $244.97 |
| 0395 | Object marker, type 1 (0705-10-1) | EACH | 30 | $231.66 | $305.08 | $313.60 | $275.00 | $299.41 |
| 0400 | Raised pavement marker, type B (0706-1-3) | EACH | 5,691 | $4.96 | $4.99 | $5.70 | $5.00 | $5.02 |
| 0405 | Painted pavement markings, durable paint, yellow, island nose (0710-12290) | SF | 200 | $5.52 | $5.55 | $11.40 | $10.00 | $5.58 |
| 0410 | Painted pavement markings, surface (0710-90) | LS | 1 | $63,981 | $64,345 | $106,509 | $70,000 | $64,738 |
| 0415 | Painted pavement markings, surface (0710-90) | LS | 1 | $2,206.24 | $2,218.78 | $11,404 | $10,000 | $2,232.36 |
| 0420 | Thermoplastic, standard, solid, 18" for diagonals and chevrons (0711-11124) | LF | 922 | $6.62 | $6.66 | $5.70 | $5.00 | $6.70 |
| 0425 | Thermoplastic, standard, solid, 24" for stop line and crosswalk (0711-11125) | LF | 366 | $7.72 | $7.77 | $6.84 | $6.00 | $7.81 |
| 0430 | Thermoplastic, standard, arrow (0711-11170) | EACH | 200 | $88.25 | $88.75 | $91.23 | $80.00 | $89.29 |
| 0435 | Thermoplastic, standard, yield line (0711-11180) | LF | 271 | $22.06 | $22.19 | $17.11 | $15.00 | $22.32 |
| 0440 | Thermoplastic, standard, yellow, solid, 18" for diagonal or chevron (0711-11224) | LF | 621 | $6.62 | $6.66 | $5.70 | $5.00 | $6.70 |
| 0445 | Thermoplastic, standard, yellow, 2-4 dotted guide line dotted extension line, 6" (0711-11241) | GM | 1.35 | $3,309.37 | $3,328.18 | $3,428.68 | $3,006.70 | $3,331.13 |
| 0450 | Thermoplastic, standard-open graded asphalt surfaces solid, 6" (0711-15101) | GM | 13.44 | $7,611.54 | $7,654.80 | $6,499.53 | $5,703.80 | $7,701.04 |
| 0455 | Thermoplastic, standard-open graded asphalt surfaces, solid, 8" (0711-15102) | GM | 0.48 | $8,824.98 | $8,875.13 | $7,114.65 | $6,239.00 | $8,798.36 |
| 0460 | Thermoplastic, standard-open graded asphalt surfaces, skip, 6",10-30 skip or 3-9 lane (0711-15131) | GM | 12.40 | $2,206.24 | $2,218.78 | $3,422.16 | $3,000.95 | $2,231.27 |
| 0465 | Thermoplastic, standard-open graded asphalt surfaces, 6", 6-10 dotted managed lane marking (0711-15171) | GM | 0.05 | $3,309.37 | $3,328.18 | $3,873.02 | $3,396.25 | $3,159.06 |
| 0470 | Thermoplastic, standard-open graded asphalt surfaces, yellow, solid, 6" (0711-15201) | GM | 10.98 | $7,611.54 | $7,654.80 | $6,502.97 | $5,702.60 | $7,698.11 |
| 0475 | Thermoplastic, standard-other surfaces, white, solid, 6" (0711-16101) | GM | 0.01 | $7,721.86 | $7,765.75 | $9,123.08 | $8,000.00 | $6,010.77 |
| 0480 | Thermoplastic, standard-other surfaces, white, solid, 8" (0711-16102) | GM | 0.06 | $8,824.98 | $8,875.13 | $6,516.35 | $6,666.65 | $8,504.29 |
| 0485 | Thermoplastic, standard-other surfaces, yellow, solid, 6" (0711-16201) | GM | 0.40 | $7,721.86 | $7,765.75 | $5,944.69 | $5,213.05 | $7,636.99 |
| 0490 | Permanent tape, white, solid, 6" for concrete bridges (0713-103101) | GM | 0.09 | $27,578 | $27,735 | $34,087 | $29,891 | $27,298 |
| 0495 | Permanent tape, white, 10-30 6" wide, for concrete surfaces (0713-103181) | GM | 0.09 | $13,237 | $13,313 | $11,156 | $9,782.60 | $13,103 |
| 0500 | Permanent tape, yellow, solid, for concrete bridges (0713-103201) | GM | 0.09 | $27,578 | $27,735 | $34,087 | $29,891 | $27,298 |
| 0505 | Permanent tape, black, 10-30 6" wide, for concrete surfaces (0713-103381) | GM | 0.08 | $13,237 | $13,313 | $11,265 | $9,878.05 | $13,067 |
| 0510 | Preformed/permanent tape, remove (0713-107) | SF | 729 | $6.62 | $6.66 | $5.70 | $5.00 | $6.12 |
| 0515 | Conduit, furnish & install, open trench (0630-2-11) | LF | 1,518 | $23.83 | $19.97 | $20.86 | $21.60 | $21.18 |
| 0520 | Pull & splice box, F&I, 13" X 24" cover size (0635-2-11) | EACH | 10 | $2,151.09 | $3,320.60 | $956.85 | $1,950.00 | $2,190.49 |
| 0525 | Lighting conductors, F&I, insulated, no.8 - 6 (0715-1-12) | LF | 4,547 | $3.59 | $5.05 | $5.21 | $3.25 | $4.71 |
| 0530 | Lighting conductors, remove & dispose, contractor owns (0715-1-60) | LF | 1,516 | $1.49 | $2.61 | $0.57 | $1.35 | $0.59 |
| 0535 | Light pole complete, relocate (0715-68000) | EACH | 4 | $8,041.76 | $10,784 | $4,258.88 | $7,290.00 | $4,348.70 |
| 0540 | Pole cable distribution system, furnish and install, conventional (0715-500-1) | EACH | 10 | $1,003.84 | $1,108.29 | $1,237.12 | $910.00 | $1,162.79 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from FDOT's tabulation for this contract. FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
Every contract let that day: FDOT letting of February 26, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.