FDOT letting results, February 25, 2026
17 contracts let by Florida DOT on February 25, 2026, $136,415,401 in low bids, a median of 5 bidders per contract.
- Owner
- Florida DOT
- Contracts
- 17
- Low bids, total
- $136,415,401
- Data through
- 28 OCT 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| T7583 | SR 56 AND CR 581 (BRUCE B DOWNS BLVD) FROM BRUCE B DOWNS BL. | District 7 | 5 | Preferred Materials Inc. | $19,729,686 | $19,822,783 | 0.0% | FDOT |
| T2A37 | SR 228 FROM HART BRIDGE TO BEACH BLVD | District 2 | 5 | Gosalia Concrete Constructors, Inc. | $17,205,225 | $18,727,378 | +9.0% | FDOT |
| T1813 | SR 45 (US 41) FROM N OF EDWARDS DR TO N MAGELLAN... | District 1 | 4 | Superior Asphalt, Inc. | $15,369,593 | $15,474,399 | +1.0% | FDOT |
| T1916 | SR 72 FROM SR 45 (US 41) TO SAWYER RD | District 1 | 5 | Preferred Materials Inc. | $14,860,718 | $16,198,185 | +9.0% | FDOT |
| T2A58 | SR 202 (BUTLER BLVD) FROM BELFORT RD TO HODGES BLVD | District 2 | 3 | Preferred Materials Inc. | $14,200,844 | $15,639,594 | +10% | FDOT |
| T3966 | SR 368 (23RD ST) AND SR 75 (US 231) FROM E OF SR 390 TO... | District 3 | 4 | Roberts and Roberts, Inc. | $11,361,185 | $11,391,994 | 0.0% | FDOT |
| T7601 | SR 60 FROM W OF BEN T DAVIS BEACH ENTRACE TO E OF BAYPORT DR | District 7 | 6 | Preferred Materials Inc. | $7,094,361 | $7,635,829 | +8.0% | FDOT |
| T2A33 | SR 15 (US 17 / REID ST) AND SR 20 (CRILL AVE) FROM MEMORIAL | District 2 | 8 | Halifax Paving, Inc. | $6,270,148 | $7,125,421 | +14% | FDOT |
| T3928 | SCOTTS FERRY RD OVER BEAR CREEK, BRIDGE NO 464419 | District 3 | 6 | Murphree Bridge Corporation | $5,598,308 | $5,769,179 | +3.0% | FDOT |
| T2A57 | SR 15 (US 17 / PARK AVE) FROM DOCTORS INLET TO WELLS RD | District 2 | 5 | Preferred Materials Inc. | $5,326,772 | $5,913,228 | +11% | FDOT |
| T2A60 | SR 55 (US 221) FROM SR 10 (US 90) TO THE JEFFERSON CO LINE | District 2 | 2 | Anderson Columbia Co., Inc. | $5,212,163 | $5,564,168 | +7.0% | FDOT |
| T4739 | SR 9 (I-95) FROM N OF GLADES TO N OF SR 91 (FLORIDA TPK) | District 4 | 5 | Ranger Construction Industries, Inc. | $5,138,833 | $6,026,007 | +17% | FDOT |
| T2A59 | SR 500 (US 27) FROM NE 10TH ST TO MARION CO LINE | District 2 | 6 | Whitehurst, V. E. & Sons, Inc. | $3,937,846 | $4,474,478 | +14% | FDOT |
| T4751 | SR 704 (OKEECHOBEE BLVD) FROM E OF SR 809 (MILITARY TR) TO.. | District 4 | 4 | Ohla USA Inc | $2,346,009 | $2,356,839 | 0.0% | FDOT |
| T6619 | SR 969 (NW 72 AVE) AND SR 826 AT SR 948 (NW 36 ST) AT SR... | District 6 | 6 | Bacallao Construction & Engineering Development, LLC D/B/A BC&E | $1,640,113 | $1,699,417 | +4.0% | FDOT |
| T2A36 | SR 103 (LANE AVE) AND SR 111 (EDGEWOOD AVE) AT S OF MANOTAK | District 2 | 2 | Chinchor Electric Inc. | $974,221 | $984,265 | +1.0% | FDOT |
| T5868 | SR A1A FROM HIDDEN COVE DR TO SEA DUNES DR | District 5 | 11 | Concept Construction and Demoli | $149,377 | $149,964 | 0.0% | FDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than FDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.